Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Gary D Fox Jr

Hico

Summary

With a proven track record at Kent Power, I excel in project management and relationship building, ensuring project completion 100% on time while enhancing quality standards. My leadership in construction supervision and coordination has driven seamless execution and fostered team productivity, significantly reducing project costs and improving client satisfaction.

Resourceful Site Supervisor tenacious about keeping operations on-schedule and on-budget. Successful at coordinating diverse resources and satisfying tough clients according to demanding timelines.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Superintendent

Kent Power
03.2021 - 01.2025
  • Reviewed design specifications critically for accuracy, identifying potential issues before they escalated into costly delays or rework situations.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Communicated effectively with clients throughout each stage of the project for transparency regarding progress updates as well as addressing any concerns raised promptly.
  • Managed multiple simultaneous projects while maintaining strict deadlines and adhering to budget constraints.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Collaborated with architects, engineers, and contractors to achieve seamless project execution.
  • Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Mentored junior staff, leading to increased productivity and improved teamwork throughout the organization.
  • Maintained safety onsite and upheld all OSHA regulations by [Action].
  • Conducted regular site inspections to maintain compliance with industry regulations and standards.
  • Worked with specialized teams to accomplish all objectives and achieve goals.
  • Enforced rigorous safety procedures during daily operations, creating a safe working environment for all personnel involved in the project''s execution process.
  • Established effective quality control measures for consistent delivery of high-quality construction projects.
  • Scheduled and supervised maintenance and repair of equipment, buildings and grounds.
  • Resolved conflicts between staff and customers swiftly and professionally.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Analyzed reports to identify areas of improvement and implement corrective action.
  • Evaluated subcontractor performance regularly, ensuring adherence to contract requirements and maintaining accountability throughout the lifecycle of each project.
  • Stepped up during foreman's absence to answer questions and delegate project tasks to employees.
  • Incorporated innovative construction techniques into projects, resulting in improved efficiency and overall quality of workmanship.
  • Optimized resource allocation to minimize delays and maximize project success.
  • Managed [Number] workers when performing duties in line with local and national building codes in construction.
  • Developed and maintained productive working relationships with internal and external stakeholders.
  • Monitored budgets and expenditures to maintain fiscal responsibility.
  • Championed continuous improvement initiatives within the organization, introducing new methodologies to increase productivity and reduce overall project costs.
  • Coordinated permit acquisition processes for smooth progress on all construction projects.
  • Enhanced project efficiency by streamlining communication between team members and stakeholders.
  • Developed comprehensive budgets and schedules to ensure timely project completion within allocated resources.
  • Negotiated contracts with vendors, resulting in cost savings and stronger relationships with suppliers.
  • Implemented comprehensive teacher evaluation system, improving teaching standards and student performance.
  • Boosted staff morale and performance through effective leadership and professional development opportunities.
  • Developed and executed innovative curriculum plans, significantly improving student engagement and learning outcomes.
  • Managed budget allocations efficiently, ensuring optimal use of resources for educational excellence.
  • Negotiated with vendors for better rates on school supplies, significantly reducing annual expenses.
  • Directed facility upgrades to provide safer and more conducive learning environment.
  • Improved special education programs, ensuring compliance with regulations and meeting diverse student needs.
  • Cultivated partnerships with local businesses and organizations, securing resources and opportunities for students.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Directed projects according to schedule and quality demands.
  • Provided feedback to workers on job performance and safety procedures.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected equipment and tools used for safe operation.
  • Sourced suppliers and purchased necessary materials for work.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Created and implemented plans to maximize efficiency of workers.

General Foreman

L.E. Myers
01.2017 - 03.2021
  • Worked alongside team to accomplish work goals according to schedule.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.
  • Enhanced job site safety through regular inspections, hazard assessment, and implementation of corrective measures.
  • Demonstrated strong leadership abilities in managing diverse teams to achieve common goals while fostering a positive work environment.
  • Improved project efficiency by effectively delegating tasks and managing a team of skilled workers.
  • Conducted thorough risk assessments before commencing projects, identifying potential challenges and developing contingency plans accordingly.
  • Assigned daily duties to each employee based upon individual strengths, effectively completing [Number]% of roofing jobs on time.
  • Established open lines of communication with clients, providing regular updates on project status and addressing concerns promptly.
  • Mentored junior team members in the development of their skills, providing guidance and support that facilitated career advancement opportunities.
  • Analyzed blueprints to determine where to run wires, install electrical outlets and connect wires to central circuit panels.
  • Contributed to company growth by consistently delivering exceptional results, leading to repeat business opportunities from satisfied clients.
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Prepared daily time cards and assisted in preparation of estimates and scope of work statements.
  • Adhered to US Occupational Health and Safety Administration mandates requiring use of gloves and insulating blankets for installation of high-voltage equipment.
  • Optimized resource allocation for increased productivity by closely monitoring project progress and adjusting schedules as needed.
  • Elevated team morale through the implementation of effective recognition programs that acknowledged outstanding individual contributions.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Checked equipment to determine if maintenance was required.
  • Reviewed project details to specify correct materials and equipment for job sites.

