Experienced Electrician with diversified knowledge of large scale commercial and institutional Facilities Operations. Demonstrated ability to establish trust and rapport with clients, colleagues and contractors through effective communication. Approaches customer service with clarity, thoughtfulness and sound judgment. Collaborative leader with extensive experience estimating, budgeting and quality control. A creative problem solver with a strong ability to pivot & prioritize in dynamic situations.
Overview
22
22
years of professional experience
1
1
Certification
Work History
Projects Teams - Electrical Specialist
UCSD
10.2024 - Current
Consult with clients, vendors, inter-department personnel to prepare detailed cost estimates by generating Gannt Charts and similar documents.
Develop and submit bids and proposals to clients by outlining scope and cost project.
Review project details to determine labor and material requirement and prepare itemized lists.
Analyze and recommend material purchases to ensure cost-efficiency without sacrifice to project quality.
Coordinate, schedule and prioritize trades such as HVAC, carpentry, pipefitting, electrical, painting plastering, general contracting to minimize disruption to building occupants.
Coordinate electrical and and utility shutdowns for construction and renovation projects.
Work collaboratively with internal and external campus customers to plan and schedule maintenance, renovations, installations and repairs.
Provide safe and secure facilities environment by coordinating with multiple units to ensure adherence to California Building Code, Uniform Building Code, applicable fire code and life and safety standards.
Inspect maintenance materials, procedures and work performed on construction, renovation and installation projects.
Identify deficiencies and make recommendations for necessary repairs and replacements.
Assist department leadership with budget development for minor building infrastructure upgrades.
Maintain functional awareness of typical work place hazards that may be encountered. Follow established procedures for dealing with such hazards.
Provide excellent client relations through effective communication.
Maintain cooperative working relationships with Team Members by providing individualized training, advice, support and sense of direction.
Navigate high-pressure, fast pace environment that centers client relations by adapting to fluid situations with confident, creative solutions.
Facility Team - Electrician
UCSD
08.2022 - 10.2024
Keen knowledge in building space needs, building codes, safety, security, capacity, risk evaluation within department principles and procedures
Maintain professional correspondence with vendors, sub contractors, customers, management and colleagues
Independently manage multiple, concurrent projects with sense of prioritization and urgency
Ability to anticipate potential complications and risks, develop and implement solutions
Monitor progression of all projects by engaging with UCSD staff, fellow maintenance crew, outside vendors and management
Providing budget and timelines with an eye for accuracy
Conducts plan review on submitted architectural drawings for quality control, safety, code compliance, and alignment with architectural history and infrastructure
Strong communicator with experience in de-escalation
Owner/Operator
Herness Electric, Inc
12.2013 - 08.2022
Installation of electrical services from 100 amps-2000 amps
Specializing in custom electrical solution for institutions
Design and implementation of wiring systems for commercial & industrial tenant improvements
Developing long lasting relationships with clientele, subcontractors, customers, inspectors, plan reviewers, suppliers and vendors
Coordinating with General Contractors, municipalities & utility companies for disconnect/reconnects, permitting & inspections with minimal disruption to building occupants
Emergency service calls of commercial and residential systems
Troubleshooting of lighting systems in commercial buildings
Employee management and engagement
Approving & creating line diagram drawings for city approved projects
Estimating and budgeting
Client meetings
Project Management
Value engineering solutions
Engineering, design & installation of Photovoltaic Systems 2kw-60kw
Reading & understanding blueprints and construction plans
Maintaining construction change logs and client approvals
Managing schedule and workload for several projects
Issuing payments per payment schedule to subcontractors
Journeyman Electrician
Absolutely Electric, Inc
01.2012 - 01.2014
LED lighting retro fits
Title 24 lighting control systems, occupancy sensors, vacancy sensors, daylight sensors, PLC controls (multiple brands)
Installation & programming of in wall timers & astronomical timers (Intermatic ST01, Leviton UPT24-1P2, Tork RZ307, MyTouchSmart & more
Installation & programming of all Intermatic mechanical & digital timers (ET1105C, ET1105CMX, ET1115CRMX, T10)
Installation of lighting contactors to handle high wattage/amperage loads
Installation & programming of of all Lutron lighting systems in commercial buildings (Vive, Quantum, Limelight)
Installation, programming & management of Lutron XPS, LCP128, Enterprise Vue
Installation & programming of all Lutron daylight, occupancy/vacancy/daylight sensors in commercial & residential buildings to comply with Title 24 requirements (LRF2-0CR2B-9, LRF2-OWLB-P, LRF2-OHLB-P, LRF2-VCRB-P-, LRF2-VWLB-P, LRF2-DCRB)
Commercial T.I.’s 500-7,000 sqft
Replacement & repair of mechanical & digital touch plate systems
NLight lighting control system for restaurant commercial building controls
Whole house rewire
Ground up, whole house wiring
Service upgrades, 100-2,000 amp
Residential and commercial service calls
Residential and commercial troubleshooting
Residential Project Manager
Self
12.2019 - 03.2020
Managed design, budget, subcontractors on a 1,200' sq ft new home build with attached garage
Hands on experience with site work, framing, plumbing, all electrical, concrete & flat work, waterproofing, siding installation, PV system
Coordinated with all utilities and municipality to bring in new gas and electrical services
Coordinated all aspects of permit submittal and city inspections
Successfully managed multiple trades simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with project goals.
