To pursue a challenging position as an Engineer in Mechanical domain in a professional organization, where I have the responsibility and accountability to use my skills and efforts to achieve great results, at the same time shall be able to achieve Career progress.
Overview
14
14
years of professional experience
Work History
Senior Mechanical Engineer
Qatar Armed Forces (Engineering Corps)
04.2014 - Current
Air conditioning, ventilation system and refrigeration units:
Supervision and Installation, operation, testing and commissioning and maintained air conditioning ,chiller system and refrigeration equipment including compressors, duct works external and internal, ducts insulation and coatings, evaporators, expansion valves, solenoid valves, controls and related equipment and accessories
Reviewing the material submittals and studying the technical data, calculations, certificates of the materials based on QCS2014 and international standards
Reviewing the design drawings, shop drawings and as-built drawings to make sure they match with the building’s calculation and project requirements
Plumbing and drainage system:
Performed testing and installation for the pumps, water tanks, drainage holding and septic tank, lifting stations, PPR, PVC, HDPE pipes ...
Etc underground and above ground at all facility locations, as per the building requirements and based on standard
Calculate, checked, and review the projects drawings (design drawings, shop drawings, as-built drawing) for approval
Test and review submitted materials according to all relevant project codes, standards, and specification for approval
Supervising the installation and testing of sewage treatment plant facilities, their compliance and inspection with the authorized entities in the State of Qatar for operation
Firefighting system:
Reviewing complete fire protection drawings, including all general drawings according to QCDD and NFPA20 requirements
Inspect and test the installation of the FM200, sprinkler heads, piping, pumps and hose connections and related equipment (fittings, valves, supports) ...etc in accordance to NFPA20 and QCDD standard
Reviewing the material submittals and studying the technical data, calculations, certificates of all the firefighting system materials based on QCS2014 and NFPA20 standards
NOTE: Projects implemented in the armed forces will not be mentioned for security reasons
Project Engineer
Qatar Engineering and Construction Company, (QCon) Doha, Qatar
02.2011 - 08.2014
Project Name: Rasgas Train-3 (AKG-1) shutdown:
My Responsibilities include Manages all aspects of shutdown preparation & field execution for the shutdown activities such as:
Mobilization of equipment & site facilities
Blinding / De-blinding & inspection of pressure vessels & reinstallation of valves (control valves, manual valves) rigging / lifting, scaffolding, painting & refractory works, hot & cold insulation, bolt tensioning / hydro torquing / scaffolding erection / installation of gas turbines/ hot tapping & cold tapping /blinding , fabrication & erection of life lines (piping work)
Project Name: Gasal Project:
I started as usual with getting in touch with the construction team as well as the people in charge from the client side that I may have to contact with them during my duty
In the first few days after getting familiar with project, I have sit with the construction manager and we discussed the general features of the project
And we have discussed where and what activities shall I take care and supervise during my duties
Then, I have gone through the scope of work and all other important documents
In addition to that, I have studied all the engineering drawings such as the isometric drawings, general arrangement drawing … etc
First assignment: Tie in work:
I started to work with14 inch nitrogen line which has been constructed earlier from (metering skid) to GASAL existing line
The nitrogen existing line have been isolated by GASAL operation team and handed over to construction team
Then we start cutting the existing nitrogen line with normal grinding machine to install our connection fitting (TEE JOINT)
The fitting has been hydro tested earlier in the lay down
We have connected the tee with welding neck flanges and then the flanges related to blind flanges to block the water
Two of the flanges were connected with valves to have the water in and the other valve to make sure that the spool is emptied from air and filled totally with water
The spool has been tested to60 bars for around2 hours
Second Assignment: piping insulation work:
I was following up the piping installation work (thrust boring crossing area)
