Summary
Overview
Work History
Education
Skills
Accomplishments
Certification
Interests
Timeline
Generic
GLENN J. BELTRAN

GLENN J. BELTRAN

Architectural Coordinator
Doha,Qatar

Summary

21 Years solid experienced Architectural Constructions Designs, Interior Designs, Engineering principles, structural coordination and proficient in AutoCAD detailing

Overview

23
23
years of professional experience
6
6
years of post-secondary education
6
6
Certifications
1
1
Language

Work History

Civil / Architectural Engineer

TAISEI CORPORATION
Doha, Qatar
06.2019 - Current
  • Project: Passenger Terminal Expansion Works – Central Concourse Building and Early Works – (HIAEP-0013) Project Location: Doha Qatar
  • Designing, analyzing, and altering plans, prototypes, or structures
  • Ensuring building plans, prototypes, and structures are operating safely, efficiently, and reliably
  • Assisting team members with project objectives, budgets, and timelines
  • Establishing project goals
  • Identifying and solving problems in building plans, prototypes, and structures
  • Ensuring building systems are functional, reliable, and safe
  • Participating in site visits
  • Testing and evaluating building systems to find problems and improvements
  • Reading, interpreting, and explaining complex technical as built plans documents
  • Consulting with project manager and interphase department head and members on building projects.
  • Coached newly hired employees and interns while observing progress and delegating tasks.
  • Provided leadership services to architectural clients while supporting all design development phases.
  • Adhered to timelines to meet quality assurance targets.
  • Identified and resolved potential structural issues.
  • Produced precise technical specifications and data sheets.
  • Visited project sites during construction to monitor progress and consult with contractors and on-site engineers.
  • Drafted and reviewed construction schedules, environmental impact studies and project designs.

Design Coordinator

OBAYASHI, HBK JOINT VENTURE
Doha, Qatar
08.2013 - 05.2020
  • Project: Msheirib Phase 3 Properties Down town Doha Location: Doha Qatar
  • Interact on project standard coordination with on-site team and ensures to address any Design issues
  • Prepares Shop Drawings and coordinates to sub-con
  • Prepares RFI for any design issue
  • Prepares specification, interior design details, schedule drawing target completions and Technical reports
  • Perform assign modification drawing as per the advised and evaluations of consultants.
  • Appointed design consultants and encouraged performance pursuant to deed and scope of service.
  • Chaired design team meetings and issued action items.

Architectural Designer

MOHAMMED ANNAIM, ARCHITECTS
Riyadh, Kingdom of Saudi Arabia
09.2011 - 08.2013
  • Project: University and Sports Club Location: K.S.A Kingdom of Saudi Arabia
  • Architectural and Interior Design drawing and details
  • Final documentation drawings
  • Preparation of detailed Auto Cad lay-out by request.
  • Consulted with clients to determine functional and spatial requirements of new structure.
  • Incorporated sustainable designs into commercial projects.
  • Evaluated project requirements to identify and mitigate risks.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Completed comprehensive code compliance evaluations to scrutinize projects against established architectural criteria.
  • Communicated with vendors and contractors to incorporate input into project designs.
  • Attended team meetings to resolve technical and project issues and review project schedules.
  • Coordinated with cross-functional teams to improve structure sustainability and design.
  • Reviewed contractor proposals to determine favorable partnerships for on-time and under-budget project completion.

Design Coordinator

JTMJV, OBAYASHI
Dubai, UAE
07.2008 - 02.2011
  • KAJIMA, YAPI-MERKEZI Obayashi Corp

Projects: Dubai Metro Train (From Red Line to present at Green Line-Shop Drawing and Coordination Section (UGS) Dubai Rapid Link Consortium-Architectural Design (DURL) Palm Deira Office Locations: Dubai U.A.E General Coordination

  • Numbers among the world’s leading general contractors and among top five in Japan, Prepared a drawings and as-built plan
  • Coordinates shop drawing team for the control of design and documents
  • Prepare as built as drawing depend on site condition
  • Manages the production of design information to meet the project programmed
  • Coordinates technical interfaces between all subcontractors regarding to shop drawing
  • Perform assign modification drawing if any comments from the consultant reviewed site
  • Conduct visit to the site station in order to coordinates project updates
  • Monitors the detailed schedule of design work and performs follow-up audits
  • Coordinated a canvass / estimated cost of materials and design drawings
  • Supervised and performed some carpentry works
  • Performs other duties as maybe assigned from time to time.
  • Spearheaded design process to align with client specifications and budget.
  • Appointed design consultants and encouraged performance pursuant to deed and scope of service.
  • Researched design trends, technology and processes and directed work of design team .
  • Produced designs that met statutory and regulatory approvals and recorded tracking logs using Autocad.
  • Partnered with senior leaders to drive change by evaluating methodologies, tools and templates at enterprise level.
  • Devised strategic approaches for highlighting important focal points in each design.
  • Collaborated on designs to account for specific factors outlined in shop drawing.
  • Factored concerns such as traffic flow patterns, location limitations and safety issues into every design.
  • Organized and attended meetings to discuss project status and brief new projects.

AutoCAD Designer

SHIMIZU CORPORATION
Dubai, UAE
05.2008 - 07.2008
  • SHIMIZU is leading Architectural, Engineering and General Contracting Firm
  • Projects: Palm Island Locations: Jumeira Dubai U.A.E
  • Prepare as built as drawing for interior of apartment of palm design
  • Perform assign modification drawing by design manager.
  • Produced designs that met statutory and regulatory approvals and recorded tracking logs using Autocad
  • Researched design trends, technology and processes and directed work of design team.

