Summary
Overview
Work History
Skills
Timeline
Self employed

Gary Dunn

Air solutions/self employed
Elm Mott,TX 254-625-0569
45
years of professional experience

Skilled Electrician Lead Hand specializing in electrical system troubleshooting, preventive maintenance, and safety compliance. Led teams in achieving project goals through effective communication and problem-solving. Committed to delivering high-quality work on time and fostering a collaborative work environment.

Work History

Self employed

26 Years 3 Months
Air solutions/self employed | Killeen, TX | 08.2000 - Current
  • Maintained and installed all types of Hvac equipment and Rerigeration in Killeen and surrounding areas including Austin to Waco
  • Inspected air handlers, chillers, and rooftop units for operational issues.
  • Troubleshot refrigeration and electrical faults using standard test equipment.

HVAC Technician and facility Electrician

1 Year 11 Months
Mantech/ Ft.Hood Tx. Locaton | Fairfax, NV | 07.1998 - 06.2000
  • ls,planning and layingout Led HVAC installation of commercial projects.
  • Verified measurements, layout, and clearances before starting system installation.
  • Installed ductwork, air handlers, condensers, and thermostats to project specifications.
  • Coordinated with technicians and supervisors on jobsite schedules and daily tasks.
  • Inspected equipment connections, refrigerant lines, and electrical wiring for proper setup.
  • Loaded, transported, and organized tools, parts, and equipment for each jobsite.
  • Communicated with customers about installation steps, access needs, and site readiness.
  • Analyzed project requirements to determine the best approach for successful implementation of new systems or services.
  • Demonstrated proper use of equipment to reduce accidents and meet health and safety requirements.
  • Demonstrated efficiency and dedication to quality by contributing to successfully completed jobs.
  • Inventoried material, tools, and equipment to record product on-hand or to be ordered.
  • Read and comprehended technical documentation, checked measurements and reviewed site conditions to facilitate installation.
  • Answered questions and responded to issues to deliver exceptional service to customers.
  • Investigated customer complaints regarding installation processes or quality assurance practices.
  • Reviewed schedules and work orders to determine supplies and materials for assignments.
  • Removed systems and fixtures to prepare for replacements.
  • Collaborated closely with other departments within organization to ensure timely resolution of any issues encountered during installations.
  • Identified potential risks associated with installations and proposed solutions to mitigate them prior to deployment.
  • Surveyed job sites to identify positions and locations for equipment.
  • Wired equipment while following safe electrical procedures to eliminate risk.
  • Created detailed installation plans for new projects while ensuring customer satisfaction.
  • Notified supervisors of faulty operations and defective materials to improve production.
  • Utilized facility tracking system to keep accurate records of completed repairs.
  • Reviewed existing documentation to identify areas needing improvement or additional information.
  • Prepared detailed reports on installation progress throughout the duration of each project cycle.

Lead installer/sevice tech

6 Years 8 Months
Ellis Air Systems | Killeen, Texas | 11.1991 - 07.1998
  • Diagnosed Killeen area heating and air system failures during service calls.
  • Performed preventive maintenance on furnaces, condensers, and air handlers.
  • Installed HVAC units, ductwork, and thermostats for residential and commercial customers.

HVAC Technician

2 Years 3 Months
Killeen Heating and Air | Killeen, Texas | 08.1989 - 11.1991
  • Installation of new residential and commercial equipment,including ductwork flex and trunklines.
  • Ran service truck for cleaning, reparing , servicing equipment, and checking refrigerant pressures,etc...

Electrician Lead Hand

1 Year 10 Months
Wilmar Electric | Wilmar, Mn. | 08.1987 - 06.1989
  • Supervised WilmarElectric field crews on commercial electrical installations.
  • Coordinated daily work assignments for electricians and apprentices.
  • Inspected conduit, wiring, and panel layouts for code compliance.
  • Trained apprentices on tools, safety practices, and jobsite procedures.
  • Interpreted drawings and blueprints for Wilmar Electric projects.
  • Communicated material needs with foremen and project teams.
  • Troubleshot electrical faults in service and construction settings.
  • Enforced lockout tagout and safe work practices on site.
  • Performed preventive maintenance on electrical systems and equipment.
  • Troubleshot complex electrical problems using appropriate testing devices such as multimeters, ammeters.
  • Measured, cut bent threaded assembled installed conduit pipe tubing.

Electrician Lead Hand

4 Years 4 Months
Lloyd Electric | San Antonio, Texas | 04.1982 - 08.1986
  • Supervised Lloyd Electric field crews on commercial electrical installations.
  • Coordinated daily work assignments for electricians and apprentices to optimize workflow and meet project deadlines.
  • Inspected conduit, wiring, and panel layouts for code compliance.
  • Communicated material needs with foremen and project teams.
  • Interpreted drawings and blueprints for Lloyd Electric projects.
  • Troubleshot electrical faults in service and construction settings.
  • Enforced lockout tagout and safe work practices on site.
  • Performed preventive maintenance on electrical systems and equipment.
  • Troubleshot complex electrical problems using appropriate testing devices such as multimeters, ammeters.
  • Measured, cut bent threaded assembled installed conduit pipe tubing.
  • Repaired malfunctioning systems by replacing defective components or wiring.
  • Ordered necessary parts, supplies, tools and equipment needed for installations or repairs.
  • Inspected electrical systems, equipment and components to identify hazards, defects, and the need for adjustment or repair.
  • Installed control devices such as circuit breaker panels switches, transformers.
  • Provided technical guidance to junior electricians regarding wiring installation, repairs and maintenance.
  • Reviewed blueprints of electrical layouts and schematics to determine materials requirements and installation procedures.
  • Ensured compliance with local state national codes regulations safety standards.
  • Constructed conduits, trays, baskets for routing of wires in walls ceilings floors.
  • Connected power cables from source to fixtures motors outlets junction boxes.
  • Developed strategic plans for job completion within timelines and budget constraints, ensuring effective resource allocation.
  • Followed electrical code manuals to install and repair electrical systems.
  • Promoted safety and work site awareness by identifying and removing potential hazards and effectively training team members in safety protocols.
  • Tested electrical equipment and components for continuity, current, voltage, and resistance.
  • Obtained proper permits to carry out electrical work on facility and construction projects.
  • Functioned as crew leader, overseeing work of lower-level licensed electricians and trade helpers.

Skills

Blueprint interpretation
Code compliance
Conduit assembly

Timeline

Self employed

Air solutions/self employed
08.2000 - CurrentRead More

HVAC Technician and facility Electrician

Mantech/ Ft.Hood Tx. Locaton
07.1998 - 06.2000Read More

Lead installer/sevice tech

Ellis Air Systems
11.1991 - 07.1998Read More

HVAC Technician

Killeen Heating and Air
08.1989 - 11.1991Read More

Electrician Lead Hand

Wilmar Electric
08.1987 - 06.1989Read More

Electrician Lead Hand

Lloyd Electric
04.1982 - 08.1986Read More
Gary Dunn