Proven leader in engineering and design with a track record of scaling Stantec's US West Power team from a single contributor to over 100. Excelled in securing Master Service Agreements and optimizing design workflows, demonstrating exceptional project management and technical expertise. Achieved significant productivity improvements, underscoring a commitment to excellence and strategic growth.
PROJECT EXPERIENCE
DETAIL ENGINEERING/DESIGN (POWER)
Lead the design efforts for SDGE Strategic Undergrounding program for Stantec. Coordinated with several internal teams as well as subconsultantsto engineer and design large segments of overhead to underground conversions in San Diego. Lead training and managed teams to produce electrical and civil designs for trench, cable, conduit, and equipment including all calculations required for cable pulling using polywater pulling calculator, voltage drop and flicker calculations, transformer sizing, and provided quality control for engineering, design, and drafting for all sections assigned to Stantec.
Provide support and design for electrical distribution systems in SDGE Corrective Maintenance Program. QAQC and Design of deteriorated structures for both the transmission system and under-built distribution system. Completed design deliverables and QAQC for all design documents such as Bolt Length Calculations, Stock Quantity Summary, Material Order Requests, Etc. Worked closely with Burns and McDonnell review team and project management to complete various projects for SDGE.
Provided detailed underground designs for Apollo program quick win underground extension and re-work for C175. Completed design and QAQC of all design deliverables such as cable pulling calculations, iCue material, fusing requests, and all of the documentation required for new install of various switchgear throughout the project. Coordinated with underground survey team to produce high quality survey grade basemaps for use by the Land and Environmental review groups as well as coordination with the SDGE Engineer to come up with creative solutions to the unique problems encountered on the project.
QAQC and Design of construction plans for SDGE Drone Inspection and Rehabilitation Program. Worked closely with Burns and McDonnell to provide several quick turnaround projects for the program through IFC. Worked on both Design Only and Engineering/Design Packages for the program replacing deteriorated structures as well as providing solutions to problems encountered in the field by the DIAR program. Provided Design and QAQC of all design deliverables for the program reviewing all documents such as, Drawing Sets, various circuit mapping, iCue material upload, L1 Shots commented for environmental/land review, and solutions tables.
Provide electrical designs and QAQC for several high fire risk mitigation project in the SDGE FiRM program for both underground and overhead electrical distribution systems. Worked closely with customer to deliver high quality designs and quick delivery to address high risk fire threats in SDGE Distribution Systems. Used latest design guidelines to complete and QC work designed to the latest standards. Completed design and QAQC for all relevant design deliverables such as Voltage Drop and Flicker Calculations, iCue material ordering, basemapping, and drafting.
Trained and acted as lead planner and QC for the Bootlegger 12KV HFA OCP. Managed a team of over 30 staff members to quickly and efficiently complete the work order to the standards outlined by SCE. Reconductoring several miles the 12kv distribution circuit to meet new High Fire Standards.
Planned sections of the 405 FWY Expansion working in conjunction with the OCTA and SCE Transmission for both underground structures and overhead transmission structures with distribution underbuilds.
Completed designs for underground cable replacements for at risk and failing cable in trenches, CIC, or direct buried cable. Also completed several designs of overhead deteriorated pole replacements for NV Energy. All NV Energy designs were done in AUD and material ordered through the MAXIMO online system.
Led team to provide emergency restoration plans to restore customer owned distribution circuits and equipment after Bobcat Wildfire in state of California damaged several assets at Cogswell Dam. Efforts included structural analysis in PLS-CADD and coordination with subcontractor to aquire LiDAR data and generate work order maps and bill of materials under severe time constraints to meet client needs for power restoration to critical locations on site.
Led in the design and engineering of a new streetlighting system for this street widening improvement project in the City of Moorpark. The project involved widening the street to add new vehicle and bicycle lanes as well as pedestrian walkways. The street lighting electrical system was designed as an underground system feeding several new concrete luminaires along both sides of the street along with meter cabinets for the city to SCE interconnect and photocell equipment for the operation of the system.
Advised and aided in the development of a feasibility study and technical memorandum identifying the power requirements and infrastructure that would be required for the High Desert Water Bank (HDWB) project. The study identified several methods that could be implemented to address the requirements for the new proposed facility. The new facility would require several improvements to the existing infrastructure to operate up to 28 individual (500 HP) recovery wells, a 100 CFS pumping plant, turnout gates and other minor ancillary equipment to support overall operations. The study included a cost estimate for each of the feasible options and a review of impacts to the existing overhead electrical distribution circuits within the project site.
Worked alongside other engineering disciplines to design the underground power distribution system on site for a large logistics company. Lead a team of designers and engineers to complete several miles of cable and conduit sizing calculations, voltage drop and flicker calculations, transformer sizing and configurations and civil design for trench and conduit configuration and coordinating with other stake holders for to design and new utility corridors on site.