Summary
Overview
Work History
Education
Skills
Timeline
Generic

Frank Clay

L'Anse

Summary

Accomplished Journeyman Carpenter at Carpenters Local 413, skilled in blueprint interpretation and project management. Enhanced client satisfaction through high-quality craftsmanship and meticulous attention to detail. Proven ability to mentor apprentices and improve safety protocols, significantly reducing workplace accidents while ensuring timely project completion.

Overview

34
34
years of professional experience

Work History

Journeyman Carpenter

Carpenters Local 413
05.2001 - Current
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Demonstrated versatility as a journeyman carpenter with experience in both rough framing and finish work across diverse construction environments.
  • Installed and repaired woodwork, millwork and cabinetry.
  • Improved project efficiency by effectively managing carpentry tasks and maintaining a well-organized worksite.
  • Mentored apprentice carpenters, providing guidance on best practices for improved skill development and work efficiency.
  • Enhanced safety measures by consistently adhering to industry guidelines, reducing workplace accidents significantly.
  • Read and interpreted blueprints, sketches and specifications to understand job.
  • Increased structural integrity of buildings through expert framing techniques, ensuring long-lasting durability.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Coordinated movement of materials and equipment to job sites.
  • Skilled in reading blueprints, schematics, and specifications to ensure accurate construction according to design plans.
  • Conducted detailed measurements and calculations for accurate material estimation, minimizing waste during construction.
  • Increased client satisfaction with high-quality craftsmanship in residential and commercial construction projects.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Collaborated with architects, engineers, and other team members for seamless project completion.
  • Utilized advanced woodworking techniques to produce intricate designs that met or exceeded client expectations.
  • Efficiently managed multiple projects simultaneously while ensuring timely completion of each assignment within deadlines set forth by clients or supervisors.
  • Interacted closely with customers to better understand project scope.
  • Completed projects on time and within budget through meticulous planning and efficient task execution.
  • Discarded debris and disposed waste to maintain cleanliness and quality standards.
  • Planned projects by identifying necessary equipment, tools, and required assistance.

Journey Millwright

Millwrights Local 1102
05.1991 - 05.2001
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Enhanced equipment reliability by performing regular maintenance and repairs on industrial machinery.
  • Improved workplace safety with diligent adherence to protocols, lockout/tagout procedures, and hazard identification.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Conducted comprehensive inspections of machinery to identify potential problems and ensure optimal performance.
  • Adhered to all workplace safety policies, regulations and compliances.
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Disassembled machinery parts and categorized properly before moving to storage.
  • Ensured proper lubrication of moving components by adhering to a strict preventive maintenance schedule based on manufacturer recommendations.
  • Mentored junior millwrights as they acquired new skills and gained familiarity with complex industrial machinery operations.
  • Enhanced equipment reliability by performing regular preventative maintenance and inspections.

Education

GED -

Benton Harbor
Benton Harbor, MI
1991

Skills

  • Window and door installation
  • Power tool operation
  • Special projects
  • Carpentry
  • Blueprints and specifications
  • Materials ordering
  • Commercial projects
  • Time management expertise
  • Repair work
  • Residential projects
  • Building code regulations
  • Hand and power tools
  • Skilled in layout work
  • Project management
  • Quality control focus
  • Hand tool proficiency
  • Basic electrical
  • Material prepping
  • Construction site organization
  • Safety protocol adherence
  • Safety guidelines adherence
  • Attention to detail
  • Fabrication
  • Equipment installation
  • Safety compliance
  • Preventive Maintenance
  • Mechanical troubleshooting
  • Parts installation
  • Bearing installation
  • Machinery maintenance
  • Troubleshooting
  • Machinery installation
  • Conveyor systems

Timeline

Journeyman Carpenter

Carpenters Local 413
05.2001 - Current

Journey Millwright

Millwrights Local 1102
05.1991 - 05.2001

GED -

Benton Harbor