Summary
Overview
Work History
Education
Skills
Timeline
Generic

Frank Nicholas Rosas

Porter,Texas

Summary

Resourceful, dedicated, dependable, and ambitious with a positive attitude. Hard work and a fast learner to exceed all expectations in assigned tasks given. Goal oriented team player, working well with others by using good communication and people skills. Seeking more growth and challenges.

Overview

11
11
years of professional experience

Work History

Industrial Heavy Civil Surveyor Assistant

Performance Contractors
Deer Park, TX
05.2023 - Current
  • Measure distance between points using surveyor's chain.
  • Mark and set points with spikes, stakes and rods.
  • Maintain cleaned and repaired survey equipment and instruments.
  • Complete and comply with daily logs, JSA, work scope permits.
  • Collect data using manual and electronic survey instruments, such as 3D scanners and GPS devices such as total station etc.
  • Met with crew leaders to review and verify field notes.
  • Identify elevations by positioning levels or rods at specific points.
  • Use manual and robotic field surveying techniques to complete accurate work.
  • Analyze survey computations with applicable standards to determine adequacy of data.
  • Calculated latitudes, longitudes, angles and areas using survey field notes or reference tables.
  • Compiled engineering plan information to stake projects for construction.

Logical Foreman / Assistant Superintendent

Resia Shell Division / AHS Residential
Katy, TX
05.2022 - 05.2023
  • Managed all incoming building materials such as concrete forms steal beams, wire mesh, liners, tubes, jacks, pipes, a-frames, scaffolding, platforms, railings, rebars.
  • Supervised three yard sites, site and dirt prepped for storage space using bulldozer, skid steer.
  • Managed sites by focusing on safety, operations and productivity.
  • Communicated with employees to demonstrate high standards and mitigate issues.
  • Off loaded and loaded truck trailers using telehandler forklift daily, moved and separated material in lay-down yards and within building site.
  • Used daily system logs to document production information, discussing issues with management.
  • Calibrated machines to adhere to quality standards and maintain required productivity levels.
  • Worked with building site survey engineer to complete assessments, measuring boundaries and notable landmarks.
  • Verified accuracy of survey measurements and calculations conducted at survey sites. Assisted with layout, for concrete forms prior to pouring for vertical work.
  • Communicated with suppliers and coordinated delivery of supplies to job sites.

Maintenance Coil Tube Roller Mechanic

Tenaris Bay City
Bay City, TX
12.2021 - 05.2022
  • Operated hand and power tools to complete repairs, such as grinders to clear old debris to allow to rollers to function properly once again.
  • Installed new systems, replacement parts and components to maintain proper operation.
  • Inspected grounds and buildings to identify, minimize and correct hazardous property conditions or liability concerns.
  • Read and interpreted equipment and work orders to properly perform required maintenance services.
  • Performed lock out/ prior and after completion of work.

  • Diagnosed equipment malfunctions and performed repairs to restore equipment and maintain uptime.
  • Set up and tended equipment with machine operators to complete runs.
  • Examined final products for conformance with quality and design standards.
  • Scraped off excess spatter from welds using portable grinders and arc-cutting equipment.
  • Prepared broken parts for welding by properly grooving and scarfing surfaces.
  • Conducted x-ray, hydrostatic and tolerance tests on welded parts to verify weld quality and conformance to specification.

Industrial Paint Foreman

Schnurr Painting & Coating LLC | Tesla / Samsung
Austin, TX
02.2021 - 12.2021

Tesla Gigafactory / Samsung Semiconductor

  • Performed daily work scope / Job Safety Analysis prior to starting work each day for site compliances, given details of crews name/time/location entries and details of tasks that'll be ongoing. Obtained any permits needed such as hot work, confine space; etc.
  • Delivered work orders and clear instructions to painting team to prepare for each shift.
  • Reviewed painting projects to verify highest quality and adherence to organization's strict guidelines.
  • Cleaned and properly stored paint equipment and supplies at end of each workday.
  • Performed repairs to defects in walls by patching holes and scrapes prior at project start.
  • Primed, smoothed and cleaned trim, walls and ceilings to prepare for painting tasks.
  • Readied surfaces and surrounding areas for painting with sandpaper, tape and other materials.
  • Applied paints, sealers and solvents to plaster, sheetrock, concrete and wood.
  • Spread undercoats and finish materials using rollers and spray equipment.
  • Operated power sanding and edging equipment, buffers and vacuums and hand scraped according to job requirements.
  • Use of surface grinders prior to epoxy flooring applications.
  • Demonstrated basic carpentry skills and advanced knowledge of floor refinishing hand tools and power equipment maintenance.
  • Organized and prepared work trailer for upcoming sanding and finishing projects.
  • Removed trash, building debris and sanding dust from site upon project completion.
  • Demonstrated leadership by making improvements to work processes and helping to train others.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
  • Inspected or evaluated workplace environments, equipment or practices to verify compliance with safety standards and government regulations.
  • Collaborated with engineers or physicians to institute control or remedial measures for hazardous or potentially hazardous conditions or equipment.
  • Surveyed techniques used in transportation regarding use and storage of chemical agents and toxic materials.
  • Developed noise surveys, continuous atmosphere monitoring and ventilation surveys.
  • Managed sites by focusing on safety, operations and productivity.
  • Monitored training costs and prepared budget reports to justify expenditures.

