Professional Summary
Overview
Work History
Education
Skills
Timeline

Franklin Bullock III

Pleasants Construction
Falling Waters,WV
10
years of professional experience

Skilled Lead Pipe Layer with a strong background in sewer line and water main installation, trench shoring, and underground piping. Known for careful measurements, clean work habits, and consistent compliance with safety standards. Focused on delivering accurate, reliable utility work.

Work History

Lead Pipe Layer

7 Months
Pleasants Construction | 04.2026 - 11.2026
  • Laid water and sewer pipe according to grade, alignment, and trench specifications.
  • Assisted excavation crews with trench preparation, shoring, and safe pipe installation.
  • Inspected pipe joints for proper seal, alignment, and backfill readiness.
  • Operated hand tools and compactors to complete pipe bedding and restoration work.

Lead Pipe Layer

1 Year 7 Months
Kinsley Construction | 09.2024 - 04.2026
  • Installed and repaired wet and dry utility piping, sanitary and storm water sewer structures, and pipe systems.
  • Checked completed work regularly for quality control and compliance with industry standards and client expectations.
  • Assembled pipes to pass required pressure tests.
  • Assembled and installed underground pipe, fittings, and valves of various sizes.

Lead Pipe Layer

1 Year
C.A. Murren | 09.2023 - 09.2024
  • Supported foreman and crew with material handling and installation sequencing.
  • Kept work areas clean and pipe materials organized for smoother daily progress.
  • Checked completed work regularly for quality control and compliance with industry standards and client expectations.
  • Installed and repaired wet and dry utility pipe, sanitary and storm water sewer structures and pipe systems.

Lead Pipe Layer

2 Years 6 Months
Global Excavating and Equipment | 03.2021 - 09.2023
  • Communicated with foreman and crew to coordinate material handling and installation sequence.
  • Maintained clean work areas and organized pipe materials for efficient daily progress.
  • Moved pipe into trenches and layered pipe in trenches to help initial backfill.
  • Regularly inspected completed work for quality assurance purposes, ensuring compliance with industry standards and client expectations.

Lead Pipe Layer

4 Years 8 Months
Monarch Excavating | 03.2017 - 11.2021
  • Ensured accurate pipe measurements, leading to minimal waste and reduced material costs.
  • Utilized appropriate materials and tools to connect pipe pieces and seal joints.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
  • Graded or leveled trench bases using tamping machines or hand tools.

Education

High School Diploma

Martinsburg High School | Martinsburg

Skills

Sewer line & water main installation
Pipe joining
Concrete pipe installation
Drainage systems
Underground utilities
Trench shoring techniques
Confined space entry
Equipment and tools
Problem-solving
Quality assurance
Reliability

Timeline

Lead Pipe Layer

Pleasants Construction
04.2026 - 11.2026Read More

Lead Pipe Layer

Kinsley Construction
09.2024 - 04.2026Read More

Lead Pipe Layer

C.A. Murren
09.2023 - 09.2024Read More

Lead Pipe Layer

Global Excavating and Equipment
03.2021 - 09.2023Read More

Lead Pipe Layer

Monarch Excavating
03.2017 - 11.2021Read More

Martinsburg High School

High School Diploma
Read More
Franklin Bullock III