Civil Engineer, a graduate of Tishreen University in Latakia, Syria, class of 2007, with over 14 years of experience in the execution and management of small to medium-sized projects as well as large-scale projects, including commercial, residential, industrial, infrastructure, possess strong capabilities in managing projects using both traditional project management approaches and agile methodologies. I have successfully led multidisciplinary teams by applying the Advanced Work Packaging (AWP) methodology. My track record includes the successful delivery of projects, achieving corporate objectives, enhancing customer satisfaction, reducing risks, tracking actual progress against planned schedules, and improving performance indicators related to productivity, quality, safety, timelines, cost, and specifications. I also have solid knowledge of both local and international structural codes.

Overview

15
15
years of professional experience
1
1
Certification
3
3
Languages

Work History

Senior Construction Manager

TMC Trading & Contracting Company
Doha, Qatar
06.2022 - 11.2024

Project : BN-SH7 Umm Salal/ project Duration 2 Years/ Project Value 159 Million Dollars/ Project Development Bin Al Sheikh Holding/ Project Consultant CEC/ Project Details 42 villas, town House ,mosque,gum,supermarket,entertainment area.

Responsibility :

  • Participating in the review and development of architectural and structural drawings in coordination with consultants and designers.
  • Preparing the overall execution plan (MCB) and the project schedule in coordination with the Project Manager.
  • Technical risk assessment and the development of a mitigation or resolution plan to address potential issues before they occur, with all details documented in the risk register.
  • Verifying site readiness (such as grading works, geotechnical investigations, and permit acquisitions).
  • Coordinating the schedules for material and equipment supply, in addition to selecting and evaluating subcontractors.
  • Led a team of engineers from various disciplines, including civil, architectural, electrical, mechanical, finishing, and safety.
  • I developed a task execution plan by breaking down each scope of work into weekly or daily tasks and distributing them among the team members according to their responsibilities. This was done to ensure proper execution, monitor the quality of work, ensure compliance with specifications, and maintain adherence to the project schedule and budget without any deviations.
  • Managing the construction execution process in compliance with the specifications and Qatari code, within the defined schedule and budget, and handing it over for the commencement of the next phase of work in the WBS.
  • Ensuring proper execution of electrical, HVAC, plumbing, drainage, and fire-fighting systems.
  • Following up on material approvals and shop drawing submissions.
  • Coordinating slab openings, service routes, and sleeves with MEP teams.
  • Attending weekly coordination meetings and resolving drawing clashes.
  • Attending all technical and administrative meetings, as well as Scrum Master meetings, and participating in development, analysis, and problem-solving. Submitting weekly and monthly reports covering all stages of work progress, identified issues and their solutions, along with performance and evaluation reports.
  • Organizing finishing activities (plastering, waterproofing, flooring, painting, carpentry, glazing).
  • Implementing quality control systems and creating snag lists for each villa.
  • Ensuring safety protocols during installation and system commissioning.
  • Supervising the construction of internal roads, drainage networks, water supply, power lines, and telecom systems.
  • Coordinating with government authorities (KAHRAMAA, Ashghal, Ooredoo).
  • Overseeing construction of shared facilities: gardens, mosque, security rooms, lighting systems, boundary walls.
  • Ensuring that all works are executed in accordance with Qatari specifications, the approved vendor list, and the Qatari construction code at all stages of the project.
  • Preparing handover documentation (As-built drawings, operation manuals, warranty files).
  • Delivering the project to the consultant and client with full satisfaction.
  • Organizing site inspections for owners/customers.

Achievements :

  • Successfully met the project requirements and plans by preparing the site, selecting a qualified team, and developing a phased work plan.
  • The project was successfully delivered 30 days ahead of the scheduled deadline and at 3.7% below the actual allocated budget.
  • Optimized material usage and logistics, reducing project waste by 7% and contributing to cost savings without compromising quality.
  • Resolved critical technical issues during execution by collaborating with consultants and project teams, ensuring uninterrupted workflow and timely decision-making.
  • Led and coordinated a multidisciplinary team of engineers (civil, architectural, MEP, safety, and finishing) to achieve all project milestones while maintaining compliance with technical specifications and safety standards.
  • Implemented effective safety practices and monitored HSE compliance, achieving zero lost-time incidents across the entire construction phase.
  • Implementing the communication plan among all different teams on site through direct coordination, field meetings, and on-site office discussions.
  • Prepared and submitted periodic progress reports, financial updates, and risk assessments to senior management, contributing to data-driven project decisions and successful stakeholder alignment.
  • Managed final inspection, snagging, and handover processes in coordination with consultants and clients, ensuring full satisfaction and timely project closure.

