Floyd Green

Construction Manager
Roseville,CA

Summary

Dynamic and results-driven construction management professional with over 20 years of experience leading high-performing teams in large-scale projects. Proven track record of delivering complex construction initiatives on time and within budget while fostering strong client relationships and ensuring compliance with industry standards. Seeking a challenging senior position in a prominent construction or management firm to leverage extensive expertise in project management, strategic planning, and team leadership. Authorized to work in the U.S. and open to exploring international opportunities requiring sponsorship.

Overview

35
35
years of professional experience

Work History

Construction Manager

Endeavor Wireless
01.2023 - 01.2026
  • Responsible for construction of DISH New Site Builds in the SF Bay Area.
  • Activities include: Pre-construction site walks, checking client BOM for completeness and ordering parts not included in BOM such as FRP and Steel.
  • Once we receive NTP from various landlords we start the Civil Work first, in parallel with the tower (or rooftop) work.
  • We coordinate with power companies to obtain electrical service at new sites.
  • We are responsible for Green Light Testing (integration) when site is complete and then perform BP Final inspections with jurisdictions.

Construction Manager

AT&T
11.2021 - 01.2023
  • Responsible for all Site Acquisition (SAQ) and permitting activities for New Cell Site Builds (NSBs) for AT&T Northern California territory (Bakersfield to Oregon border and Nevada to Utah border).
  • Activities include: Site Design Walks, Zoning and Construction drawing review and hand-off SAQ package to Construction crews.

Construction Manager

Betacom
02.2021 - 11.2021
  • Responsible for all activities to decommission redundant Clearwire and Sprint sites in the San Francisco Bay area.
  • Now that T-Mobile and Sprint have merged there is no need for multiple cell sites to service the same geographic area.
  • These activities include site walks to take photos and measurements, negotiate pricing with GCs and supervise the actual de-construction of the site and follow up with landlords to assure they are satisfied with the results.
  • I also work with PG&E and other power providers to return their meters to them.

Construction Manager II

Vinculums LLC (now QualTek Wireless)
03.2018 - 07.2020
  • Provide program and construction management services to Vinculums for AT&T Turf project on New Site Builds (NSB) in Northern California market.
  • Responsibilities include site acquisition, engineering, environmental, bid walks and award, construction and Acceptance.
  • Responsible for all program and construction management activities required to implement NSB in this market per AT&T Site Build Plan, schedule and budget.

Construction Manager

SAC Wireless
04.2017 - 03.2018
  • Provide program and construction management services to Nokia and SAC Wireless on the Placer County Water Authority (PCWA) in Foresthill, CA.
  • Responsibilities included implementation of Control System to tie existing facilities and components into an overall master SCADA system capable of controlling remote water facilities and electric generation sites.
  • Responsible for all program and construction management activities required for submittal review, procurement, installation, and final integration of all equipment and systems.

Construction Manager II

Ridge Communications
02.2016 - 11.2016
  • Provide program and construction management services to Ridge Communications for Verizon LTE projects on overlay sites in Northern California market.
  • Responsibilities include site acquisition, engineering, environmental, bid walks and award, construction and Acceptance.
  • Responsible for all program and construction management activities required to implement LTE overlay projects in this market per Verizon Site Build Plan schedule and budget.
  • My specialty is RXAIT installation/removal, integration and troubleshooting RAN performance issues.
  • Managed design and construction on multiple Small Cell projects.
  • Design - Performed design walks with RF group and A&E firms and redlined construction drawings for constructability and verified interface with power and fiber providers (lit and dark fiber).
  • Construction – Managed installations on Joint Pole Authority (JPA) sites in compliance with G095 standards, coordinated pole swaps and mods with PG&E.
  • Also, performed HUB site construction work.
  • Ridge also installed the DAS systems for Levi’s Stadium for 2016 Super Bowl and the new Golden I Arena in Sacramento.

Construction Manager II

Ericsson
11.2012 - 02.2016
  • Provide program and construction management services to Ericsson for AT&T Turf project on 1C LTE, 2C, 3C LTE overlays sites in Northern California market.
  • Responsibilities include site acquisition, engineering, environmental, bid walks and award, construction and Acceptance.
  • Responsible for all program and construction management activities required to implement 1C, 2C, 3C LTE and WCS in this market per AT&T Site Build Plan schedule and budget.
  • My specialty is RXAIT installation, integration and troubleshooting RAN performance issues.

