Summary
Overview
Work History
Education
Skills
References
Certificationsandeducation
Timeline
Generic

GERALD FULKERSON

Christiana,TN

Summary

Seasoned Oil and Gas professional who excels with on-site management and coordination of construction, materials, and equipment on designated projects. Plans and facilitates personnel and subcontractors to perform construction of assigned scope of work in a productive and safe manner to provide the client with a quality end product.

Overview

14
14
years of professional experience

Work History

Project Superintendent

Castle Energy Group, LLC
Meridian , MS
06.2013 - Current
  • Enterprise - Magnolia Pipeline Project 5.8 miles of 6” , in Sulphur, La and 10,000' of HDD's and 1,500' of bores
  • Oneok Pex Loops Spread 40.43 Miles of 24" Pipeline consisting of 3 pipeline loops Cedar Mountain, Thurber and Bridgeport. All three loops required rock saws.
  • Texas Gas - Henderson Pipeline Installation of 23 miles of 20" pipeline and he AB meter and regulator station
  • Phillips 66 - P66 Rosebud Installation of 15.9 Miles of 10" in solid rock.
  • TC Energy - TCE CGT Special Permit Valve Project Installation of 9 mod kits on existing MLV actuators and replacement of 3 actuators at 7 locations
  • Southern Star Central Gas Pipeline - HWY 76 ODOT Line VP Relocate Replace 16" Pipeline under HWY 76 by method of HDD - 554 LF HDD with 350 LF of Open Cut C0001806 Install L/R on Line VHB/VH & C000200 Replace Line VJ Isolation Valve Replace 5 Miles of 8" with 12" Install 1 12" Launcher and 1 12" Receiver Replace 4 12" 90-degree fittings
  • Florida Gas Transmission - Putnam Expansion Installation of 20 Miles of 30" 0.625 wall pipeline with 2 HDD's and 12 Road Bores
  • Kinder Morgan - TGP Carrollton, OH Class Change Excavate & Replace 4,245 ft of 36'' Piping and 4,188 ft of 26'' Piping Install one 26'' MLV & one 36'' MLV in rock terrain.
  • Florida Gas Transmission - DE I/R 6" Hydro, Caliper Run & Piping Mod Projects 1.8 Miles of 6" Hydrotest and caliper tool run
  • Southern Star - DS Laterals- Richmond, Scipio, Garnett DS Laterals 001,002,008. 37,020 ft in rocky condition.
  • Praxair - P66 Pasadena Pipeline Project Install approximately 7,200' of 10" N Pipeline connecting the Praxair 12" Trunk Line to the P66 Terminal Praxair P-66 10'' Lateral Initial scope is to assist with final route planning, design and plan HDD route, and determine tie-in and TWS points along the ROW
  • Energy Transfer - 24'' LAMEA-9 Pipe Replacement Project - Offset and install 1,300 feet of 24'' mainline pipe Dig and remove existing 24'' mainline pipe
  • Boardwalk / Gulf South - Installation of one below ground ball valve and dual above ground piping runs, and all appurtenances and connecting pipe
  • Enbridge / Texas Eastern - Abandonment Project Removing valves, piping, & appurtenances at above ground facilities, removal of pipe at line exposures, removal or grouting of pipe
  • Williams / Transcontinental - Spread 15 - Installation and Modification of 36" and 42" Mainline Valves, Launchers, & Receivers at (8) locations
  • Texas Gas Transmission, LLC - Construct and install facilities ay Texas Gas's Slaughter Compressor Station
  • Southern Star Central Gas Pipeline - CMR59207 - Line VO Records Remediation Pressure test and 480 ft Replacement Project Hydrostatic Testing-Integrity Reassessment - Pressure Test Line FS M58970 4.21 miles Southern Star - Install 1500 ft of 20", Remove existing 20" Pipeline
  • Southcross - Install approximately total of 20,316 ft (3.85 miles) of 8" x 0.188" wall, API 5L Grade X52, FBE coated line pipe, and 8" x 0.250"
  • Southern Star - M57817 & M58149 MAOP Records Remediation Hydrotest Hydrostatic testing of existing pipeline
  • Energy Transfer - 32.76 miles of 30",14 conventional bored crossings, HDD crossings,1 30" receiver assembly,1 30" ML valve assembly & 4 30" pre-fabricated ML valves
  • Southern Star - Installation of 4" Tap Valve with Extension on Line XE and Abandon 8,900' of 16" on Line XQ
  • ONEOK - ONEOK - Spread 6B- 16.3 Miles of 16"
  • BridgeTex - Spread 6 - 40 miles of 24" PL in power line corridor
  • ONEOK - ONEOK - Spread 6A- 58 Miles of 16"
  • Talisman - Young Kennedy to Escondido Creek 4,000' of 8" Pipeline 16,039' of New 8" Pipeline Installation
  • Stat Oil - Wess 3 Escondido B5 - 800' of 8" Pipeline Installation; Fabrication of Launcher/Receiver and Installation of (1) Receiver

Project Superintendent

Louisiana Crane and Construction
01.2012 - 01.2013
  • Talisman - Well Hook Up Installation
  • Installed Low Lines for Cooke D Well Pad

General Superintendent

Strike Construction
01.2011 - 01.2013
  • Talisman - 8 Miles of 12" Pipeline Installation
  • 6 Miles of 8" Pipeline Installation
  • 3 Miles of 8" Launcher and Receiver Installation Project
  • EOG - 8 Miles of 8" and 12" Pipeline Installation

Education

Basics

Meridian Community College
Meridian, MS
05-1994

Skills

  • Leadership and management skills Planning and scheduling Experience and the ability to work under pressure safely and efficiently!

References

  • Chandler Watkins, (682) 597-3556, Construction Manager, Enbridge
  • Kevin Carman, (270) 779-3893, Construction Manager, Boardwalk
  • Cory Burkhart, (316) 371-7286, Construction Manager, Southern Star. Joseph Greenleaf (505) 320-2687 Construction Manager, Oneok. Ivy Harper (985) 974-9765, Construction Manager, ETC Florida Gas

Certificationsandeducation

  • OSHA 30
  • First Aid
  • Excavation Competent Person
  • Other Trainings Available Upon Request

Timeline

Project Superintendent

Castle Energy Group, LLC
06.2013 - Current

Project Superintendent

Louisiana Crane and Construction
01.2012 - 01.2013

General Superintendent

Strike Construction
01.2011 - 01.2013

Basics

Meridian Community College
GERALD FULKERSON