Summary
Overview
Work History
Education
Skills
Contracts
Languages
Timeline
Generic

Fernando Chicas

Bladensburg,MD

Summary

Professional Project Management Specialist with experience working with teams to accomplish short- and long-term project goals. Managed budgets and monitored project costs. HVAC and Refrigeration Technician skilled at communicating with vendors, team members and customers. Excellent organization skills to manage multiple time-sensitive work orders.

Overview

10
10
years of professional experience

Work History

Hvac LEAD Install Technician

CroppMetcalfe
01.2019 - 01.2020
  • Installing, maintaining and repairing ventilation and air conditioning systems and equipment
  • Ensure every job is done on time and left clean
  • Explain to customers how to properly use equipment and controls
  • Adhered to all company policies and safety procedures
  • Performed installation of compressors, Fan motors/blades leak search units and repair leaks, multi-unit controls
  • Trained new technicians and ensured proper work is done
  • Performed inspections and ensured all installed were done by code to pass any type of inspection
  • Collected balance from every install and make sure homeowners were satisfied with all work that was done.
  • Consistently met or exceeded project deadlines through effective time management and task delegation within the team.
  • Implemented innovative tools and technologies to improve overall efficiency in completing installations tasks.

Hvac install Assistant Technician

Comfort Wizards
01.2019 - 01.2020
  • Installing, maintaining and repairing ventilation and air conditioning systems and equipment
  • Cleaning, adjusting and repairing systems
  • Assisting with customers' queries
  • Coordinated with general contractors and customers to resolve any issues logistically
  • Installed new mylar ducting (R-6 and both silver and green R-8)
  • Install new thermostats
  • Fabricate and install residential ductwork
  • Use of power tools and heavy machinery to get the job done efficiently
  • Engage in troubleshooting, repairs, replacement of HVAC systems when needed
  • Perform preventative maintenance of residential and commercial systems
  • Hang and adjust duct work accordingly
  • Connect drain lines.

Project Manager

Capitol Paving
01.2021 - 03.2024
  • Developed implementation methodologies to rein in project costs while meeting key milestones
  • Developed and initiated projects, including managing costs, schedule and performance
  • Identified, reviewed and applied policies and procedures by exercising informed judgment to achieve optimal performance
  • Updated operational methods, oversaw accounting procedures, tracked information and compiled data to improve efficiency
  • Eliminated discrepancies by reviewing performance, status and safety adherence
  • Provided accurate, detailed quantity take-offs from project drawings and technical specifications
  • Achieved project deadlines by coordinating with contractors to manage performance
  • Helped Ensure compliance with MOT plans.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Mentored junior team members in project management best practices to enhance their skills and contribute to better overall performance.
  • Maintained open communication by presenting regular updates on project status to customers.
  • Met project deadlines without sacrificing build quality or workplace safety.

Assistant Manager

Mar y Sol Restaurant
01.2016 - 01.2019
  • Responsible for ensuring that all financial (invoices, reporting) and personnel/payroll related administrative duties are completed accurately, on time and in accordance with company policies and procedures
  • Enforced sanitary practices for food handling, general cleanliness, and maintenance of kitchen and dining areas.
  • Scheduled staff shifts to ensure proper coverage during peak shopping hours without exceeding labor budgets.
  • Oversaw daily cash reconciliations, ensuring accurate financial reporting and minimizing discrepancies.
  • Ensured compliance with all safety regulations by conducting regular inspections of equipment/operations within the store.

Line Cook

Chipotle
Greenbelt, MD
2014.03 - 2015.11
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
  • Skilled at working independently and collaboratively in a team environment.
  • Learned and adapted quickly to new technology and software applications.
  • Worked well in a team setting, providing support and guidance.
  • Self-motivated, with a strong sense of personal responsibility.
  • Identified issues, analyzed information and provided solutions to problems.
  • Followed health, safety and sanitation guidelines while preparing and serving food.

Education

Wake Technical Community College
Raleigh, NC
01.2018

High School Diploma -

Bladensburg High School
Bladensburg, MD
05.2014

Skills

    • Project planning and development
    • Advanced understanding of Excel
    • Bilingual with Spanish and English
    • Staff Management
    • Advanced Problem Solving
      • Safety and compliance
      • Training/ certifications
      • APNGA Portable Nuclear Gauge Safety & USDOT Hazmat Certification April 18, 2022
      • Universal EPA License June 20, 2019
      • Technical Support

Contracts

  • DCKA-2021-C-0060, Non-Citywide Local Pavement Restoration, Washington, DC, Performed compactions test's, measures roadway for milling and paving., Communicated with inspectors to ensure quantities were correct and to code.
  • DCKA-2018-C-0030, Local Pavement Restoration, Washington, DC, Performed compactions test's, measures roadway for milling and paving., Communicated with inspectors to ensure quantities were correct and to code.
  • DCKA-2021-C-0061, Roadway Sign Maintenance & Backlog Project, Washington, DC, Ensured that inventory was properly maintained, tracked all materials and equipment needed for the jobs to be completed., Created daily schedule and ensured all laborers knew the task at hand., Made Reports for all Work Orders completed and created invoices to report to DDOT., Coordinated with DDOT and various contractors to install signs of all sizes and locations.

Languages

Spanish
Native or Bilingual

Timeline

Project Manager

Capitol Paving
01.2021 - 03.2024

Hvac LEAD Install Technician

CroppMetcalfe
01.2019 - 01.2020

Hvac install Assistant Technician

Comfort Wizards
01.2019 - 01.2020

Assistant Manager

Mar y Sol Restaurant
01.2016 - 01.2019

Line Cook

Chipotle
2014.03 - 2015.11

Wake Technical Community College

High School Diploma -

Bladensburg High School
Fernando Chicas