Program Manager 1C LTE/NSB

General Dynamics
02.2012 - 11.2012
  • Provide program and construction management services to General Dynamics for AT&T Turf project on 40 850/1900 1C UMTS overlays sites and 100 New Site Builds (NSB) throughout New Mexico and Colorado.
  • Responsibilities include site acquisition, engineering, environmental, bid walks and award, construction and Acceptance.
  • Responsible for all program and construction management activities required to implement 850/1900 1C UMTS and NSB in this market per AT&T Site Build Plan schedule and budget.
  • My specialty is RXAIT installation, integration and troubleshooting RAN performance issues.

Construction Manager II

Ericsson
02.2010 - 01.2012
  • Provide program and construction management services to Ericsson for AT&T Turf project on 1755 sites for 850/1900 UMTS overlays throughout Northern California and Nevada.
  • Responsibilities include site acquisition, engineering, environmental, bid walks and award, construction and Acceptance.
  • Responsible for all program and construction management activities required to implement 850/1900 UMTS in this market per AT&T Site Build Plan schedule and budget.
  • Current specific assignment is to manage all (700+) RXAIT/MCPA sites.
  • 95% of these sites are in San Francisco with the other 5% all over Northern California and Nevada.

Sr. Program Manager

TPS Inc. - Northeast Region
10.2008 - 02.2010
  • Responsible for business development, contract negotiations, market office set-up and staffing, logistics, construction scheduling, construction execution and closeout process in all markets.
  • Responsible for Safety, Quality and Training programs company-wide.
  • Current clients include: AT&T – Bechtel Turf Contract – Philadelphia, AT&T – Black & Veatch Turf Contract – Upstate NY, AT&T – Black & Veatch Turf Contract – NYC, Alcatel-Lucent/Cricket – Baltimore and Philadelphia markets, Alcatel-Lucent/T-Mobile – Baltimore and Philadelphia markets, Alcatel-Lucent/Sprint – Baltimore and Philadelphia markets, Ericsson – Baltimore market, Velocitel/T-Mobile – Philadelphia market.
  • General Contractor providing program and construction management services to multiple telecommunications companies in the Northeast Region.

Construction Manager

General Dynamics
08.2008 - 10.2008
  • Provide program and construction management services to General Dynamics for AT&T on New Site Build sites in Arizona and New Mexico.
  • Activities include site acquisition, engineering, environmental, bid walks and award, construction and Acceptance.
  • Responsible for all program and construction management activities required to build new cell sites per AT&T Site Build Plan schedule and budget.

Program Manager

Parsons
01.2008 - 08.2008
  • Provide program and construction management services to Nokia for T-Mobile on UMTS overlays at 375 cell sites in the Denver/Colorado Springs/Boulder/Ft. Collins metro areas.
  • Activities include site acquisition, engineering, construction and Acceptance.
  • Responsible for all program and construction management activities required to upgrade cell sites to the latest cellular technology per T-Mobile Site Build Plan schedule and budget.

Program Manager

Aramco Oil Co.
Saudi Arabia
08.2006 - 12.2007
  • Responsible to manage the $40B development and implementation of process control systems for Aramco oil field projects from inception to final acceptance.
  • Also work with the Communications Division to assure proper communication networks are implemented to support control systems and other operational requirements.

Project Manager

Citigroup
Silver Spring, Maryland
10.2005 - 08.2006
  • Owner representative for Citigroup managing construction and construction management of an expansion and upgrade to an existing Citigroup Data Call Center.
  • This project included construction and commissioning of all mechanical, electrical, plumbing (MEP), fiber optic communications systems, servers, Central Plant equipment (HVAC, chillers, cooling towers, emergency generators, emergency turbine generators).
  • Primary interface with architect, engineering and contractor on all project matters.
  • Responsible to process change orders and applications for payment.
  • Track and control project costs and contingency authorizations on a $75M Guaranteed Maximum Price (GMP) Contract.

Project Manager

Citigroup
Jacksonville, Florida
02.2005 - 10.2005
  • Citigroup (Owner) representative managing construction and construction management of a 650,000 sq. ft. Data Call Center.
  • This project included construction and commissioning and testing of all mechanical, electrical, plumbing (MEP), Central Plant equipment (HVAC and emergency generators), fiber optic communications systems, servers, CAT-6 data cable distribution.
  • Primary interface with architect, engineering and contractor on all project matters.
  • Responsible to process change orders and applications for payment.
  • Track and control project costs and contingency authorizations on a $100M Guaranteed Maximum Price (GMP) Contract.