The fabricated spools were connected one by one
There, we have two lines oxygen line and nitrogen line
I used to supervise the installation and the construction activities of those two lines
During that period, I was reporting to construction manager all work activities that were running daily in the site
I have supervised the fabrication, fitting welding and joining processes
There are so many steps for installation of piping
First, we make fit up for the pipes then we use high low gage to fit up the spools properly (the gap will be plus or minus2 mm)
Then we put the tacking clip then we start the welding steps, there is a ROOT PASS, HOT PASS, FILLER PASS, and CAP
After that I have assigned to work with QC team to make daily progress inspection report (PIR)
This report includes:
The inspection no# of the pipe
The size & length of the pipe
Thickness of the pipe
Fit up date
Welding done date
Welder identification number
I have been checking if any scratch or crack in the pipe, then it will be marked for further inspections
This report must be handed over to the QC manager on daily basis
Project Name: Qatar Gas JBOG (Jetty Boil off Gas Recovery Project):
Supporting project coordinators in developing projects detail planning, status monitoring and progress follow up of all project’s phases
Develop and maintain good standards and tools on projects portfolio monitoring practices
Compiles and produces projects portfolio periodic reports to give overview through trends and statistics
Liaise with multiple trade project coordinators, plant owners and other stake holders for smooth running of projects
Act as a point of reference for introducing improvements in project management systems and routines
Support project coordinators in cost control and assist section activity to finalize project annual budget frame
Coordinate specific projects including team of other discipline engineers
Maintain awareness of latest developments in the field and use it to improve group functions in supporting company objectives
Project Name: Qatar Gas Waste Water Disposal Surface Facilities Project ( WWDSF):
Coordinating with client, project team and others as necessary to determine client requirements and meet expectations
Ensuring compliance to all relevant health, safety, quality, environmental management procedures and controls of project
Coordinating and supervising project and shutdown activities such as:
Permit to Work (PTW) coordination
Preparation method statement and Job Safety Analysis (JSA) related to the project
12” &6” pipe Tie In works during shutdown
Fabrication including cutting, grinding, welding and fit up of6” pipe joints
Above ground pipe and pipe supports installation for approx.4 km
Erection and installation of pipes in duct banks including coating, spacers, and sleeves installation
Supervising radiography and hydro-testing activities
Excavation and backfilling for duct bank & pipe support activities & dealing with underground facilities
Education
Bachelor of Engineering Degree - Industrial Mechanical Engineering
October6 University
06.2010
Skills
Reviewing design drawings, shop drawings, as built drawings as per the project requirements
Reviewing the Material Submittals for approvals
Field installation for Mechanical Works as per the standards and the project requirements
Testing & Commissioning for HVAC System
Testing & Commissioning for Fire Fighting System
Testing & Commissioning for Plumbing & drainage System
Ability to deal with plant P&ID and isometrics and general arrangement ( design drawings, shop drawings, as-built drawings, material submittal, method of statement)
Successful team work and problem-solving dexterity
CAREER SUMMARY:
An Engineer-Mechanical with (14 years)of professional experience in the field of vivid construction projects from scratch to commissioning, maintenance & operation, currently working as Senior Mechanical Engineer at Qatar Armed Forces (Engineering Corps).
Training
Quality Management System (QMS) Training Course, Qcon, Doha, Qatar.
Basic Fire Extinguisher Course at Qcon.
PTW, ECPW, H2S Safety Induction at Qatar Gas.
Work management system training (WMS) , PTW, confined space training at Ras Gas .
Safety Officer Training Course, Doha, Qatar.
Rigging Supervisor Training Course, Doha, Qatar.
Fire Fighting Course, Ras Gas
Languages:
Arabic: Mother Tongue
English: excellent
Hindi: Beginner
Timeline
Senior Mechanical Engineer
Qatar Armed Forces (Engineering Corps)
04.2014 - Current
Project Engineer
Qatar Engineering and Construction Company, (QCon) Doha, Qatar
02.2011 - 08.2014
Bachelor of Engineering Degree - Industrial Mechanical Engineering