Summary
Overview
Work History
Education
Skills
Timeline
Generic

Frankie Fresquez

Denver,CO

Summary

Dynamic Demolition Specialist with proven expertise at Superior Demolition Inc, excelling in controlled demolitions and crew leadership. Enhanced efficiency through strategic planning and effective communication, consistently exceeding client expectations. Skilled in heavy equipment operation and committed to maintaining a safe work environment while driving team performance and project success.

Overview

2
2
years of professional experience

Work History

Demolition Specialist

M. P Contracting
Denver, CO
01.2025 - 04.2025

Read and understand floor plans , Run crew up to 10 individuals, Interior/Exterior commercial demolition. Maintain clean safe work environment, clean up and trash out all existing trash and debris, cut remove and dispose concrete, cut break demo drywall, ceilings, class, flooring tear out , grind scrape, . Can utilize all hand and power tools, like demo saw, saw saws, while keeping a safe tidy work place .

Demolition Laborforman

Superior Demolition Inc
03.2023 - 01.2025

  • Supervised daily operations, ensuring compliance with safety regulations and project specifications.
  • Trained and mentored junior crew members on equipment handling and safety protocols, enhancing team performance.
  • Implemented process improvements that reduced waste and increased efficiency during demolition projects.
  • Coordinated labor schedules to optimize workflow and resource allocation across multiple demolition sites.
  • Developed and maintained positive relationships with clients and other stakeholders.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Inspected equipment and tools used for safe operation.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Created and implemented plans to maximize efficiency of workers.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Increased crew efficiency by implementing streamlined work processes and optimizing task delegation.
  • Demonstrated adaptability by effectively managing changes in project scope or unexpected obstacles encountered during construction phases.
  • Tracked crew time, attendance and performance.
  • Collaborated with project managers to develop detailed work plans that aligned with overall project goals.
  • Exceeded client satisfaction levels by consistently delivering high-quality workmanship while adhering to budgetary constraints and project timelines.
  • Managed inventory of tools and materials, ensuring availability for project timelines while minimizing costs.
  • Analyzed project requirements to develop effective demolition strategies tailored to specific site conditions.

Education

High School Diploma - N/A

Aberham Lincoln Highschool
Denver, CO
05-2000

Skills

  • Demolition planning
  • Heavy equipment operation
  • Debris removal
  • Site preparation
  • Fire prevention
  • Hazardous materials handling
  • Noise control
  • Traffic control
  • Controlled demolitions
  • Dust suppression
  • Crew leadership
  • Waste disposal
  • OSHA regulations
  • Structural tear-down
  • Teamwork
  • Teamwork and collaboration
  • Team player
  • Problem-solving
  • Time management
  • Attention to detail
  • Multitasking
  • Problem-solving abilities
  • Punctuality
  • Power tools operation
  • Loading and unloading
  • Reliability
  • Excellent communication
  • Organizational skills
  • Active listening
  • Hand and power tool operation
  • Adaptability and flexibility
  • Physical strength and stamina
  • Punctual and dependable
  • Decision-making
  • Heavy lifting
  • Worksite safety and maintenance
  • Material loading and unloading
  • Forklift operation
  • Self motivation
  • Measurements and calculations
  • Interpersonal skills
  • Goal setting
  • Professionalism
  • Blueprint reading
  • Incident reporting
  • Physical agility and coordination
  • Skilled with ladders and scaffolds
  • Time management abilities
  • Continuous improvement
  • Physical stamina
  • Adaptability
  • Demolition and destruction
  • Heavy machinery operation
  • Equipment inspection

Timeline

Demolition Specialist

M. P Contracting
01.2025 - 04.2025

Demolition Laborforman

Superior Demolition Inc
03.2023 - 01.2025

High School Diploma - N/A

Aberham Lincoln Highschool