Project Manager

Bechtel Corporation
Pleasanton, California
04.2004 - 01.2005
  • Provided construction management services to Cingular Wireless for site acquisition, engineering and construction of New Cell Site builds in the San Francisco Bay Area.
  • Work activities included identifying candidates in search rings, coordinating these candidates with RF engineering, leasing best candidate, zoning, due diligence, construction of site/T1/power and turnover.
  • Responsible for all activities to bring new cell sites 'on air' per the Cingular New Site Build Plan schedule and budget.

Market Manager

Bechtel Corporation
Syracuse, New York
07.2002 - 04.2004
  • Provided program and construction management services to Cingular Wireless on this $12M project for implementation of GSM technology on 424 cellular sites in the Upstate NY area.
  • Work activities ranged from site audits through Turnover packages.
  • Upgraded the DC systems on 400 of these existing sites and converted over 200 sites from MW to T1 back haul.
  • The Upstate NY market also included 35 'new build' sites down the Historic I-87 corridor from Albany to Poughkeepsie, NY.
  • Work activities included identifying candidates in search rings, coordinating these candidates with RF engineering, leasing best candidate, zoning, due diligence, construction and turnover.
  • Constructed and coordinated the network implementation of overlays, DC upgrades, radio adds and new builds with Nokia, the carrier-selected GSM equipment supplier for Cingular in this market.

Prime Contract Administrator

Lucent Technologies
Riyadh, Saudi Arabia
04.1998 - 04.2000
  • Administer the 200K, 300K and 500K GSM Contracts (1 million subscribers).
  • The value of these three contracts totaled over $900M and included 2600 new cell site builds.
  • Responsibilities included: Respond to all Client (Saudi Telecom) correspondence regarding these contracts.
  • Develop Change Orders with the various elements (GSM, Civil, COM/IS, Data Networking) including extensions of contracts and associated costs.
  • Interface with Saudi Telecom to expedite approval of Change Orders.
  • Track acceptance documentation regarding testing and acceptance e.g. System Qualification Tests (SQTs), Type Approvals (TAs), Preliminary Acceptance Tests (PATs), Preliminary Acceptance Certificates (PACs), Outstanding Items Lists (OILs), Field Evaluation and Inspection Plans (FETIPs), and Final Acceptance (FAC).
  • Update Contracts and Unit Price Schedules with approved Change Order pricing and changes to contract terms and conditions.
  • All Change Orders and Unit Price Schedules had to be submitted and approved in English and Arabic.
  • Directly supervised 6 persons; indirectly supervised 10-15 persons in a matrix organization across Elements (Long Distance, DMW, FON, COM/IS, ISP, etc.).

Program/Construction Manager

Lucent Technologies
Riyadh, Saudi Arabia
04.1997 - 04.1998
  • Responsible for program and construction services and acceptance of all Access (copper) projects for the Central Region of Saudi Arabia.
  • Responsibilities included: Prioritize, plan and schedule the entire Saudi Arabia - Central Region Work Plan to provide copper phone lines to new subscribers in accordance with schedules.
  • Duties included: Supervise a large work force of subcontractors installing manholes and PVC conduit systems for Primary cabling from the Main Distribution Frame (MDF) to telephone cabinets and Secondary cabling from cabinets to subscribers.
  • These projects also included fiber optic CAN rings from telephone exchanges to remote RISLUs (switches).
  • Supervise 20-30 Lucent (multi-cultural) inspectors in all aspects of construction inspection activities including Quality, Safety, testing and documenting unit price quantities for client invoices.
  • Interface with multi-cultural subcontractor personnel on all construction issues (permitting processes, work progress, Quality, Safety, scheduling, issuance of new work and invoicing).
  • Ensure that completed projects are ready for testing i.e. Preliminary Acceptance Tests (PATs).
  • Interfaced with Lucent Quality Department/permitting agencies/subcontractors/independent testing labs (compaction and asphalt testing) to assure the quality of the work.
  • The improved results of this Quality Program facilitated timely issuance of construction permits that supported a schedule of 20-30 simultaneous Access projects.
  • Report construction progress monthly to Saudi Telecom (client).
  • Develop training programs for multi-cultural Lucent staff and subcontractor personnel on cable splicing, cable testing, splice closure preparation/integrity.
  • Review subcontractor claims for additional work (Change Orders) for entitlement and reasonability of pricing.
  • Directly supervised 20-30 multi-cultural Lucent personnel; indirectly supervised 1000-1500 multi-cultural subcontractor personnel.

