- Supported MMR Contractors electricians in conduit installation and wire pulls to ensure timely project completion.
- Installed outlets, switches, fixtures, and panel components.
- Installed outlets, switches, fixtures, and panel components according to electrical codes and project specifications.
Assisted MMR Contractors electricians with conduit installation and wire pulls.
- Read blueprints and followed electrical layouts , prepared lvp and lbt for installation on pads
- Pulled wires through conduit runs using fish tapes or pull strings.
- Worked in a team-based environment to accomplish projects.
- Handled various materials including PVC conduits, copper wiring, aluminum wiring, and MC cables to meet project requirements.
- Ran cable trays for power distribution from main panels to branch circuits.
- Dug trenches and created holes to pull conduit and install supports.
- Adhered to company standards and OSHA regulations for worksite safety.
- Worked in team-based environment to accomplish projects.
- Applied lockout procedures and site safety rules at MMR Contractors jobsites.
- Kept work areas clean, neat, and free of hazards.
- Assisted installing high value equipment like Gpc including its components, lvt , lvp ,rts , ups systems.
- + Edit or add your own