Dynamic General Foreman with extensive experience at The Walsh Group, excelling in large-scale transit projects. Proven track record in managing complex signal system modernizations and ensuring safety compliance. Skilled in project budgeting and team leadership, with certifications in OSHA and MTA NYC Transit Track Safety, driving operational excellence and collaboration.
Overview
22
22
years of professional experience
Work History
General Foreman & Assistant Superintendent
The Walsh Group
07.2021 - Current
C-34838 - NYCT 207th St. Train Yard – Signal, Track, Switch, Portal and Power Work [$390M]
Managed the comprehensive signal system modernization project at the 207th Street Yard, overseeing the design, furnishing, installation, testing, and placement into service of all signal equipment.
Directed the rehabilitation of existing facilities and the construction of new facilities, including Relay Rooms, Train Control Rooms, and Communications Based Train Control (CBTC) Rooms.
Supervised the restoration and upgrade of track infrastructure along the IND 8th Avenue Line, ensuring compliance with safety and operational standards.
Managed the installation of a new, state-of-the-art Solid-State Interlocking (SSI) system, designed to meet current MTA NYCT Standards and fully compatible with Communications Based Train Control (CBTC) and Automatic Train Supervision (ATS) systems.
Coordinated the replacement of damaged track components and switchgear at designated locations, ensuring minimal disruption to service.
Supervised the construction of structural foundations, utilizing minipiles and drilled shafts, to support new structures.
Oversaw the construction of two new buildings to house critical system components, crew facilities, and the yard's main control room.
Directed the furnishing and installation of flood mitigation and resiliency structures and measures, including steel and concrete walls, flood gates, and drainage improvements.
Managed the replacement of track feeder cables, transposition cables, and associated appurtenances.
Worked collaboratively with the Project Management team to develop, maintain, and update the Critical Path Method (CPM) schedule, the 6-Week Look-Ahead schedule, and detailed daily work schedules.
Liaised directly with NYCT Inspectors and Train Service Supervisors (TSS) to coordinate all work activities, including flagging, General Order procedures, and service diversions.
Actively participated in project budget management and cost control, meticulously tracking progress, identifying potential cost overruns, and implementing necessary financial adjustments to achieve company financial goals.
General Foreman & Assistant Superintendent
Schiavone, Co. LLC Dragados USA
02.2018 - 07.2021
CM007 - Grand Central Terminal Station Caverns and Track for the East Side Access Project - $100M
Led and managed crews in the construction of complex concrete structures for the Grand Central Terminal (GCT) station caverns, employing both precast and cast-in-place concrete techniques.
Directed and oversaw the complete installation process of elevators and escalators within the GCT station caverns, ensuring functionality and safety compliance.
Managed rock excavation activities for the installation of elevators in the 45th Street Cross Passageway, ensuring safe and efficient removal.
Supervised all aspects of track work throughout the tunnel system, ensuring alignment, stability, and adherence to specifications.
Managed and directed the rerouting of all street-level utility work (e.g., electrical, gas, water), ensuring minimal disruption and proper coordination with relevant stakeholders.
Implemented strict control measures over material procurement and usage, as well as contractor man-hours, to maintain projects within established budgetary limits.
Conducted thorough evaluations of team member skills and backgrounds, strategically assigning tasks to maximize efficiency and individual contributions.
Proactively coordinated the timely delivery and flow of all necessary materials to prevent delays and maintain optimal productivity levels.
Collaborated closely with project leadership to analyze project specifications, identify critical paths, and implement strategic plans to achieve project goals effectively.
General Foreman & Assistant Superintendent
Schiavone, Co. LLC Dragados USA
11.2015 - 01.2018
MTACC Harold Structures CH057A- $122.3M
Managed and directed environmental abatement projects, ensuring compliance with regulations for the testing, sampling, removal, and disposal of contaminated (non-hazardous) and potentially hazardous materials.
Oversaw and coordinated all dewatering activities critical to supporting diverse construction operations.
Directed and supervised soil excavation activities, including the efficient removal and transportation of both standard and contaminated (non-hazardous) excavated materials.
Managed the installation of temporary excavation support systems, including soldier pile and lagging, as well as secant pile installations, ensuring stability and safety.
Coordinated the installation and modification of required water, sewer, and other utility systems, both temporary for construction support and permanent installations.
Supervised the precise installation of instrumentation used for continuous monitoring of excavations and adjacent existing structures to ensure structural integrity.
Led the construction of the jacked shield tunnel, including all associated approaches and related earthwork for the Westbound Bypass project.
Managed the installation of direct fixation track and third rail systems within the newly constructed Westbound Bypass structure.
Supervised the construction of ballasted track in designated areas according to project specifications.
Directed the construction of the critical pump room and its associated electrical room, including the installation of emergency generators and related equipment for the Westbound Bypass.
Supervised the construction of robust foundations and the erection of steel structures designed to support catenary systems and signals.
