loader
Pain
King furniture
Las Vegas, Nevada
02.2025 - Current
- Color matching drywall repair wall paiper Stucco repairs furniture restoration
- Completed day-to-day duties accurately and efficiently.
- Repaired cracks in drywall prior to painting or wallpapering rooms.
- Performed minor plaster repair, blending newly renovated wall surfaces with existing plaster.
- Cleaned up job sites after completion of projects.
- Inspected painted surfaces for defects such as cracking, blistering, or fading.
- Applied primers or sealers to prepare bare wood or metal for finish coats.
- Primed, smoothed and cleaned trim, walls and ceilings to prepare for painting tasks.
- Completed diverse repairs on commercial and residential buildings and equipment.
- Protected furniture from dust generated during the preparation of walls.
- Wore protective clothing such as masks, respirators and gloves.
- Sprayed prepared surfaces with specified amounts of primers and finish coatings.
- Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
- Ensured proper ventilation while using solvents or oil-based paints.
- Used ladders and scaffolds to reach high walls and ceilings.
- Removed pictures, door knobs or electric switch covers prior to painting.
- Performed minor repairs, such as caulking windowsills, before painting them.
- Removed old finishes by stripping, sanding or using water or abrasive blasting.
Painting Contractor
King Furniture
Las Vegas , Nevada
02.2025 - Current
- Report and repaint all areas associated casino floor pool area all over the property
- Applied primers and sealers to protect the surface from moisture damage.
- Inspected finished projects to ensure they met quality standards prior to client acceptance.
- Filled cracks, holes or joints using caulking guns or putty knives.
- Primed, smoothed and cleaned trim, walls and ceilings to prepare for painting tasks.
- Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
- Applied primers or sealers to prepare bare wood or metal for finish coats.
- Instructed laborers on proper safety procedures when using hazardous materials or working in confined spaces.
- Smoothed and finished surfaces on walls, trim and cabinetry.
- Maintained a clean work environment at all times while working onsite.
- Coordinated with other contractors when necessary in order to complete projects efficiently.
- Sprayed prepared surfaces with specified amounts of primers and finish coatings.
- Ensured that all workers were following OSHA regulations while onsite.
- Cleaned and smoothed surfaces prior to painting.
- Identified surface to be covered and characteristics of finish to properly select roller, power sprayer and right size brush.
High School Diploma -
Bachillerato
Mexico 10-2019
- Analytical and critical thinking
- Relationship building
- Friendly, positive attitude
Pain
King furniture
02.2025 - Current
Painting Contractor
King Furniture
02.2025 - Current
High School Diploma -
Bachillerato