Senior Superintendent / Deputy Construction Manager with 37 years of construction experience, including 26 years leading field operations across major heavy civil, transportation, transit, commercial site development, and residential plat development projects. Proven success managing multiple simultaneous active projects, supervising crews of 6 superintendents and over 50+ personnel. Duties included coordination and scheduling of all project subcontractors on complex public and private projects. Extensive experience delivering profitable projects including, negotiated, design bid build, CM/GC and design build. Scopes ranged from mass grading, private plat, major highways, and high-rise excavations from start up through final completion. Proven record for building strong owner and subcontractor relationships directly resulting in repeated private clients, on time on budget profitable projects. Understands the importance of detailed planning, utilizing accurate schedules as a tool to keep the projects on track. Greg focuses on exceeding budget through production leadership, high safety standards, solving challenges quickly and the importance of quality eliminating costly re-work under demanding conditions.
Heavy Civil Construction
Transportation / Public Infrastructure
SR 167 Corridor Improvements (WSDOT) – $87M DB
Deputy Construction Manager
Owner: Washington State Department of Transportation
Contractor: Harbor Pacific Contractors
20-mile corridor infrastructure improvement project
36 full span steel bridges
66 drilled foundations
400+ overhead, bridge-mounted, barrier-mounted, and roadway signs
Electrical and Fiber Optic infrastructure
Paving, and striping
Road Construction and widening
Met all major milestones
Zero lost-time accidents
Canyon Road Corridor Improvements (3 Phase)
Owner: Pierce County Public Works
Construction Manager
Phase 1 – $16M | Contractor: SCI Infrastructure
Phase 2 – $6M | Contractor: SCI Infrastructure
Phase 3 – $5.3M | Contractor: Northwest Construction
Multi-phase corridor widening and roadway improvements
Utility installation, grading, paving, new intersection improvements and roadway infrastructure
Managed active traffic sequencing and civil production over multiple phases
112th Street East – Pierce County – $4.8M
Owner: Pierce County Public Works
Contractor: Northwest Construction
Roadway widening and utility corridor improvements
Transit / Urban Infrastructure
Sound Transit U250 – University of Washington Station – $7.4M CM/GC
GC: Hoffman Construction Company
Demolition, utilities, paving, and infrastructure support for major transit construction
Sound Transit U240 – Capitol Hill Station – $6.3M
GC: Turner Construction
Civil support work for transit station construction
Utility coordination, paving, and civil sequencing in dense urban environment
Residential Plat / Site Development Private
Pacific Village Construction – $9.7M
Owner: Pahlisch Homes
Contractor: Northwest Construction
Lund Meadows – $9.3M
Owner: MainVue Homes
Contractor: Northwest Construction
Westridge Development (Multi-Phase Combined) – $12.9M
Owner: Issaquah Highlands LLC
Contractor: Northwest Construction
Oversaw full civil site development from initial earthwork through final completion, including:
· Mass grading / Lot construction
· Structural concrete
· 3-tier rockery wall systems
· Structural retaining walls
· Wet utility installation
· Dry utility coordination
· Curb, gutter, and sidewalks
· Paving operations
· Fine grading
Managed multi-phase sequencing, inspections, utility coordination, subcontractors, and production across active development phases.
Commercial / Mixed Development Experience
IKEA Renton Retail Site Relocation – $7.6M – Deacon Construction
Lee Johnson North Creek Warehouse - 7.1M – Foushee and Associates
Airlines Copper River – 4M -Howard S Wright