Managed the safe and efficient demolition of existing catenary structures and signal power support structures, including necessary environmental abatement and partial foundation removal.
Served as the primary point of contact for direct coordination with MTA Inspectors, LIRR’s Railway Worker in Charge (RWIC), and Amtrak Foremen, proactively addressing flagging, Communications & Signals (C&S), Electrical Traction (ET), substation, and other critical support requirements.
Conducted thorough Job Safety Analyses (JSAs) on a daily basis, identifying potential hazards and implementing effective risk mitigation strategies for all workers and visitors on job sites.
Efficiently ordered and managed the procurement of all necessary supplies and materials required for the installation of new infrastructure and the remodeling of existing systems.
Proactively planned and scheduled diverse work activities, meticulously integrating appropriate safety measures and protocols.
Accurately prepared daily timecards for crew members and provided essential assistance in the preparation of project estimates and detailed scope of work statements.
Foreman
Schiavone, Co. LLC Dragados USA
11.2009 - 02.2013
MTA-Capital Construction Contract CQ039 Northern Boulevard Crossing- $84.95 M
Led and managed crews in the construction of a concrete-lined tunnel beneath NBX, applying the Sequential Excavation Method in challenging soft ground.
Directed all aspects of underpinning the elevated subway structure, ensuring structural integrity and safety.
Managed the excavation of a complex tunnel access shaft, utilizing internal concrete diaphragm slabs and steel pipe struts for stability.
Provided crucial assistance in the installation and monitoring of horizontal freeze pipes to stabilize the ground for excavation.
Implemented and rigorously managed a comprehensive ground settlement control system, involving the use of soil extraction pipes, heat pipes, and compensation grout pipes to mitigate ground movement.
Directed and oversaw soil improvement initiatives through the application of void grouting techniques to enhance ground stability.
Coordinated both mechanical and chemical rock excavation procedures as required by the project.
Effectively managed dewatering systems to ensure a dry and safe working environment within the tunnel and shaft.
Execution of the NATM for the excavation of the soft ground tunnel.
Oversaw the precise placement of a shotcrete liner, reinforced with lattice girders, to provide initial and critical tunnel support.
Coordinated and provided essential support for all outside tunnel operations, ensuring seamless integration with underground activities.
Assisted subcontractors in the application of waterproofing systems to the tunnel lining to prevent water ingress.
Local 731 Laborer
Schiavone, Co. LLC Dragados USA
07.2003 - 11.2009
538C DEP Contract for the completion of Manhattan Spur of Water Tunnel #3- $692 M
Collaborated effectively with subcontractors on-site, providing necessary support for efficient workflow.
Supported skilled tradespeople (electricians, plumbers, etc.) by providing assistance with tools, materials, and task execution.
Prepared construction sites for work, including clearing debris, leveling ground, and ensuring accessibility.
Contributed to concrete projects through tasks such as formwork setup, pouring, and finishing according to specifications.
Operated hand and power tools to excavate soil for foundations, utilities, and other construction purposes.
Safely and efficiently demolished concrete structures using hand tools and power equipment.
Participated in concrete placement, ensuring proper mixing, pouring, and consolidation for structural integrity.
Executed rigging procedures using heavy picks to safely lift and move materials with cranes, adhering to all safety regulations.
Assisted in the installation and maintenance of underground utilities, including electric and water mains.
Worked safely and effectively with and around various construction machinery, including Excavators, Payloaders, and Cranes.
Consistently maintained a clean and organized work area, adhering to site safety regulations to prevent accidents.
Demonstrated a strong commitment to safety by promptly identifying and reporting potential hazards to supervisory personnel.
Performed diverse physical labor tasks, including manual excavation of trenches, backfilling operations, and the setup of temporary scaffolding and supports.
Efficiently loaded, unloaded, and transported a variety of construction materials using hand trucks, forklifts, and other equipment.
Skills
Certifications:
MTA NYC Transit Track Safety Certification Expires: 6/25
OSHA 30-Hour Construction Safety and Health Issued: 12/15/23
FDNY Certification for Torch Use of Flammable Gases Expires: 10/8/27
FDNY Certification Fire Guard for Torch Operations Expires: 10/8/27
Timeline
General Foreman & Assistant Superintendent
The Walsh Group
07.2021 - Current
General Foreman & Assistant Superintendent
Schiavone, Co. LLC Dragados USA
02.2018 - 07.2021
General Foreman & Assistant Superintendent
Schiavone, Co. LLC Dragados USA
11.2015 - 01.2018
Foreman
Schiavone, Co. LLC Dragados USA
11.2009 - 02.2013
Local 731 Laborer
Schiavone, Co. LLC Dragados USA
07.2003 - 11.2009
Similar Profiles
Vaughn WhitakerVaughn Whitaker
Project Engineer II at The Walsh GroupProject Engineer II at The Walsh Group