Summary
Overview
Work History
Education
Skills
Timeline
Generic

Glenn Francis Quintans

Granada Hills,CA

Summary

Results-driven Controls Engineer II at ASC Process Systems with expertise in PLC programming and project management. Successfully managed over $10 million in projects, enhancing automation for composite-curing equipment. Skilled in system troubleshooting and document interpretation, delivering high-quality solutions while training clients on operational excellence. Committed to continuous improvement and safety validation.

Determined Controls Engineer with sound knowledge of quality assurance procedures, strategic planning and specification review. Analytical problem-solver with strengths in communication and organization. Comfortable working for long periods of time with little to no supervision.

Overview

4
4
years of professional experience

Work History

Controls Engineer II

ASC Process Systems
09.2021 - 04.2025
  • Design PLC programs to automate composite-curing equipment including autoclaves, ovens, and bond controllers.
  • Create and execute detailed testing plans to validate equipment functionality and safety to ensure high quality products
  • Interpret and redline piping and instrumentation diagrams and electrical schematics
  • Performed equipment tuning on pressure, heating, and vacuum control including proportional valves and variable frequency drives.
  • Performed calibration of equipment components including transducers and thermocouples
  • Provided remote technical support and troubleshooting for commissioned systems to correct system design flaws and malfunctions.
  • Created work articles to improve testing procedures and design configurations.
  • Trained customers on equipment functionality, maintenance procedures, and software operations.
  • Ensure all quoted deliverables are completed in a timely and cost-efficient matter
  • Managed and commissioned over $10 million in various projects, from built-in shop autoclaves, or controls upgrades.
  • Maintain project documentation to include testing procedure, drawing redlines, change orders, and equipment validation

Physics Project Assistant

CSUF Physics Department
01.2021 - 05.2021
  • Handled administrative duties, filing, and errands.
  • Researched and analyzed data to support project-related decisions.
  • Provided assistance with preparation of project-related reports, manuscripts and presentations

Education

Bachelor of Science - Electrical Engineering

California State University, Fullerton
Fullerton, CA
05-2021

Skills

  • Hydraulic systems
  • Coding
  • Product development
  • Equipment acquisition
  • Control systems management
  • Project management
  • System troubleshooting
  • Pneumatic systems
  • PLC programming
  • Auditing and assessments
  • Document interpretation
  • Implementation

Timeline

Controls Engineer II

ASC Process Systems
09.2021 - 04.2025

Physics Project Assistant

CSUF Physics Department
01.2021 - 05.2021

Bachelor of Science - Electrical Engineering

California State University, Fullerton
Glenn Francis Quintans