Summary
Overview
Work History
Education
Skills
Timeline
Generic

GREGORY LUGO

Bullard,TX

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

20
20
years of professional experience

Work History

Firefighter

Bullard VFD
01.2023 - Current
  • Responded to emergency medical calls to perform lifesaving procedures and other emergency medical services.
  • Drove and operated structural pumpers, tankers, ladders, and service vehicles to aid in rescue operations.
  • Operated fire hoses, hydrants and extinguishers to eliminate fire and prevent from spreading.
  • Collaborated with other emergency responders on scene to establish adequate fire suppression.
  • Documented emergency calls and equipment maintenance to enable tracking history and maintain accurate records.
  • Educated public and community members on fire safety and prevention methods to provide life-saving techniques.
  • Participated in community outreach programs to raise awareness of fire prevention and safety measures.
  • Oversaw equipment and vehicle upkeep to maintain emergency readiness.
  • Trained new firefighters to comply with safety protocols and equipment usage.
  • Evaluated situation at emergency sites to determine and execute most effective methods for saving life and property.
  • Initiated first aid measures to alleviate further injury and prepared victims for transport to medical facilities.
  • Operated hoses, pumps, ladders and other firefighting equipment.
  • Responded to emergency calls and provided medical assistance to injured individuals.
  • Assisted with regular maintenance of firefighting equipment.
  • Inspected apparatus, equipment, grounds, and stations for proper order and condition.
  • Prepared incident reports detailing personnel, location and results of each call.

Superintendent

Longview Bridge & Road
07.2023 - 10.2023
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Maintained safety onsite and upheld all OSHA regulations.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Scheduled and supervised maintenance and repair of equipment and grounds.

Operator

State Of Texas TxDot
02.2023 - 07.2023
  • Maintained knowledge of industry policies and procedures to set up and operate equipment safely.
  • Performed inspections and routine maintenance on equipment.
  • Provided on-the-job training to newly hired workers and team members.
  • Set up machines to start production cycles and controlled machine settings.
  • Performed quality assurance tasks to promote accuracy and minimize mistakes.
  • Operated technical and mechanical equipment and adjusted machine settings according to work cycles.
  • Conducted inspection of in-process or finished product.
  • Worked outside in all weather conditions.
  • Performed equipment tests, calibrations and repairs to keep machines running smoothly and prevent malfunctions.

Project Manager/Project Estimator

Mckenzie Cascade Heavy Excavation
10.2020 - 11.2022
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Planned, designed, and scheduled phases for large projects.
  • Provided detailed project status updates to stakeholders and executive management.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Identified plans and resources required to meet project goals and objectives.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
  • Negotiated and managed third-party contracts related to project deliverables.
  • Managed projects from procurement to commission.
  • Drafted project reports to identify successful outcomes, insights and future recommendations.

Project Manager

Alex Hodge Construction
04.2020 - 10.2020
  • Planned, designed, and scheduled phases for large projects.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Provided detailed project status updates to stakeholders and executive management.
  • Identified plans and resources required to meet project goals and objectives.
  • Developed and initiated projects, managed costs, and monitored performance.

Project Engineer

K&E Excavating
04.2019 - 04.2020
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Identified technical risks within managed projects.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Assisted with cost proposal development and customer presentations.
  • Evaluated change order requests in response to out-of-scope work activities.
  • Delivered concise instructions to technical team to maintain quality control.

Project Manager

Alex Hodge Construction
10.2018 - 04.2019
  • Planned, designed, and scheduled phases for large projects.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Coordinated with cross-functional teams to resolve project issues and mitigate risks.
  • Achieved project deadlines by coordinating with contractors to manage performance.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Provided detailed project status updates to stakeholders and executive management.
  • Identified plans and resources required to meet project goals and objectives.
  • Developed and initiated projects, managed costs, and monitored performance.
  • Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.

Superintendent

Kana Pipeline
02.2017 - 07.2018
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Established successful procedures for day-to-day operations and long-term planning.
  • Managed complete construction process to maximize quality, cost-controls and efficiency.
  • Maintained safety onsite and upheld all OSHA regulations.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Scheduled and supervised maintenance and repair of equipment and grounds.

Operations Chief

Fairview Valley Fire
10.2003 - 07.2018
  • Built strategic relationships with federal, state and local Fire agencies.
  • Made decisions with broad and positive impact on security management operations.
  • Managed financial, operational and human resources to optimize performance.
  • Oversee field operations and operations of personnel on fire incidents.

Superintendent/Junior Estimator

MKP Construction
01.2012 - 02.2017
  • Reviewed project plans and specifications to understand project requirements and accurately estimate cost and resources needed.
  • Participated in pre-bid meetings and site visits to understand project scope and identify potential issues or challenges.
  • Used specialized software to create estimates quickly and accurately and make estimates easily understandable and shareable.
  • Negotiated prices and terms with suppliers and vendors to secure best prices for materials and services.
  • Gathered cost and material data for accurate and up-to-date information on material and labor costs.
  • Identified areas for cost saving to help increase profitability and lower client costs.

Education

GED -

Yucaipa Adult School
Yucaipa, CA
02.2002

Skills

  • Strategic Planning
  • Project Management
  • Business Planning
  • Quality Assurance
  • Program Implementation
  • Policy Development
  • Contractor Management
  • Contract Management
  • Continuous Improvement
  • Project Coordination
  • Quality Standards
  • Construction Management
  • Recruitment and Hiring
  • Commercial Construction
  • Staff Management

Timeline

Superintendent

Longview Bridge & Road
07.2023 - 10.2023

Operator

State Of Texas TxDot
02.2023 - 07.2023

Firefighter

Bullard VFD
01.2023 - Current

Project Manager/Project Estimator

Mckenzie Cascade Heavy Excavation
10.2020 - 11.2022

Project Manager

Alex Hodge Construction
04.2020 - 10.2020

Project Engineer

K&E Excavating
04.2019 - 04.2020

Project Manager

Alex Hodge Construction
10.2018 - 04.2019

Superintendent

Kana Pipeline
02.2017 - 07.2018

Superintendent/Junior Estimator

MKP Construction
01.2012 - 02.2017

Operations Chief

Fairview Valley Fire
10.2003 - 07.2018

GED -

Yucaipa Adult School
GREGORY LUGO