Senior Project Engineer

UrbaCon Trading and Contracting (UCC)
Doha, Qatar
10.2020 - 04.2022

Project : L , A Barwa Brahat AL Janob /Project Duration 2 years/Project Value 540 Million Dollars / Project Development Barwa/Project Consultant Dara Engineering/ Project Details 1404 buildings, 16,848 Rooms / Projects consists GF,1&2 Floors.

Responsibility :

  • Managing a team consisting of 4 engineers, 5 supervisors, and 120 workers.
  • Participated in the planning process and the development of the (WBS), and created a work plan with tasks divided into small, quick-to-complete activities, each scheduled to be completed within one week.
  • Led the entire excavation process on site, including soil compaction, soil testing, and ensuring each block was ready for handover to commence structural works.
  • Managed all construction and finishing operations for Zone 1, comprising 470 buildings In addition to the mosque, gardens, and shopping center within, each consisting of a ground floor, first floor, and second floor.
  • Executed the excavation works for the entire external boundary wall and completed the blinding concrete for all footings in preparation for the installation of the precast concrete fence, in coordination with the responsible contractor, REDCO.
  • Prepared 1,404 blocks by completing excavation, soil compaction, and testing, followed by obtaining approvals to begin raft foundation works, including formwork, reinforcement installation, MEP provisions, and finally casting the raft with concrete.
  • Assigned tasks to the team and provided them with the work plans to be executed, along with a timeline designed to facilitate efficient execution. As a result, we progressed one full month ahead of the actual project schedule.
  • The formwork used in the project consisted of tunnel-type forms that were preassembled on-site and then transported for installation over the raft foundation. The subcontractor responsible for this operation was the Turkish company GAZEL.
  • Successfully delivered a detailed video explanation and walkthrough to the team I manage, ensuring they fully understood the entire process, including logistical coordination of machinery and equipment, coordination with the subcontractor, and identifying the right timing for transport and installation. I also analyzed potential issues in advance to prevent them and address them immediately if they occurred.
  • Completed all structural works for Zone 1 within 9 months, which was 2 months ahead of the scheduled timeline. This achievement was the result of the execution plan I developed, effective task distribution, the accomplishments of the team, and active involvement in resolving challenges directly as they arose.
  • Started finishing works for the buildings completed structurally, as well as MEP works. We began with the external painting works for the buildings in coordination with the subcontractor, Arab Builders.
  • Consistently ensured and monitored the quality of work and progress on site, verifying the complete completion of tasks before submitting inspection and handover requests to the consultant.
  • Consistently emphasized to the team the importance of full compliance with safety regulations on site, including strict adherence to PPE requirements, and granted the safety officer full authority to issue violations to anyone failing to follow safety protocols within my area of responsibility.
  • Ensuring that all works are executed in accordance with the specified standards and within the allocated budget, while verifying compliance with the approved shop drawings.
  • Monitored the performance of the team and subcontractors, as well as productivity levels, to ensure that all tasks were completed without deviating from the established work plan.
  • Successfully completed the entire finishing works, including waterproofing, painting, installation of porcelain and ceramic tiles for floors and walls, aluminum window installations, wooden door fittings, and gypsum works for suspended ceilings.
  • Followed up on developments and updates to the plans, and submitted weekly and monthly reports through participation in technical meetings, the weekly Scrum Master meeting, and progress review meetings, while addressing and resolving site-related issues across all zones during execution.
  • Follow up on cleaning and final touch-up works (Snag List & Final Handover) to ensure the project is delivered at high quality and free of defects.
  • Submission of the as-built drawings and all project-related documents and records.

