Summary
Overview
Work History
Education
Skills
Websites
Work Availability
Timeline
Generic
Gregory L. Hill

Gregory L. Hill

Richwood,TX

Summary

To be gainfully employed with a company that I can utilize my 30 years of experience. I have been involved mainly been with “grass-root” projects, revamps, Major turn arounds, retro fits, planning, executing TA's and capital projects in the chemical industry. Summary of Qualifications: I can adjust to all levels of managerial and technical positions. I adapt easily to new and ever-changing industrial standards and specifications as well as safety and environmental conditions. Proficient with SP3-D modeling program, Smartplant 3-D walk-thru model for team checks and client, contractor, and operations approvals. Great with verbal and electronically communication skills. Trained in best practices GPM for fel stages 1,2 and 3, bidding and construction packages, gate reviews and assembling estimates, Mto’s Interfaces well with Customer, clients, EPC and IPC firms and other discipline leads. Reporting and tracking labor, sub-contractors progress and Project controls on current status, cost and deliverables. Interfaces well with vendors/suppliers for requisition of materials, piping, fittings, valves, equipment, etc. Follows up with deliveries and status as it impacts projects . Works from front end loading stages trough execution, to bid stages and awards. Working with contractors/sub-contractors on any clarifications or planning issues. Assist in estimates, P&ID’s for planning, commissioning to start-up and return to operations (RTO) any mark-up drawings, as-builts and complete for future references and project /turnaround planning. Present a top-class project with safety, cost, schedules and quality being all main priorities Can direct and interface well with iec and epc firms on contracting strategies and find work that can be completed simultaneously to be more proficient and improve progress Adaptable Project Superintendent knowledgeable in construction protocols and standards. Offering more than [Number] years of supervising subcontractors and ensuring projects are completed within budget and on time. Considered a top notch professional with exceptional composure. Knowledgeable construction professional known for developing effective schedules, creating plans to see projects through to completion and assessing work to comply with applicable codes. Multitasking Project Superintendent works productively with various personalities and meets very tight deadlines. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

28
28
years of professional experience

Work History

Field Superintendent

Houston Business Roundtable
01.2002
  • CPR and First Aid
  • Conflict Resolution
  • Pasce 3-D design program
  • Primavera P-3 Scheduling
  • SP3D, MET, GMISS, Managing changes, bluebeam, Autocad, and monthly training on project management
  • Safety Recognition, Works continually with Safety programs including STAC (Safety Task analysis)
  • Ergonomics Contact, Office check list, Personal safety action plan, hazard awareness
  • Dow’s drive to Zero (accident and incidents free environment)

Project planner

Dow Chemical Kelly Services
11.2019 - 04.2021
  • Put together job packages for turnarounds, interface with client on job issues, discrepancies, and execution
  • Mark up p&id's, build PowerPoint picture package
  • Identify materials needed and deliverables
  • Place plan into SAP for scheduling, cost and execution
  • Have gate reviews for projected cost and schedules for each level of funding
  • Work with contractors and sub-contractors for planned TA work, quotes and any discoveries
  • Complete the TA project as scheduled, safely and on cost as planned

Project Coordinator

Olin chemical, JVI Contractors
11.2018 - 04.2019
  • Put together job packages for turnarounds, interface with client on job issues, discrepancies, and execution
  • Mark up p&id's, build PowerPoint picture package
  • Identify materials needed and deliverables
  • Place plan into SAP for scheduling, cost and execution
  • Have gate reviews for projected cost and schedules for each level of funding
  • Work with contractors and sub-contractors for planned TA work, quotes and any discoveries
  • Complete the TA project as scheduled, safely and on cost as planned
  • Experience:
  • Arkema 10 Mm for demolition and civil project

Project manager

11.2017 - 04.2018
  • Put together cost, estimates and schedule for demo, tie points, concrete boundaries and leave existing units in production
  • Get tie-points disconnected during outage to get plant back up and running for the demo to commence
  • Have gate reviews for projected cost and schedules for each level of funding
  • Set up and manage Demolition of existing 1mm lb Reactors, have lift crews and demo folks come in and safely remove existing equipment, structures and concrete, with heavy lifts and heavy hauls of existing equipment
  • Completed the project as scheduled, safely and on cost as planned
  • Experience:
  • Dow piping lead on multiple projects ( 150MM to 350MM )

Piping Lead

06.2012 - 09.2017
  • Take projects thru FEL stages 1, 2 and 3 to detail design
  • Have gate reviews for projected cost and schedules for each level of funding
  • Interface with EPC firms, Man-Rep’s, Project Engineers, Process Engineers, Operations leads and any other critical parties to get the projects directions and deliverables met
  • Issue multiple contracts for bid and for construction, follow any changes, addendums and clarifications during the project.

