Dynamic production lead with a focus on optimizing workflows and enhancing product reliability. Strong background in training teams on assembly techniques and safety protocols, driving significant improvements in efficiency and quality assurance.
Overview
11
11
years of professional experience
Work History
Production Lead
S2A Modular
Lathrop, CA
04.2022 - 04.2025
Oversaw daily production schedules to ensure timely completion of modular construction projects.
Trained and mentored team members on assembly techniques and safety protocols.
Implemented quality control measures to enhance product reliability and customer satisfaction.
Coordinated workflow between production teams, optimizing resource allocation and efficiency.
Assembler
West Star
Stockton, CA
08.2021 - 04.2022
Assembled components according to blueprints and specifications, ensuring high-quality standards.
Operated hand tools and machinery to fabricate products efficiently and safely.
Conducted quality inspections on finished assemblies, identifying defects and implementing corrective actions.
Collaborated with team members to streamline assembly processes, improving workflow efficiency.
Termite Technician
California Pest Control
Stockton, CA
06.2021 - 08.2021
Conducted thorough inspections to identify termite infestations in residential and commercial properties.
Applied appropriate treatments using advanced pest control technologies and chemicals.
Educated clients on preventative measures and maintenance strategies for termite control.
Collaborated with team members to develop efficient treatment plans that maximize effectiveness.
Wall Framer
Katerra
Tracy, CA
07.2020 - 06.2021
Constructed precise wooden frames utilizing advanced framing techniques and tools.
Ensured quality control by inspecting finished frames for structural integrity and compliance with specifications.
Collaborated with team members to streamline assembly processes, reducing material waste and increasing efficiency.
Mentored junior framers on best practices for safety protocols and tool operation.
Insulator
Rad Urban
Lathrop, CA
03.2017 - 07.2020
Insulated piping systems to enhance energy efficiency and reduce environmental impact.
Collaborated with construction teams to ensure timely and accurate installation of insulation materials.
Trained junior insulators on safety protocols and best practices for material handling.
Conducted quality inspections to verify compliance with industry standards and specifications.
Granite Fabricator
Marble Palace
Stockton, CA
03.2014 - 03.2017
Operated CNC machines for precision cutting of granite slabs.
Interpreted blueprints and technical drawings to ensure accurate fabrication specifications.
Collaborated with design teams to develop custom stone solutions for clients.
Supervised team of fabricators, ensuring adherence to safety protocols and quality standards.