Project Coordinator - Commercial Construction

TRIPLE N CONSTRUCTION DESIGN And MANAGEMENT
Corner Orense, Guadalupe, Makati, Philippines
03.2007 - 04.2008
  • Angelo & Don Henricos - Locations: Mall of Asia Philippines General Coordination
  • Architectural and Interior Design drawing and details
  • Prepare schedules, work drawings, suggests and design alternative details
  • Planning and designed requested from different projects
  • Preparation of specifications, schedules and technical reports
  • Takes part in internal work meetings with procurement and construction team
  • Purchasing
  • Coordinates subcontracted design engineering and checker offices
  • Cost estimations effective to be present for discussion with project engineer and consultant a actual cost materials analysis through different suppliers to be use in Different projects
  • Coordinates a construction drawings and methods, for subcontractors and suppliers
  • Site
  • Supervise Manpower 40-50 constructions workers
  • Keeps an up-to-date library of standards and regulations applicable to the Contract., and Responsibilities:
  • Design an as-built plan lay out for Building and Typical dwelling unit
  • Conduct cost estimation and canvassing of materials to be used
  • Inspections of on- site different projects coordinated with project engineer
  • Prepared specifications and schedules of technical reports
  • Designed plan by request of different projects.
  • Coordinated project activities with vendors and suppliers and maintained relationships.
  • Created quality management plan, developed and maintained project documentation and oversaw project design.
  • Managed resource estimates, project timeline, project milestones, task dependencies and critical path.
  • Negotiated terms and conditions for customer contracts.
  • Verified quality of deliverables and conformance to specifications before submitting to clients.
  • Sourced, vetted and managed vendors needed to accomplish project goals.
  • Monitored project progress, identified risks and took corrective action as needed.

Engineering Assistant / AutoCAD Operator / Draftsman

METRO MANILA DEVELOPMENT AUTHORITY Philippines
Manila
05.2002 - 03.2007
  • Oversaw project schedule and determined critical deadlines and task assignments.
  • Completed mathematical calculations to properly assess research and testing results.
  • Created CAD models and drawings for construction building designs.
  • Interpreted blueprints and technical drawings to analyze upcoming projects.
  • Maintained ongoing communication with project stakeholders through regular status updates.
  • Used software to create project designs in accordance with engineering standards.
  • Drafted assemblies, models, and other technical drawings.
  • Organized and edited technical instructions for use in training and customer manuals.
  • Communicated with clients regarding project report status and delivery schedule.

Draftsman / AutoCAD Operator

DEPARTMENT of PUBLIC WORKS and HIGHWAY
Manila, Philippines
12.2001 - 05.2002
  • Prepared design, lay-out plan, as-built plan, and detailed plan
  • Inspections of on-site on-going different projects
  • Supervised constructions / repair / renovation of different projects under Engineering Division.
  • Used computer-aided design software to prepare blueprints and schematics.
  • Consulted with project managers, design consultants and sub-contractors to produce and alter drawings.
  • Created CAD models and drawings for 2D designs.
  • Modified designs to correct operating deficiencies and reduce production problems.
  • Interpreted technical drawings, schematics and computer-generated reports to make revisions to CAD drawings.
  • Reviewed specifications to generate complex details of individual system components.

Project Site Coordinator / Draftsman

ENGINEERING EQUIPMENT INCORPORATED, E.E
Malate Manila
12.2000 - 12.2001
  • Identified community resources and networked with local officials to coordinate.
  • Generated reports to inform stakeholders and management of financial and production statuses for design projects.
  • Aided in submission of RFP pricing agreements.
  • Accurately documented all onsite issue using design.
  • Created detailed timelines and budgets for events to meet all deadlines.
  • Fulfilled contractual obligations for rehearsal and day of event coordination.

Education

Bachelor of Science - Architecture

UNIVERSITY OF THE EAST COLLEGE OF ARCHITECTURE
PHILIPPINES
01.1996 - 04.2002

Skills

Meeting planning

undefined

Accomplishments

  • This is to certify that the statements above mentioned are true and correct to the best of my knowledge and ability
  • 4

Certification

Autodesk Autocad Architecture

Interests

Design Coordination management

Timeline

Civil / Architectural Engineer

TAISEI CORPORATION
06.2019 - Current

Design Coordinator

OBAYASHI, HBK JOINT VENTURE
08.2013 - 05.2020

Architectural Designer

MOHAMMED ANNAIM, ARCHITECTS
09.2011 - 08.2013

Design Coordinator

JTMJV, OBAYASHI
07.2008 - 02.2011

AutoCAD Designer

SHIMIZU CORPORATION
05.2008 - 07.2008

Project Coordinator - Commercial Construction

TRIPLE N CONSTRUCTION DESIGN And MANAGEMENT
03.2007 - 04.2008

Engineering Assistant / AutoCAD Operator / Draftsman

METRO MANILA DEVELOPMENT AUTHORITY Philippines
05.2002 - 03.2007

Draftsman / AutoCAD Operator

DEPARTMENT of PUBLIC WORKS and HIGHWAY
12.2001 - 05.2002

Project Site Coordinator / Draftsman

ENGINEERING EQUIPMENT INCORPORATED, E.E
12.2000 - 12.2001

Bachelor of Science - Architecture

UNIVERSITY OF THE EAST COLLEGE OF ARCHITECTURE
01.1996 - 04.2002
GLENN J. BELTRANArchitectural Coordinator