German Jose Sanchez

Homestead,FL

Summary

Equipped with strong problem-solving abilities, willingness to learn, and excellent communication skills. Poised to contribute to team success and achieve positive results. Ready to tackle new challenges and advance organizational objectives with dedication and enthusiasm.

Overview

22
22
years of professional experience

Work History

Project Coordinator

MPG Pipeline Contractors
Houston, TX
01.2014 - 01.2015
  • Assisted Director of Safety in the transition of Safety material for the Spanish speaking field personnel to Spanish written manual, Orientation and comprehension Test.
  • Reviewed third party Orientation presentation for Quality Assurance and ensuring that proper Spanish was used for the region and terminology used in Employee Manual.
  • Attended multiple Pre-bid meetings in Texas, Louisiana, and Oklahoma for company to qualify to bid.
  • Acted as Field Supervisor of two projects De-Mobilizing in Rosenberg, TX and near Corpus Christi, TX.
  • Supervised Loading of Equipment and 30" pipe from Project Yard to New Projects in Louisiana and Houston TX.
  • Prepared to take New Mexico Fixed works licenses in the Month of February before relocating to Miami FL.

Certified Bridge Inspector

Marlin Engineering Inc.
Medley, FL
11.2015 - Current
  • Performed inspections of Ancillary structures for FDOT District 4 and FDOT District 6, Miami-Dade County, and other clients.
  • Inspected bridges of all types including Bascule Movable bridges for the FDOT.
  • Acted as Bridge inspector for a contract with Miami-Dade and inspected the full Metrorail system.
  • Assisted the team in the inspection of the Metromover system in Downtown Miami.
  • Bridge inspector responsible for inspections of Ancillary Structures, Local Government Bridges, State Bridges, and Movable Bridges.
  • Project manager responsible for development of traffic control plans for full closure of State roads in FDOT District 4 for the rehabilitation of railroad crossings with FEC and CSX railways.
  • In the last 8 years have done between ten to sixteen crossings yearly.
  • Coordination with governmental agencies and general public was critical to minimize the impact to traffic.
  • Participated as team member of yearly work plan visits from central office and special projects like quiet zones along railway corridor suggesting roadway modifications to provide the safest railroad crossings possible.
  • Reviewed the contractor's invoice and submitted a final report to FDOT D4.
  • Implemented QA of nightly set-up in order to minimize impact to traffic at time of closure.
  • Represented company at all meetings with FDOT District 4 OMD quite familiar and comfortable with marketing visits and would personally deliver reports to PM.

Project Engineer

Miami-Dade County
01.2004 - 01.2012
  • Designing seven mile shared use path built on top of Army Corps of Engineers levee.
  • Coordinated the permitting process and represented the company's design team at meetings with the County Parks agency.
  • Performed detailed site survey ensuring that parameters set by permitting agency were met in design.
  • Represented the design team and coordinated with the planning department within the company that acted as the point of contact with the project manager from the County Parks agency and other governmental agencies.

Miami-Dade County
01.2011 - 01.2012
  • Assisted contractor by answering any questions or issues that were encountered during redesign of contract plans.
  • Represented Company in meetings with contractor and FDOT.
  • Provided plans and boards to public information officer for public meetings and meetings with County advisory boards.
  • Attended meetings with local agencies and business owners during public meetings to answer any questions regarding the benefits of the project.
  • Assisted contractor to expedite review by FDOT and other local governmental agencies of redesign plans by contractor.
  • Personally would visit FDOT and County to ensure that approval of plans would be done quickly.
  • Construction begin in June 2012.

Miami-Dade County
01.2011 - 01.2012
  • Responsible for maintenance of traffic for the reconstruction of two lane undivided major rural arterial and converting it to four lane divided roadway from North of SW 8th Street to South of SW 88th Street (Kendall Drive).
  • Quality control of roadway plans and full implementation of review comments.
  • Assisted Project Engineer during meetings with business owners along corridor including Miccosukee Casino.
  • Performed peer review for quantities in computation book and transport website by FDOT.

Education

Bachelor of Science - Civil Engineering

Florida International University
Miami, FL
11.2010

Associate of Arts - Civil Engineering

Miami Dade College
Miami, FL
06.1998

Skills

Microstation - CADD software roadway design
AutoCAD – CADD software for land development
Geopak - Geometric Design both horizontal and vertical
Auto Turn - Design Vehicle turning movements
Guide sign - Specialty sign design able to customize software
Transport - Cost estimating input system developed by FDOT
ERC – Electronic Review comments system developed by FDOT
Aladan - Roadway lighting design developed by GE
Designed flexible pavement using FDOT pavement design manual
Microsoft Suite Word, Excel, and PowerPoint
Pulled design tickets Sunshine State One Call - underground utilities verification program
Bilingual speaker and Writer (English and Spanish)

Timeline

Certified Bridge Inspector

Marlin Engineering Inc.
11.2015 - Current

Project Coordinator

MPG Pipeline Contractors
01.2014 - 01.2015

01.2011 - 01.2012

01.2011 - 01.2012

Project Engineer

01.2004 - 01.2012

Bachelor of Science - Civil Engineering

Florida International University

Associate of Arts - Civil Engineering

Miami Dade College
German Jose Sanchez