Rigger

Consolidated Crane & Rigging
Houston, TX
11.2019 - 02.2021
  • Maintained open communication with crane and other equipment operators to smoothly transport loads.
  • Coordinated structural and heavy lifts weighing up to [Number] pounds with properly rigged equipment.
  • Planned and prepared rigging before performances and handled rigging changes during performances.
  • Conducted frequent safety evaluations on rigging equipment.
  • Signaled and verbally directed workers engaged in hoisting and moving loads to protect workers and materials.
  • Unloaded materials and arranged in specific locations.
  • Maintained cranes by inspecting for defects or wear, lubricated ropes and winches and replaced worn out cables.
  • Adhered to OSHA safety standards and precautions including weight capacity, tag lines and ground stability.
  • Directed work crews for correct placement of blocking and outrigging under cranes.
  • Verified daily schedules and instructions with project manager prior to beginning work on project.
  • Reviewed and interpreted load charts and calculated weight.
  • Inspected and maintained inventory of all slings, chains, ropes and shackles.
  • Built and assembled crawler cranes using mobile cranes.
  • Use of bull rigging equipment assembles to get large loads out buildings to pass them to tower cranes and/ or mobile cranes

Industrial Painter

LyondellBassell CVO & LHR, Brand
Pasadena, Texas
04.2019 - 11.2019
  • Preparation of metal surfaces for painting, painted components, equipment, interiors, and exteriors of vessels, using spray guns, brushes, and rollers
  • Set up building containment into scaffolds around areas of set work
  • Confined space work during sandblasting, and painting
  • Watch valves, vessels, and switches being aware while working on and around sensitive equipment
  • Use of scaffolds, ladders, and platforms to get to high locations wearing proper safety PPE at all times
  • Use of air hoses, for sandblasting always maintained proper safety checks and placements of equipment
  • Fill out documents of observations, safety procedures, JSAs, Permits, keeping notice of work duties, completion and materials needed before/after work start to finish.
  • Reviewed painting projects to verify highest quality and adherence to organization's strict guidelines.
  • Applied primer, paints, varnishes and lacquers to walls and surfaces.
  • Readied surfaces and surrounding areas for painting with sandpaper, tape and other materials.
  • Mixed paints and solutions and monitored consistencies.

Ironworker Top Helper

INEOS, Chocolate Bayou, Performance Contractors
Pasadena, Texas
05.2018 - 05.2019
  • Help assisted journeyman to any required tasks, climbing onto platforms, to get to beams with use of scaffolds, ladders, wearing safety harnesses and always wearing proper PPE
  • Use of hand tools, and power tools such as grinders to prepare beams for welders
  • Determined fittings and connections reading off blueprints and properly following any given instructions
  • Worked safely in tight areas around hazardous, and sensitive equipment such as gas and hot steam valves, pipes, and switches
  • Use of facemask to protect against chemicals releasing from hot metal work
  • Handled materials carefully dictating what knots to use to hoist up to location with using proper lifting techniques.

