Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

FRANK HYSQUIERDO

Summary

Hardworking Roofing Laborer with safety-driven and team-oriented mindset. Always willing to go above and beyond to complete jobs to customer satisfaction. Skillful in reading drawings and following orders with accuracy and efficiency. Experienced Roofing Laborer with [Number]+ years working in team-based construction positions. Excellent communicator with superior work ethic and dedication to team success.

Overview

41
41
years of professional experience
1
1
Certification

Work History

Maintenance Supervisor

Gladiator Construction
02.2017 - 12.2023

Maintenance Tech-HVAC licensed thru State of Texas

Repaired and update with replacement on all AC, Heating applicances

Continuing in General Maintenance as per job requirement on all locations

Also managed workers for assistance in job calls

Managed in instructing work skills for completing job work areas

Welder

Caterpillar
03.2015 - 12.2020

Fabrication Welder

Forklift materials on site

  • Maintained clean working environment by consistently organizing tools and equipment, promoting workplace safety.
  • Participated in continuous professional development training sessions to stay current on industry trends and best practices in the field of welding.

Lead Maintenance Technician

COLONY APARTMENTS
02.2009 - 04.2015

Maintenance Tech-usage of HVAC experience in cooling and heating

All repairs in Apartment -structual and plumbing

paint readys

On call duties as required on for locations needs

  • Improved machinery uptime by implementing preventative maintenance procedures and conducting regular inspections.
  • Enhanced equipment reliability through thorough troubleshooting and timely repairs of malfunctioning systems.
  • Reduced downtime by coordinating with production teams to schedule maintenance tasks during non-peak hours.
  • Collaborated with other technicians on complex repairs, resulting in expedited resolution of equipment issues.
  • Completed projects on time by effectively managing resources, scheduling labor, and procuring necessary materials in advance.
  • Served as primary point-of-contact between maintenance department and vendors, ensuring clear communication regarding parts delivery timelines and specifications.
  • Managed spare parts inventory, maintaining appropriate levels to minimize downtime and ensuring cost-effective reordering.
  • Generated and completed work orders for repairs, maintenance and component replacement.
  • Conducted mechanical and electrical maintenance of factory equipment.
  • Troubleshot and repaired conveyors, pneumatic systems and steam boilers.
  • Maintained air conditioning systems by repairing malfunctioning systems and changing air intake filters.
  • Kept grounds clean and maintained landscaping by removing debris, watering and mowing.

Lead Maintenance Technician

Autumn Park Apts
04.2005 - 03.2009
  • Improved machinery uptime by implementing preventative maintenance procedures and conducting regular inspections.
  • Enhanced equipment reliability through thorough troubleshooting and timely repairs of malfunctioning systems.
  • Maintained a safe working environment by enforcing safety regulations and ensuring proper use of protective equipment.
  • Collaborated with other technicians on complex repairs, resulting in expedited resolution of equipment issues.
  • Completed projects on time by effectively managing resources, scheduling labor, and procuring necessary materials in advance.
  • Conducted root cause analysis investigations after major breakdowns or incidents to prevent future occurrences.
  • Conducted mechanical and electrical maintenance of factory equipment.
  • Troubleshot and repaired conveyors, pneumatic systems and steam boilers.
  • Provided functional plumbing by repairing leaks, removing drain clogs and lubricating parts.
  • Performed carpentry work by constructing and repairing walls, doors, windows and [Item].
  • Laid and repaired tile, carpet and [Type] flooring.
  • Operated varied hand and power tools to complete repairs.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.

Lead Maintenance Technician

Stratford Apartments
01.2000 - 02.2005

Lead Maintenance Tech

Worked on Makeready on apt rooms

replace and repair as needed

  • Improved equipment functionality by conducting regular maintenance checks and repairs.
  • Trained new employees on proper use and care of tools, machinery, and safety protocols.
  • Contributed to a safer work environment, promptly addressing any identified hazards or concerns.
  • Supported inventory management efforts, tracking spare parts usage and reordering as necessary.
  • Successfully completed complex repair tasks within tight deadlines, minimizing disruptions to daily operations.
  • Operated varied hand and power tools to complete repairs.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Maintained restroom functionality by repairing leaking faucets, clogged toilets, and other equipment.
  • Performed electrical and mechanical repairs of production equipment to minimize downtime.
  • Worked with building managers to assess ongoing needs and plan preventive maintenance and cleaning schedules.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Improved machinery uptime by implementing preventative maintenance procedures and conducting regular inspections.
  • Enhanced equipment reliability through thorough troubleshooting and timely repairs of malfunctioning systems.
  • Increased overall equipment efficiency by optimizing maintenance processes, including prioritization of work orders and inventory management.
  • Developed standardized operating procedures for routine maintenance tasks, promoting consistency across all team members and reducing errors.
  • Completed preventive maintenance to maintain production and equipment in accordance with safety protocols and company policy.
  • Generated and completed work orders for repairs, maintenance and component replacement.
  • Conducted mechanical and electrical maintenance of factory equipment.
  • Repaired and installed electrical wiring for light fixtures, power outlets and [Type] system.
  • Maintained air conditioning systems by repairing malfunctioning systems and changing air intake filters.
  • Collaborated with painters to initiate quality assurance projects.
  • Laid and repaired tile, carpet and [Type] flooring.

Roofing Laborer

Easley
01.1983 - 01.2000
  • Improved roof installation quality by consistently adhering to safety protocols and proper techniques.
  • Contributed to timely project completion by efficiently loading, unloading, and organizing materials.
  • Ensured customer satisfaction by maintaining a clean work area and promptly addressing concerns.
  • Expedited task completion through proficient use of hand tools, power tools, and other specialized equipment.
  • Assisted in damage assessment after severe weather events, providing accurate estimates for necessary repairs or replacements.
  • Removed old roofing material and properly disposed of all debris to maintain clean, organized work sites.
  • Repaired and maintained roofing systems by replacing roofing tiles and refastening seams.
  • Maintained good physical fitness in order to maintain proper balance on inclined surfaces and at high levels off ground.
  • Installed asphalt shingles, tile and metal roofing systems to manage exterior construction projects of residential, commercial and industrial buildings.
  • Installed, repaired, and replaced single-ply roofing systems.
  • Inspected buildings to inspect for water damage, worn out flashing and other signs of roof damage.
  • Inspected roofs and identified deficiencies for repair cost estimation.

Education

GED -

Victoria College
Victoria, TX
06.1987

Skills

  • Commercial Repairs
  • Roof Repair
  • Roof Installation
  • Shingle Installation
  • Carpentry
  • Roof Installations
  • Equipment Operation
  • Power Tool Operation
  • Tiling
  • Customer Communications
  • Safety Protocols
  • Forklift Operation
  • Roofing
  • Forklift Operations
  • HVAC Systems
  • Structural Repair
  • Tile Installation
  • Inspection
  • Team Player
  • Fluent in spanish
  • Installation
  • Power Tools Operation

Certification

HVAC

Languages

Spanish

Timeline

Maintenance Supervisor

Gladiator Construction
02.2017 - 12.2023

Welder

Caterpillar
03.2015 - 12.2020

Lead Maintenance Technician

COLONY APARTMENTS
02.2009 - 04.2015

Lead Maintenance Technician

Autumn Park Apts
04.2005 - 03.2009

Lead Maintenance Technician

Stratford Apartments
01.2000 - 02.2005

Roofing Laborer

Easley
01.1983 - 01.2000

GED -

Victoria College
FRANK HYSQUIERDO