Experienced Crew Foreman with excellent project management, testing and decision-making abilities. Proficient in assessing day-to-day operations and preparing crews for a days work. Ready to bring 27 years of experience to a challenging new role.
Overview
27
27
years of professional experience
Work History
Crew Foreman
Garkane Energy
Hatch, UT
03.2019 - Current
Perform daily tasks as a working crew forman to ensure the jobs are done safely and in a timely manner.
Supervised crew members during daily operations at Garkane Energy.
Trained new employees on operational procedures and safety protocols.
Conducted regular inspections of tools and equipment for maintenance needs.
Facilitated communication between team members and management during projects.
Monitored workflow to optimize resource allocation and task completion.
Conducted safety inspections of equipment and job sites to ensure compliance with regulations.
Directed and supervised crew activities, ensuring that work was completed in accordance with established guidelines.
Participated in regular meetings with other foremen in order to discuss best practices and process improvements.
Resolved conflicts between employees regarding work-related issues in a timely manner.
Assisted with budgeting by keeping track of labor hours and expenses.
Provided training sessions for new hires on safety procedures, job duties, responsibilities.
Helped recruit, hire and train crews for project needs.
Provided technical guidance and assistance to crew members in order to complete tasks efficiently.
Communicated closely with customers about project status updates throughout the duration of the job.
Managed inventory levels of supplies such as tools, materials, parts; ordering items as needed for crews.
Developed project plans for crews, including coordinating resources and scheduling timelines.
Ensured proper maintenance of tools and equipment used by the crew.
Coordinated with other departments to ensure smooth operations during projects.
Assigned tasks to individual workers based on their skillset while delegating authority appropriately.
Managed multiple employees in various job tasks throughout phases of project completion.
Prepared and planned worksites to help jobs run smoothly.
Delivered positive reinforcement and constructive criticism for employee work efforts.
Diagnosed and corrected malfunctions with equipment and machinery.
Delegated daily tasks to team members to optimize group productivity.
Inspected cleanliness, organization and safety of job sites after every shift.
Managed multiple employees in various job tasks throughout all phases of project completion.
Journeyman Lineman
Garkane Energy
Hatch , UT
03.2007 - Current
Installed and maintained overhead and underground electrical lines.
Conducted routine inspections of power distribution systems.
Operated bucket trucks and digger derricks for line work.
Collaborated with team members on safety protocols and procedures.
Responded to outages and emergency repair requests promptly.
Trained apprentices on tools, techniques, and safety practices.
Ensured compliance with local regulations and industry standards.
Assisted in the planning of new electrical installations and upgrades.
Provided technical guidance to apprentice linemen when needed.
Operated bucket trucks to access high voltage lines for repairs or maintenance activities.
Worked quickly and safely to maintain and reconduct lines.
Participated in training sessions to learn new techniques in line operations.
Climbed wood poles using approved climbing methods while wearing proper safety gear.
Performed installation, maintenance and repair of overhead and underground power lines.
Performed work on both dead and energized lines of different voltages.
Utilized specialized tools including hot sticks, rubber gloves, cable slings and lineman pliers.
Repaired or replaced damaged poles and anchors following storm damage or vehicle accidents.
Tested and operated switches, cutouts, regulators and voltage controllers for proper operation.
Read blueprints to determine locations of power line routes.
Removed trees from around high voltage power lines to prevent outages caused by tree limbs touching wires.
Attached transformers to poles and connected to power lines.
Responded quickly during emergency situations such as storms or downed poles and lines.
Replaced faulty components such as insulators, conductors and related hardware on energized circuits up to 69KV.
Installed transformers and other electrical apparatus in substations, switchyards and along rights-of-way.
Conducted fault location on all types of distribution systems using various testing equipment.
Reviewed safety regulations prior to commencing any job tasks.
Assisted in the construction of new transmission lines by erecting poles, setting crossarms, stringing wire and installing fixtures.
Implemented preventive maintenance procedures on all electrical equipment used on the job site.
Maintained records of work performed such as material used, labor hours utilized.
Ensured that all necessary documents were completed accurately before leaving a job site.
Inspected transmission line structures to ensure compliance with safety standards.
Assisted in constructing fiber optic networks by pulling cables through conduit runs.
Opened switches or attached grounding devices to remove electrical hazards from disturbed or fallen lines.
Troubleshot overhead distribution lines to restore power service.
Identified site hazards and utilized safety and protective equipment to comply with safety rules.
Patrolled lines and reported defective equipment or unsafe conditions to supervisor for resolution.
Compared layout and methods of installation to blueprints and sketches and marked differentiations on drawings.
Tested conductors to identify corresponding conductors and prevent incorrect connections.
Assessed power lines, poles and electrical equipment for wear and damage and reported deficiencies to appropriate supervisor.
Installed electric watthour meters in pre-installed meter-connection boxes to connect service.
Tested and inspected electric distribution equipment and wiring outside and within buildings to verify conformance of installation with construction and building code specifications.
Shortened or lengthened wires by removing or adding wire and used different types of splices, connectors and clamps.
Operated bucket trucks, diggers, and other equipment to erect poles and light or heavy power lines.
Spliced wires and soldered connections to complete circuitry for effective power distribution.
Adhered to local, state, and federal regulations governing electrical transmission and distribution.
Trained and mentored apprentice linemen, sharing knowledge and reinforcing safety practices.
Performed ground work, setting up traffic cones and safety signs to secure work areas.
Read and interpreted work orders, diagrams, and specifications to determine repair or installation requirements.
Utilized GPS and mapping tools to locate and diagnose issues within the electrical distribution system.
Communicated effectively with customers, addressing concerns and explaining the nature of work.
Utilized volt meters, ammeters, and other testing devices to assess and ensure system functionality.
Participated in safety meetings and workshops to stay updated on industry practices and standards.
Handled repair work for overhead and underground electrical power lines.
Climbed wooden poles, ladders and towers or used bucket trucks to reach power lines and complete work.
Maintained electric work tools and equipment.
Helped out by participating in extra shifts when emergencies or outages required additional assistance in adverse weather conditions.
Completed resagging on older or improperly installed lines.
Assessed job sites for cleanliness and organization and loaded trucks with materials at completion of shift.
Performed pre-installation procedures to attach cross-arms, insulators and auxiliary equipment to poles.
Assigned tasks to employees and monitored productivity, performance and task completion.
Apprentice Lineman
Springville City Power and Light
Springville, UT
08.2004 - 03.2007
Climbed wood poles to install lines, change out transformers and connect new service.
Operated overhead line equipment such as bucket and boom trucks with consistent safety.
Kept street and security lights in good working order with regular maintenance.
Assisted with emergency call-outs to quickly restore service.
Handled repair work for overhead and underground electrical power lines.
Shortened or lengthened wires by removing or adding wire as needed and used different types of splices, connectors and clamps.
Telecommunications Lineworker
Neils Fugal Construction
Pleasant Grove, UT
06.1999 - 08.2004
Dug hand holes for anchors and poles for installation of fiber and copper phone lines.
Continuously applied quality-improvement methodologies to improve work processes.