Construction Manager

Link
10.2009 - 06.2012
  • Project Services- Dow Chemical / arkema 80mm project
  • Ensure all work is completed safely while continuously monitoring quality and cost
  • Reviewing engineering packages for bid out for S-1301 and S-1601 for the LPP Torrance Upgrade project
  • Tracking cost, schedules, changes, engineering changes
  • Coordinating activities between operations and contractors
  • Monitoring construction to make sure all specifications, procedures and engineering standards are followed
  • Coordination of tie-points commissioning, returning equipment and systems over to operations

Piping Designer and Field

Link Project Services- Dow Chemical
01.2008 - 10.2009
  • Engineering (150mm Capital Project )
  • Completed this task with NO recordable accidents or incidents during this 2-year project
  • Following the CAA caustic upgrade
  • Working with the Construction team, Project Management, Manufacturing Representatives, Process, Operations and contractors
  • Track correct and issue direction for any field engineering errors or obstructions
  • Running screen plots, 3-D tagged views, revising drawings
  • Tracking RFI’s (request for Information)
  • Piping design with 3D program PASCE
  • Issuing bid packages with all Specifications, drawings, materials and other pertinent information
  • Interfacing with other discipline leads: I&E, Mechanical, Civil, Structural Process Engineering and Project Controls to coordinate activities
  • Assisting in smooth communications between Customer/Contractors, EPC/LPC and Operations

Piping Designer

Kelly Engineering Services- Dow Chemical
08.2004 - 01.2008
  • Mm to 200mm Capital Projects )
  • Completed this task with NO recordable accidents or incidents during this 2-year project
  • Designed and followed construction on a grass roots PGA expansion
  • Assisted with project team from FEL to RTO
  • Worked with team on strategies for designing, checking and issuing bid packages, addendums; constructability
  • Overseeing corrections, field changes or modifications per operations and constructions request
  • Field measuring and identifying tie-points
  • Modeling existing piping (since most equipment /piping is not modeled) for The Texas City projects using PASCE
  • Designed new piping for the OISM upgrades
  • Performed P&ID reviews and marking up changes as well as updating Excel spreadsheets for Line list and Tie-points
  • Issued any Mark ups, as-builts, testing and commissioning documents to client.

Construction Manager

Civil Mechanical Inc
01.2004 - 07.2004
  • Mm to 20mm Construction GM Projects)
  • Assigned jobs to all levels of superintendents
  • Assisted estimating during the bid stages, scheduling, and thru completion of the awarded projects
  • Interfaced with customers /clientele over construction from Texas City to Seadrift for the Civil and Mechanical work for CMI
  • Reviewed lay-outs and constructability, determined man-power
  • Interviewed and hired qualified personnel for projects
  • Tracked cost, schedules, revisions, deliveries and engineering impacts to the projects.

Owner’s Representative

CDI Engineering Group
01.2002 - 01.2004
  • Mm Capital Project )
  • Coordinated efforts between Dow Chemical and EPC firm while working on the Freeport PMDI Phoenix and EBA Zeolite Expansion
  • Responsible for delegation of duties to several subcontractors as required to maintain a construction schedule
  • Interfaced with design leads, coordinated efforts and construction releases on piping, equipment, structural and civil designs
  • Worked with engineering and construction on Managing delays, Engineering errors, Constructability concerns
  • Solving issues with safety, scheduling and cost

Field Superintendent

01.1998 - 01.2002
  • Mm to 145mm GM Projects

US Contractors
01.1993 - 01.2002

Field Supervisor

01.1993 - 01.1998
  • Supervised the installation of mechanical piping, equipment, and structural steel
  • Coordinated piping revisions with onsite engineers; Worked up the extras for RFI and engineering Addendas.QA/QC inspector of mechanical systems; design, sketching and field routing
  • Procurement of all materials ordered and coordinated rentals from small equipment to heavy lifts for towers and compressor equipments
  • 30 ton to 1200-ton ringer cranes.

Education

Coursework included Drafting Engineering, Process Drafting, I and II, Microstation, Auto-cad Certified Pipe Fabricator 80+ Hours of Supervisory Management -

Brazosport Community College

Skills

  • Hand and Power Tools
  • Operational Processes
  • Document Control
  • Project Scope Understanding

Websites

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Timeline

Project planner

Dow Chemical Kelly Services
11.2019 - 04.2021

Project Coordinator

Olin chemical, JVI Contractors
11.2018 - 04.2019

Project manager

11.2017 - 04.2018

Piping Lead

06.2012 - 09.2017

Construction Manager

Link
10.2009 - 06.2012

Piping Designer and Field

Link Project Services- Dow Chemical
01.2008 - 10.2009

Piping Designer

Kelly Engineering Services- Dow Chemical
08.2004 - 01.2008

Construction Manager

Civil Mechanical Inc
01.2004 - 07.2004

Field Superintendent

Houston Business Roundtable
01.2002

Owner’s Representative

CDI Engineering Group
01.2002 - 01.2004

Field Superintendent

01.1998 - 01.2002

US Contractors
01.1993 - 01.2002

Field Supervisor

01.1993 - 01.1998

Coursework included Drafting Engineering, Process Drafting, I and II, Microstation, Auto-cad Certified Pipe Fabricator 80+ Hours of Supervisory Management -

Brazosport Community College
Gregory L. Hill