Senior Project Engineer

Bechtel/Parsons Brinckerhoff
Boston, Massachusetts
01.1995 - 04.1997
  • Responsible for engineering, design and construction management activities necessary to implement the system design for the $50M C22A1 Contract - Central Artery/Ted Williams Tunnel Integrated Traffic Control System.
  • Responsible for construction inspection and testing activities for the traffic control systems in and around the Ted Williams Tunnel.
  • This included, but was not limited to the following duties: Installation/testing of the Integrated Traffic Control System computers, Installation/testing of the Fiber Optic (SONET) Backbone equipment and cables, Installation/testing of the Variable Message Signs (VMS), Installation/testing of the Portable Variable Message Signs (PVMS), Installation/testing of the Variable Speed Limit Signs (VSLS), Installation/testing of Closed Circuit cameras and monitors (CCTV), Installation/testing of Gas Concentration monitors in the Tunnel, Installation/testing of electromagnetic traffic loops in the Tunnel, Installation/testing of Over-height Vehicle Detectors (OVHDs) on the approaches to the Tunnel, Installation/testing of sign supports and fixed signage on tunnel approaches, Installation/testing of radio systems in Tunnel (and approaches) such as Boston Fire Dept., Boston Police, Tunnel Maintenance, etc., Installation/testing of Fire Monitoring systems in the Operations Control Center (OCC) and tunnel Ventilation buildings, Installation/testing of Security Monitoring Systems in the Operations Control Center (OCC) and tunnel Ventilation buildings.
  • Interfaced with Bechtel and Parsons Brinckerhoff design groups on all aspects of the project.
  • Directly supervised 5-6 B/PB staff; indirectly supervised 100-300 subcontractor/craft personnel.

Project Manager

Bechtel Corporation
Raleigh, North Carolina
09.1991 - 01.1995
  • Provided program management services to AT&T Wireless for the implementation of GSM technology on 136 cellular sites in the Raleigh/Durham area.
  • Work activities ranged from site audits through Turnover packages.
  • Teamed with Bechtel counterpart in Charlotte, NC to implement GSM technology across entire state of North Carolina.
  • Constructed and coordinated the network implementation and drive testing activities with Ericsson, the carrier-selected OEM equipment supplier for AT&T Wireless in this market.

Assistant Resident Engineer

Bechtel/Parsons Brinckerhoff
Charleston, West Virginia
02.1991 - 01.1995
  • Responsible for engineering, design and construction management activities necessary to implement the system design for the $40M C8 Contract - Memorial Tunnel Fire Ventilation Test Program.
  • These activities included construction and testing activities for the instrumentation and Process Control Systems required to measure and record real-time test data inside the Memorial Tunnel during full scale fire testing.

Education

Project Management -

Bechtel

Project Management - Project Baseline/Change Control

Bechtel

Electrical Engineering - undefined

American River Comm. College

Project Management - undefined

American Management Assoc.

Computer operation/repair - undefined

ModComp Computer School

Instrumentation apprenticeship - undefined

Eastman Kodak

General education credits - undefined

No. Virginia Comm. College

Electronics and computer systems - undefined

Poseidon Missile “C” School

Electronics courses - undefined

MK88 Fire Control “A” School

College Prep courses - (3 yrs. Electronics courses)

Marysville High School

Skills

  • Project Bidding and estimating
  • Project Planning/Execution Plans
  • Project Scheduling/Resource loading and leveling (Primavera)
  • Risk Assessment and Management
  • P&L Responsibility
  • Prime Contract Administration
  • Subcontract Administration
  • Partnering
  • Claims/Dispute Resolution
  • Windows 365
  • Windows 2000
  • Windows XP
  • Windows NT
  • Windows Vista
  • Windows 7
  • Windows 10
  • Windows 11
  • Microsoft Office Suite - Professional
  • Scheduling Software (Primavera, Microsoft Project)
  • AutoCad
  • VersaCad
  • Visio
  • Adobe
  • Power Point
  • Ericsson GSM
  • UMTS
  • LTE
  • AWS
  • WCS Equipment
  • Alcatel-Lucent UMTS
  • Nokia GSM
  • Lucent GSM
  • Lucent 5ESS Switch
  • Instrumentation design
  • Specification
  • Selection
  • Purchase
  • Digital Loop Systems (HART, Foundation Field Bus)
  • Digital Control Systems (various)
  • PLC-based Triple Redundant Emergency Shutdown systems (ESDs), such as Triconnex

