Summary
Overview
Work History
Education
Skills
Timeline
Generic

Francisco Briones

Edinburg,TX

Summary

Dynamic Mechanical Foreman with extensive experience at Universal Plan Services, excelling in team collaboration and mechanical troubleshooting. Proven track record in leading projects that enhance safety and efficiency, while mentoring junior staff. Skilled in piping systems and effective communication, ensuring compliance with industry standards and delivering high-quality results.

Overview

19
19
years of professional experience

Work History

Mechanical Foreman

Universal Plan Services
Toledo, OH
01.2023 - 06.2025

I lead a crew in constructing, installing, and repairing boilers, tanks, and pressure vessels, focusing on safety, quality, and efficiency by interpreting blueprints, assigning tasks, coordinating with other trades, conducting toolbox talks, and ensuring work meets codes, all while managing resources and providing on-the-job training

Boilermaker Mechanic

Universal Plan Services
Deerpark, TX
04.2015 - 05.2022
  • Assembled and installed boiler components according to industry standards.
  • A boilermaker fabricates, installs, maintains, and repairs large vessels, boilers, tanks, and vats that hold liquids or gases, often under extreme pressure and heat, using welding, rigging, and metalworking skills in industries like energy, manufacturing, and transportation.
  • They read blueprints, cut and shape metal, assemble components.
  • Perform rigorous inspections, often working in challenging environments like heights or confined spaces, requiring significant physical strength and precision.

Scaffold Builder

Universal Plan Service
La Porte, TX
01.2006 - 02.2015
  • Assembled and dismantled scaffolding structures according to safety standards and project specifications.
  • Collaborated with team members to ensure efficient workflow and timely project completion.
  • Operated power tools and equipment for scaffold construction, ensuring proper maintenance and safety protocols.
  • Inspected scaffolding for structural integrity, reporting issues for immediate resolution to maintain safety compliance.
  • Developed strategies to improve scaffold setup efficiency, reducing downtime during projects.
  • Mentored junior builders in advanced techniques and best practices for scaffold installation and safety measures.
  • Led crew in large-scale projects, coordinating efforts to meet deadlines while adhering to regulatory requirements.
  • Displayed strong physical stamina, consistently fulfilling demanding labor requirements throughout long workdays onsite.
  • Demonstrated versatility in scaffold construction by adapting to various architectural designs and requirements.

Education

Engineering

South Texas College
McAllen, TX

High School Diploma -

East Bladen High School
Elizabethtown, NC
05.2001

Skills

  • Mechanical troubleshooting
  • Piping systems
  • Work order processing
  • Teamwork and collaboration
  • Problem-solving
  • Skilled maintenance and repair
  • Time management
  • Problem-solving abilities
  • Tools and equipment maintenance
  • Excellent communication

Timeline

Mechanical Foreman

Universal Plan Services
01.2023 - 06.2025

Boilermaker Mechanic

Universal Plan Services
04.2015 - 05.2022

Scaffold Builder

Universal Plan Service
01.2006 - 02.2015

Engineering

South Texas College

High School Diploma -

East Bladen High School
Francisco Briones