Journeyman Lineman

American Electric Power, AEP
03.2014 - 01.2017
  • Restored power to thousands of customers following severe weather events, ensuring minimal downtime for affected areas.
  • Constructed new power lines, contributing to the expansion and improvement of the electrical grid.
  • Collaborated with other linemen to complete complex projects efficiently and within specified timeframes.
  • Assisted in the training of apprentice linemen, sharing knowledge and expertise to develop future industry professionals.
  • Repaired damaged equipment promptly with a focus on quality craftsmanship and long-lasting results for increased durability.
  • Supported ongoing infrastructure upgrades by replacing outdated poles, wires, insulators, transformers as part of planned initiatives.
  • Performed skilled aerial work using bucket trucks and climbing gear for efficient access to high-voltage equipment.
  • Hooked up transformers to poles and lines.
  • Improved safety measures by conducting regular inspections of transmission and distribution systems.
  • Removed old poles and hardware and replaced with new equipment.
  • Contributed to positive team dynamics through clear communication, collaboration, and mutual support among fellow linemen.
  • Installed transformers, switches, and other components to optimize system performance and minimize disruptions.
  • Reduced outage durations by quickly diagnosing issues and implementing effective solutions in emergency situations.
  • Conducted thorough assessments of storm-damaged systems for prompt repair or replacement recommendations.
  • Prioritized safety by participating in regular team meetings, addressing potential hazards, and adhering to established procedures.
  • Set ground anchors and guying systems for utility poles.
  • Managed multiple tasks simultaneously under challenging conditions while maintaining accuracy and attention to detail in all work performed.
  • Ensured timely completion of assigned tasks through effective time management skills.
  • Analyzed preparation documents to correctly set up installations at job sites.
  • Enhanced system reliability by performing routine maintenance on electrical equipment and power lines.
  • Inspected and tested lines or cables, recording and analyzing test results to assess transmission characteristics and locate faults or malfunctions.
  • Read and interpreted [Type] plans, prepared supplies and developed effective plan of action before beginning work.
  • Demonstrated commitment to customer satisfaction by addressing and resolving service-related issues promptly and professionally.
  • Streamlined workflow processes by organizing tools and materials effectively before commencing each project or task.
  • Measured pole attachments and completed proper fitting and construction according to NESC guidelines.
  • Accessed specific service areas to string lines and install terminal boxes, auxiliary equipment, or metering appliances.
  • Sought continuing education opportunities such as [Type] to refresh working knowledge and develop newest techniques such as [Type].
  • Coordinated with utility companies during joint projects involving shared resources or overlapping service areas to ensure seamless execution.
  • Installed and maintained overhead and underground electrical power lines and auxiliary equipment.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Installed, spliced and maintained overhead and underground power lines for residential and commercial customers.
  • Inspected power lines for any damage or irregularities and replaced components.
  • Followed all safety protocols and regulations while working at height and with live electricity.
  • Enforced adherence to industry best practices, safety protocols and proper installation techniques.
  • Responded to emergencies and outages that required additional labor and assistance for repairs.
  • Performed powerline maintenance by cleaning and lubricating components and replacing worn parts.
  • Assisted with constructing new power lines by using appropriate tools and equipment.
  • Observed company safety rules and regulations to minimize workplace accidents and reduce electric shocks.
  • Recorded accurate measurements for installed new power lines and poles.
  • Inspected power lines and poles for signs of damage or wear, interference, and degradation, and reported findings to supervisor.
  • Added or removed wire to shorten or lengthen lines, using various types of splices, connectors and clamps.

Foreman

PAR Electrical Contractors
03.2006 - 01.2017
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
  • Monitored progress against established benchmarks, adjusting strategies as necessary to meet targets consistently.
  • Successfully mitigated risks associated with complex projects by conducting thorough risk assessments and implementing appropriate contingency plans.
  • Managed equipment maintenance schedules to minimize downtime due to mechanical failure or repairs.
  • Implemented efficient work processes to boost overall productivity while reducing costs.
  • Championed company values through consistent modeling of ethical behavior and adherence to corporate policies.
  • Assisted in the recruitment process for new team members, selecting candidates who demonstrated aptitude for success within the organization.
  • Fostered culture of continuous improvement, leading by example and encouraging innovative solutions.
  • Elevated safety standards, conducting regular training sessions and safety audits.
  • Reduced material waste significantly, implementing stringent inventory management and usage tracking systems.
  • Improved client satisfaction with meticulous oversight of project requirements and quality standards.
  • Enhanced team productivity by coordinating daily tasks and optimizing workflows.
  • Ensured project milestones were met, overseeing scheduling and execution of construction phases.
  • Promoted innovation, encouraging adoption of new technologies and methods to improve project outcomes.

Education

High School Diploma -

Midland Trail
Hico, WV

High School Diploma -

Fork Union Military
Fork Union, VA

Skills

  • Relationship building and management
  • Project coordination
  • Project management
  • Quality assurance
  • Construction supervision
  • Quality standards
  • Construction management

Certification

2 different apprenticeship programs ( Alabat, AEP )

Smith driving school

Hot stick school

urd training

34.5 kv gloving school

rigging and stringing

ohsa 10 and 30

Cpr

First aid

Trouble Shooting

Switching and Tagging ( power company )

pole top rescue



Timeline

Superintendent

Kent Power
03.2021 - 01.2025

General Foreman

L.E. Myers
01.2017 - 03.2021

Journeyman Lineman

American Electric Power, AEP
03.2014 - 01.2017

Foreman

PAR Electrical Contractors
03.2006 - 01.2017

High School Diploma -

Midland Trail

High School Diploma -

Fork Union Military
Gary D Fox Jr