Additional Information

U.S. Citizen, 2013-05-22, Vietnam-era veteran, U.S. Navy (Honorable), 120,000+ USD/Year, Manager (Supervisor of Staff), More than 20 years, Immediately, Authorized to work for any employer, Will require sponsorship (visa)

Languages

Arabic

Key Word List

  • Sr. Program Manager
  • Sr. Project Manager
  • Sr. Construction Manager
  • Contract Management
  • Claim Management
  • Dispute Resolution
  • Partnering
  • Labor Relations
  • Design Build
  • New Construction
  • Ground up
  • Commercial
  • Municipal
  • Industrial
  • Healthcare
  • Medical
  • K-12
  • Procurement
  • Material Control
  • Job Site Supervision
  • Superintendent
  • Site
  • Sr. Project Engineer
  • Water
  • Waste Water
  • Lift Stations
  • Instrumentation
  • SCADA
  • DCS
  • Distributed Process Controls
  • Process controls
  • Food
  • Environmental Controls
  • Mechanical
  • Electrical
  • Power
  • Electrical installation
  • Liquid Processing
  • Refinery controls
  • Oil & Gas
  • Nuclear instrumentation
  • Site Acquisition
  • Phase I
  • Phase II
  • NEPA
  • SHPO
  • RF
  • Due Diligence
  • Permits
  • Permitting
  • Construction
  • Fiber Optic
  • Outside Plant
  • Towers
  • Cell Towers
  • NOC
  • DC Power
  • Site Handler
  • NORAD
  • Siterra
  • CCN
  • FileNet
  • CASPR
  • GSM
  • UMTS
  • AWS
  • PCS LTE
  • LTE 1C
  • LTE 2C
  • LTE 3C
  • LTE WCS
  • G095
  • Small Cells
  • HUB
  • Lit fiber
  • Dark fiber
  • DISH

Personal Information

  • Title: Sr. Program Manager/Construction Manager
  • Availability: Immediately, U.S. – Authorized to work for any employer; Abroad – will require sponsorship (visa)

Timeline

Construction Manager

Endeavor Wireless
01.2023 - 01.2026

Construction Manager

AT&T
11.2021 - 01.2023

Construction Manager

Betacom
02.2021 - 11.2021

Construction Manager II

Vinculums LLC (now QualTek Wireless)
03.2018 - 07.2020

Construction Manager

SAC Wireless
04.2017 - 03.2018

Construction Manager II

Ridge Communications
02.2016 - 11.2016

Construction Manager II

Ericsson
11.2012 - 02.2016

Program Manager 1C LTE/NSB

General Dynamics
02.2012 - 11.2012

Construction Manager II

Ericsson
02.2010 - 01.2012

Sr. Program Manager

TPS Inc. - Northeast Region
10.2008 - 02.2010

Construction Manager

General Dynamics
08.2008 - 10.2008

Program Manager

Parsons
01.2008 - 08.2008

Program Manager

Aramco Oil Co.
08.2006 - 12.2007

Project Manager

Citigroup
10.2005 - 08.2006

Project Manager

Citigroup
02.2005 - 10.2005

Project Manager

Bechtel Corporation
04.2004 - 01.2005

Market Manager

Bechtel Corporation
07.2002 - 04.2004

Prime Contract Administrator

Lucent Technologies
04.1998 - 04.2000

Program/Construction Manager

Lucent Technologies
04.1997 - 04.1998

Senior Project Engineer

Bechtel/Parsons Brinckerhoff
01.1995 - 04.1997

Project Manager

Bechtel Corporation
09.1991 - 01.1995

Assistant Resident Engineer

Bechtel/Parsons Brinckerhoff
02.1991 - 01.1995

Project Management - Project Baseline/Change Control

Bechtel

Electrical Engineering - undefined

American River Comm. College

Project Management - undefined

American Management Assoc.

Computer operation/repair - undefined

ModComp Computer School

Instrumentation apprenticeship - undefined

Eastman Kodak

General education credits - undefined

No. Virginia Comm. College

Electronics and computer systems - undefined

Poseidon Missile “C” School

Electronics courses - undefined

MK88 Fire Control “A” School

College Prep courses - (3 yrs. Electronics courses)

Marysville High School

Project Management -

Bechtel
Floyd GreenConstruction Manager