Residential Project Manager
Self
03.2009 - 03.2020
Brought a circa 1946 California Bungalow back to it's former glory
The home had several decades of deferred maintenance and structural issues
Performed all aspects of restoration including replacing all plumbing & sewer
Brought outdated, unsafe electrical system to code by rewiring entire house, updated the main electrical service, installed new switches, outlets, ceiling mounted fixtures, smoke alarms and, pendants
Removed vinyl siding, repaired/replaced original Redwood clapboard siding
Installed new windows and doors throughout
Refinished original wood flooring
Installed new tile in all bathrooms and on fireplace surround
Managed foundation crew to repair foundation piers
Performed repairs of lath & plaster
Replaced roof
Restored built-in cabinets
Built new perimeter fence around the entire property, Installed new entry steps and concrete pathways throughout property
Restored, repaired front porch columns
Installed new, but historically accurate window trims to interior doors and windows
Designed and built new kitchen, including cabinets, lighting, flooring, plumbing and, electrical
Managed subcontractors, created and adhered to budgets and timelines.
Journeyman Electrician
North American Industry Tech
01.2010
Installation, testing, & maintenance of pump control panel systems
Assembling and installation of PLC controls for pump stations
Manufacturing & installation of pressure sensor devices in potable water, waste water, oily waste tanks
Integration of sensors into existing or new pump/ monitoring systems
Installation of float sensor systems in tanks to operate pump controls & alarm function
Monitoring of pump stations throughout all navy bases of San Diego
Assembling, installing, testing & maintaining of pump system for potable water, waste water systems
Chemical testing of water at pump stations throughout Navy bases
Installation and routine inspection/testing of chlorine sampling monitoring devices
Testing & replacing magnet sensors in oily waste drain pipe and tank system on Navy bases
Multiple VFD installations for 480v and 208/240v motor control systems
Routine maintenance/testing of all sensors and equipment at pump stations (potable and waste) systems throughout all navy bases and Pala Casino
Onsite standby maintenance of Camp Pendleton’s storm water pump station during extreme rain storms
Removal & replacement of guide rail submersible pump systems in tanks ranging from 10'-30' deep
Installation, maintenance & testing of ultrasonic flow meters throughout all San Diego Navy bases' oily waste facilities
Installation, maintenance & testing of turbine flow meters
Journeyman Electrician
ZED Electric
01.2010 - 01.2010
Installation of new residential electric services
Troubleshoot residential service call issues
Installation of switches, outlets, doorbells, can lighting, ceiling mounted fixtures in residences
Multiple whole house rewire
Created customer invoices
Journeyman Electrician
AVCO Electric
01.2008 - 01.2010
Project Management
Installation of (6) UPS cabinets for 9,000 amps of power
(3) Catapiller Generator installations for back up power
Electric distribution; transformers, panel boards, branch circuitry
Integrate new 9,000 amp backup power system into existing electrical system
Installation of circuitry in energized electric panels
Apprentice Electrician
California Southwest Electric
01.2005 - 01.2008
Proficient in use of hand tools, power tools and, measuring devices
Oversaw all projects from start to finish
Created schedule, updated supervisor, maintained communication with all staff
Conduit installation 1/2”-4” EMT and Rigid
Using hand benders, hydraulic benders, and pre bend fittings
Wire pull and make up devices to outlets, switches, load centers, panel boards, commercial/industrial generators, commercial/industrial UPS equipment, 400-4,000 amp switchgear, 30- 3,000 amp disconnects/automatic transfer switches/transfer switches, 3-500KVA transformers
Installation of (5) back up generators; 1,000-2,000 amps, for multiple data centers
Tie in with UPS systems
Installation of back up power not on UPS back up
Installation of (5) UPS backup systems; 1,000-2,000 amps, for multiple data centers
Tie in UPS system with back up generators and local utility power
Installation of (5) Automatic transfer switches for switching back up UPS and generator power for data center back up power
Ground up installation of full data centers
Installation of (30+) transformers ranging from 75-500KVA
Installation of (10+) switchgear cabinets
Ranging from 400-3,000 amps
Installation of (40+) panel boards and load centers for power distribution at data centers, commercial/industrial factories, office buildings, residences
Installation of disconnects for commercial/industrial applications
Plastic extruders, air conditioners, chillers, industrial compressors, PLC cabinets
Installation of different styles standard knife switch to “bucket” style
Live tap installation of bucket disconnects into buss ducting system for industrial power extension
Installation of (5+) VFD installations for various equipment
Completion of installing all electrical circuitry in live electric panels/cabinets/switchgear, 15- 800 amp
Installation of breakers of all sizes 15-400 amp to live bussing
Installation of bussing “fingers” to live bussing for expanding electric power to existing building/service
Installation of power monitoring systems to industrial facility to manage dirty power from utility