Leadman

Primoris Heavy Civil Construction / Flatiron
Humble, TX
04.2017 - 04.2018
  • Assigned to the Bush Intercontinental Airport in Houston, Texas for construction work duties
  • Conducted work site safety inspections prior to work, assigned work duties to construction workers
  • Provided workers with necessary construction tools PPE & equipment, for Foreman.
  • Used picks and shovels to dig, spread and level dirt and gravel.
  • Completed work documents and Job Safety Analysis reports
  • Assigned to conduct traffic control flagger duties to provide safe construction vehicular traffic flow within airport roads, runaways and/or taxiways
  • Conducted vehicle inspections on construction vehicles needing entry into airport properties, per City of Houston Airport Rules and Regulations: Security Inspections on Vehicles, using under car mirrors, obtaining driver identification and security access cards, completing security entry/exit logs
  • Prepared site areas for day's asphalt load.
  • Used range of hands tools, power tools and construction equipment to spread gravel and asphalt.
  • Operated mini excavator, skid steer to properly grade land, dig, use of jack attachments for concrete demolition. Operated broom truck on taxiways/runways throughout shifts to keep jobsites/ work areas clean, safe and maintained.
  • Inspected vehicles before and after every trip to assess performance and maintenance requirements.
  • Kept load counts on incoming and outgoing concrete/dirt trucks to turn into for material documentation.
  • Finished concrete surfaces by troweling, floating and brushing following project requirements and specifications. Applied caulking compounds by hand or caulking guns to protect against entry of water or air.

Automotive Sales Professional

Sterling McCall Nissan
Stafford, Texas
02.2016 - 03.2017
  • Studied characteristics, abilities, and features: compared and contrasted competitive models and specs
  • Professionally met and greeted customers in person making them feel comfortable, understanding, and welcomed using great communication and presentation skills
  • Make phone calls to customers, set up appointments for product presentation
  • Check emails, reply and reach out to customers and other business partners for shipping and receiving
  • Kept precise records of required set target goals using Microsoft Excel using formulas and functions
  • Wrote documents and disclosures up for managers and customers using Microsoft Word
  • Closed sales by overcoming objections; asking for sales; negotiating price, explained product provisions, services and financing

Sales Associate

General Nutrition Centers
Kingwood, Texas
10.2014 - 01.2016
  • Demonstrated superior knowledge in personal health nutrition and supplement products to assist customers with the selection and purchase of company products
  • Answered questions on nutritional and supplement products based using knowledge from company training, merchandising bulletins and other Company approved information
  • Sell merchandise and interact with customers according to company standards
  • Receive, check in and shelve merchandise; keep store clean and uncluttered
  • Complete customer transactions using Point of Sales computer system
  • Perform register store open/close functions and bank deposits.

Construction Foreman/Estimator

Legacy Fence & Concrete Company
, Texas
02.2014 - 10.2014
  • Obtained notices of completion and compliance certifications from construction administration consultants
  • Assigned projects and tasks to employees based on their competencies and specialties
  • Performed construction site preconceptions and coordinated post-construction audits
  • Accurately provided status information on project progress to the project management
  • Properly maintained all onsite equipment and vehicles
  • Ordered supplies, tools and equipment
  • Assisted workers with work duties using construction equipment, power tools, and materials
  • Measured precisely for correct amount of materials needed, fittings, distance, and coverage.

Education

BIM I & II Certified -

Bilingual (Spanish)
01.2018

Student -

Lone Star Community College
01.2016

High School Diploma -

Porter High School
01.2014

Skills

  • Reporting
  • Safety Policies and Procedures
  • Dedicated Work Ethic
  • Interpersonal and Written Communication
  • Worksite Safety
  • Hand and Power Tools
  • Employee Training
  • Critical Thinking
  • Job Planning
  • Teamwork and Collaboration
  • Effective Communication
  • Attention to Detail
  • Dimensions and Measurements
  • Prioritization
  • Project Deadlines
  • Spanish Fluency

Timeline

Industrial Heavy Civil Surveyor Assistant

Performance Contractors
05.2023 - Current

Logical Foreman / Assistant Superintendent

Resia Shell Division / AHS Residential
05.2022 - 05.2023

Maintenance Coil Tube Roller Mechanic

Tenaris Bay City
12.2021 - 05.2022

Industrial Paint Foreman

Schnurr Painting & Coating LLC | Tesla / Samsung
02.2021 - 12.2021

Rigger

Consolidated Crane & Rigging
11.2019 - 02.2021

Industrial Painter

LyondellBassell CVO & LHR, Brand
04.2019 - 11.2019

Ironworker Top Helper

INEOS, Chocolate Bayou, Performance Contractors
05.2018 - 05.2019

Leadman

Primoris Heavy Civil Construction / Flatiron
04.2017 - 04.2018

Automotive Sales Professional

Sterling McCall Nissan
02.2016 - 03.2017

Sales Associate

General Nutrition Centers
10.2014 - 01.2016

Construction Foreman/Estimator

Legacy Fence & Concrete Company
02.2014 - 10.2014

BIM I & II Certified -

Bilingual (Spanish)

Student -

Lone Star Community College

High School Diploma -

Porter High School
Frank Nicholas Rosas