Summary
Overview
Work History
Education
Skills
Timeline
Generic

frank vargas

Grover,WY

Summary

Dynamic Job Site Supervisor at Ponderosa 1 LLC, recognized for enhancing project efficiency through strategic resource allocation and fostering strong client relationships. Proven leadership in team supervision and safety compliance, coupled with a commitment to quality assurance, resulted in timely project completions and increased client satisfaction.

Overview

8
8
years of professional experience

Work History

Job Site Supervisor

Ponderosa 1 LLC
03.2024 - Current
  • Fostered strong relationships with clients by maintaining open lines of communication throughout the duration of each project.
  • Improved construction project efficiency by implementing effective scheduling and resource allocation strategies.
  • Maintained safe working environments through regular inspections and adherence to safety regulations and guidelines.
  • Ensured timely completion of projects by closely monitoring progress and addressing potential delays proactively.
  • Implemented industry best practices leading to improved construction methods that saved time without sacrificing quality standards.
  • Conducted thorough post-project evaluations identifying lessons learned to incorporate into future projects for continuous improvement.
  • Identified areas of improvement in existing processes resulting in increased overall work efficiency on job sites.
  • Demonstrated strong leadership qualities, resulting in high levels of motivation and commitment from the team members throughout each project.
  • Supervised material usage and contractor man-hours to keep projects in line with budgetary restrictions.
  • Implemented best practices and safe operating procedures.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Directed projects according to schedule and quality demands.
  • Sourced suppliers and purchased necessary materials for work.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.

Manager/ Installer

AV Fanatics
05.2023 - 03.2024
  • Collaborated with sales and design teams to ensure seamless project execution from start to finish.
  • Participated actively in recruiting and interviewing processes, helping to build a highly skilled and reliable installation team.
  • Developed strong relationships with suppliers, securing better pricing and improving overall project profitability.
  • Reduced errors in installations by implementing strict quality control measures and conducting thorough inspections.
  • Increased client retention rates by consistently delivering exceptional workmanship and addressing any concerns promptly.
  • Streamlined inventory management, reducing waste and ensuring adequate supplies for each project.
  • Mentored junior installers, fostering professional development through hands-on training and guidance.
  • Implemented best practices for efficient installations, resulting in higher customer satisfaction ratings.
  • Resolved complex installation challenges with innovative solutions that minimized disruptions to clients'' operations while maintaining quality standards.
  • Reviewed blueprints and specifications prior to installations, identifying potential issues or discrepancies early on in the process.
  • Updated knowledge continuously about latest industry trends, products, methods which enabled the ability to recommend optimal solutions for clients'' needs.
  • Coordinated scheduling for multiple projects simultaneously, maximizing efficiency and minimizing downtime between jobs.
  • Utilized industry-specific tools and equipment proficiently to complete installation tasks in accordance with established guidelines effectively.
  • Laid out materials and system components to prepare for installation.
  • Operated tools, equipment, and machinery according to safety standards.
  • Calculated materials and time needed for each job.
  • Communicated quickly and accurately with supervisors about problematic sites, missed installations or other issues.
  • Completed troubleshooting of malfunctions and diagnosed issues.
  • Diagnosed and repaired problems with electrical and mechanical systems.
  • Tested systems, noting issues and completing preventive maintenance.
  • Maintained strong focus on safety and efficiency to provide comprehensive support to personnel performing skilled repairs.
  • Demonstrated to customers proper methods for operating equipment after it had been installed.
  • Researched and implemented new technologies and equipment.

Carpenter Foreman

Star Valley Construction
08.2017 - 05.2023
  • Mentored junior carpenters to develop their skills, ensuring a well-trained workforce for future projects.
  • Increased project efficiency by delegating tasks and supervising a team of carpenters.
  • Ensured compliance with building codes by thoroughly reviewing design plans before commencing construction tasks.
  • Reduced material waste by implementing accurate measurements, cutting techniques, and proper storage practices.
  • Established a positive working environment fostering teamwork and open communication among crew members.
  • Enhanced client satisfaction with high-quality craftsmanship in custom carpentry work.
  • Maintained organized records of blueprints, plans, and specifications for easy access during the construction process.
  • Contributed to the company''s reputation for excellence through consistent high-quality workmanship on all assigned projects.
  • Completed projects on-time and within budget through effective resource allocation and scheduling.
  • Coordinated movement of materials and equipment to job sites, verifying supply readiness prior to project start.
  • Inspected work performed by carpentry crews to check completion of job specifications.
  • Improved worksite safety by enforcing strict adherence to safety protocols and conducting regular inspections.
  • Assessed project size to prepare work orders and determine resources needed to complete jobs.
  • Resolved issues promptly during the construction process, preventing delays in project completion.
  • Observed all OSHA and corporate safety regulations and procedures to prevent mishaps and injuries on job sites.
  • Supervised teams of up to Number employees, answering questions, and providing feedback on work progress.
  • Continuously updated knowledge of industry trends, tools, technologies, and best practices ensuring maintained competitive edge in the market.
  • Instituted preventative maintenance programs for tools and equipment, reducing downtime due to repairs or replacements.
  • Conducted post-project evaluations identifying areas for improvement in future projects.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Provided feedback to workers on job performance and safety procedures.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.

Education

High School Diploma - N/A

Duncan U Fletcher Senior Highschool
Jacksonville, FL
05.1997

Skills

  • Site inspection
  • Task delegation
  • Material procurement
  • Environmental awareness
  • Construction supervision
  • Construction safety
  • Site coordination
  • Safety awareness
  • Safety assessment
  • Site safety
  • Operations management
  • Staff management
  • Team supervision
  • Strategic planning
  • Quality assurance
  • Personnel oversight
  • Inventory procurement
  • Willingness to learn
  • Teamwork
  • Teamwork and collaboration
  • Dependable and hardworking
  • Problem-solving
  • Time management
  • Attention to detail
  • Job site cleanup
  • Problem-solving abilities
  • Following instructions
  • Multitasking
  • Multitasking Abilities
  • Reliability
  • Worker supervision
  • Excellent communication
  • Organizational skills
  • Team collaboration
  • Team leadership
  • Active listening
  • Effective communication
  • Hand and power tool operation
  • Verbal and written communication
  • Adaptability and flexibility
  • Physical strength and stamina
  • Decision-making
  • Heavy lifting
  • Self control and integrity
  • Safe operating procedures
  • Relationship building
  • Heavy equipment operations
  • Tool operation
  • Safety protocols
  • Professionalism
  • Risk assessment
  • Conflict resolution
  • Equipment operation

Timeline

Job Site Supervisor

Ponderosa 1 LLC
03.2024 - Current

Manager/ Installer

AV Fanatics
05.2023 - 03.2024

Carpenter Foreman

Star Valley Construction
08.2017 - 05.2023

High School Diploma - N/A

Duncan U Fletcher Senior Highschool