GaN Nitride Tool Gap Closure. 2022 - 2023
Texas Instruments
- Discovered non-standard tool set up and lack of misprocess detection for the GaN vertical furnaces.
- Installed and qualified a sister tool to give the process line more bandwidth and move a way from a single path line.
- Created and set up Preventive Maintenance procedures and scheduling as well as spare parts and consumables list.
- Using both process and equipment knowledge, analyzed the process recipes to determine the appropriate abort sequence, for any tool malfunction, to save any material processing in the tool.
- Worked with product engineers
Dallas Gatorade Roofing Upgrades. 2024-Current
PepsiCo
- Point of contact between the site, corporate, and contractors for side wide roofing upgrades. Kept open communication to address the needs of all parties to maintain the project timelines.
- Completed roofing upgrade for the Glenfield Warehouse and Production Line 3 which has provided safer walking surface for HVAC and roof services and eliminated water leaks from rain.
- Project included painting of ceiling bar joists to address quality findings and align the plant with AIB audit standards.
Dallas Gatorade Case Coder Upgrades. 2024-Current
- Phased site wide upgrades of case coders due to obsolescence and non-standardization resulting in cost savings through increased productivity.
- Completed upgrades to 2 lines and have seen savings of $50,000