Summary
Overview
Work History
Education
Skills
Timeline
Generic

Gerardo Pacheco

San Antonio,TX

Summary

Responsible Construction Superintendent with 13 years of comprehensive hands on field experience leading teams on projects from 50k to 350M. Outstanding blueprint and design interpretation and comprehension abilities with excellent communication, budgeting and project management talents. Extensive knowledge of all construction sub-trades, construction materials and supplies.

Overview

13
13
years of professional experience

Work History

Assistant Superintendant

Vaughn Construction
11.2019 - Current
  • Texas State Hilltop Project 125M+ responsible for all aspects of data connectivity to jobsite
  • UT San Antonio State Hospital 350M+ Interior buildout of one of the six 3 story towers. Jobsite peaked at 600+ workers at one time. 480,000+sqft
  • San Antonio College Science Bldg. 16M ground up as lead superintendent alongside two Assistants and a project management staff. From piers to Substantial
  • San Antonio College Fletcher reno. 21M Oversaw all exterior work including a 15' deep excavation with a new structural steel bridge and amphitheater seating
  • Rec Fields Texas State 5M recreational finish out along side a project manager to include small buildings, two full size fields, and self sustained irrigation from local river
  • Developed strong relationships with subcontractors, fostering collaboration and smooth coordination of work efforts.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Maintained safety onsite and upheld all OSHA regulations by continuously auditing the project
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Maintained open lines of communication with clients to provide regular updates on project progress, address concerns promptly, and foster trusting relationships built on transparency and professionalism.
  • Facilitated conflict resolution between team members by mediating disputes and fostering open communication channels among the workforce.
  • Assisted in scheduling inspections for job sites and projects.
  • Communicated and documented expectations to subcontractors during weekly meetings.
  • Collaborated closely with architects and engineers to resolve design issues efficiently during project execution stages.
  • Delivered outstanding service to customers to maintain and extend relationships for future business opportunities.
  • Supervised staff by checking work against project expectations.
  • Conducted thorough site inspections to maintain quality control standards across all aspects of construction projects.
  • Remained aware of project costs and notified project team of anticipated exceptions to estimates.
  • Coordinated efforts between design, construction, and management teams effectively to ensure seamless transitions throughout project lifecycles from inception through completion while meeting or exceeding client expectations consistently along the way whenever possible as well.

Carpenter Foreman

Joeris General Contractor Ltd.
05.2015 - 11.2019
  • Utilized total station to mark building corners, and other civil landscaping as needed per drawing
  • participated in work pertaining to elevations using a builders level and rotary laser level
  • Worked in ground up. Remodels. Civil and interior finish out work.
  • Worked at University Hospital, Pleasanton ISD Bond, Southwest High
    School Bond and other bond projects.
  • Assisted in a diverse self performance activities such as but not limited to, tape and float, framing metal and wood, flooring installation, misc concrete, blocking all types, punch list, misc layout, etc.
  • Consistently assumed additional responsibilities and worked extended hours to meet project deadlines. Every year in the summer would work 2-3 months without a day off to meet project deadlines. Worked all saturdays year round
  • Observed all OSHA and corporate safety regulations and procedures to prevent mishaps and injuries on job sites.
  • Planned and executed work with proper tools and materials to maximize efficiency.
  • Kept team members safe and job sites free of hazards by
    maintaining good organizational skills at all stages
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
  • Effectively used all fasteners such as nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Read and interpreted blueprints and construction documents to determine project directives.
  • Properly poured, set and cured concrete.
  • Applied caulk, sealants and other agents to installed surfaces.
  • Evaluated each staff member's strengths and assigned tasks based upon expertise and background.
  • Operated equipment such as forklifts, skid steers, boom lifts, scissor lifts, etc. safely to efficiently complete
    site work.

Carpenter

Bartlette Cocke GC
07.2014 - 05.2015
  • worked in self perform demolition at woodlawn elementary 30+ days straight to meet project deadline
  • worked in self performance rebar and concrete install at multiple projects
  • utilized fork lifts, boom lifts, Skid steers, scissor lifts, etc all machinery as needed for jobsite completion
  • worked in falls city bond during installation of piers, rebar, forming,pouring, as well as elevations using rotary laser level
  • worked in multiple projects doing self perform blocking, everything from interior to roof
  • worked multiple jobs finishing concrete as needed for job completion

Carpenter

JSR GC
11.2013 - 07.2014
  • Did interior layout of my first building. 10,000 sq ft office space
  • Installed interior finish items, including wall protection, doors and hardware, toilet accessories, cubicle curtain tracks and TV brackets.
  • Assisted foreman with metal stud framing
  • Sheet rock installation
  • self perform demolition. interior from floor tile to ceiling tile
  • Proper use of electric power tools such as drills, skillsaw, sawzall, etc.
  • worked at Lackland and randolph air force base

Assistant Project Manager

JLG Structures
09.2011 - 11.2013
  • Assisted superintendents in projects such as USAA, Wal-Mart, and Lackland Dorm Construction
  • Worked under General Contractors such as KBR, Byrne, Joeris
  • assisted PM with budgets using phase codes for every project
  • assisted PM with change orders and ensured only contracted work was done
  • assisted in material take offs and scheduled delivery for needed project at hand
  • Attended production and operations contractors meetings which facilitated stronger communication and
    the ability to resolve critical issues
  • Prepared and followed through on all required punch lists
  • Ensured all JHA's,safety reports, daily reports etc. were signed and filed
  • Digitally archived weekly progress and technical knowledge base photographs of all assigned projects
  • Rebar installation
  • Concrete placement
  • Installation of concrete forms

Education

NCCER Jorneyman - Carpentry

NCCER Carpenter Journeyman At St. Phillips Southw.
San Antonio, TX
2019

Associates Drafting - Drafting And Design

ITT Technical Institute - Drafting And Design
San Antonio, TX
2015

Skills

  • Project Leadership
  • Fluent Bilingual read and write (Spanish)
  • Field Coordination
  • Staff Management
  • Change Orders Management
  • Work Planning and Prioritization
  • Teamwork and Collaboration
  • Conflict Mediation
  • Specification and standards compliance
  • Subcontractor Management
  • Schedule Management
  • Construction Scheduling

Timeline

Assistant Superintendant

Vaughn Construction
11.2019 - Current

Carpenter Foreman

Joeris General Contractor Ltd.
05.2015 - 11.2019

Carpenter

Bartlette Cocke GC
07.2014 - 05.2015

Carpenter

JSR GC
11.2013 - 07.2014

Assistant Project Manager

JLG Structures
09.2011 - 11.2013

NCCER Jorneyman - Carpentry

NCCER Carpenter Journeyman At St. Phillips Southw.

Associates Drafting - Drafting And Design

ITT Technical Institute - Drafting And Design
Gerardo Pacheco