Achievements :

  • Successfully planned and executed the excavation works and preparation of 1,404 blocks for the start of structural activities one full month ahead of the actual project schedule.
  • Successfully managed the team and site operations in accordance with the plan I developed, with all works executed within that framework.
  • Achieved a significant accomplishment in coordinating and maintaining effective communication among the various specialized teams, subcontractors, technical offices, and the consultant.
  • Successfully reduced the completion duration by two months ahead of the actual project schedule through proactive planning, execution monitoring, and continuous problem-solving.
  • Successfully managed, executed, and coordinated all structural works, along with analyzing any potential challenges that could arise during the execution process.
  • Successfully utilized engineering software such as Revit for structural analysis, 3D building modeling, and implementing design modifications during the workflow, as well as AutoCAD and Primavera P6 for managing the project schedule.
  • Performed finishing works with a high level of professionalism, ensuring prior coordination at every stage with the MEP department to execute all MEP-related activities in alignment with finishing works, preventing any delays or obstacles to the progress of the finishing team.
  • Completed all works and submitted all structural drawings, documents, and records, in addition to carrying out full site cleanup, two months ahead of the actual project schedule.

Senior Project Engineer

Urbacon Trading and Contracting
09.2019 - 10.2020

Project : Lusail Palace / Project Design and Built / Project Duration 6 Years // Project Value 5 Billion Dollars // Project Consultant AA & PEO & Highness

Responsibility :

  • At the beginning, I was assigned to manage the construction works of five tunnels, divided as follows: two tunnels for the Citizen, two tunnels for VIPs, and a special tunnel referred to as a (UGS).
  • I reviewed all structural drawings and ensured that there were no issues that could hinder the progress of the works.
  • The tunnels are 8 meters deep and L-shaped, with a width that starts at 6 meters and gradually expands to a square shape measuring 20X20 meters at the end.
  • I planned the dewatering process to remove the stagnant water that had accumulated over a long period after excavation, which resulted in the presence of clayey soil that needed to be treated before starting the construction works. This was the first challenge I encountered on site.
  • The dewatering process was carried out by excavating channels with slopes along the edges of the long side of the tunnel and the square end, directing the water toward the end of the tunnel. The channels discharged into a pit measuring 4*4 meters with a depth of 4 meters, where the water was collected.
  • I coordinated with dewatering contractors, Action Company and WJ Company, to supply the pumps and begin the groundwater dewatering process from inside the sump pit. According to the plan and to ensure continuous operation, we installed two 6-inch pumps in each sump pit. The dewatered water was discharged into water tankers in coordination with the logistics team to transport it off-site, as there was no available space for water collection within the site.
  • The second major challenge I faced was the removal of the clayey soil or ( Loos Material). We proposed several solutions to the consulting office; however, they were all rejected, and a final decision was made to remove the clay soil that had been beneath the stagnant water. We immediately proceeded to carry out the consultant's request and removed the clayey soil.
  • Another critical task I faced after the removal of the clayey soil was the increase in the quantity of blinding concrete, as determined during the soil compaction process and the placement of the 1000-gauge polyethylene sheet. We proposed several solutions to reduce the concrete volume and submitted them to the consulting office; however, they were rejected once again. The consultant instructed us to proceed with pouring the increased quantity of blinding concrete without adding any other materials during the casting process. The work was executed accordingly, in compliance with the approved standards and specifications.
  • I led a team of engineers and supervisors at the start of the construction operations, along with a group of contractors. I held meetings with them to review the execution plan and clearly defined the tasks. I then distributed responsibilities among the teams and contractors to ensure that each group had a clear understanding of their assigned duties.
  • I secured the five tunnels by providing top-side protection through the installation of a waterproof barrier and covering the excavation slope from top to bottom with green safety mesh. This was done to protect the workers below from falling rocks or soil during operations. Strict adherence to PPE regulations was enforced, and the safety engineer was given full authority to take disciplinary action and make decisions as needed.
  • I led the entire construction process through to completion and handover, ensuring full compliance with the approved standards, specifications, and design drawings.

Achievement :

  • The successful implementation of the dewatering plan I developed and executed helped accelerate the process without any delays to the scheduled timeline and without incurring additional costs, as it was covered under the excavation contractor's scope of work.
  • I successfully led the operations as per the WBS from initiation to closure.
  • Successfully resolved potential issues in advance through proactive analysis of execution processes and by reviewing the risk register to identify challenges that might arise during the course of the work.
  • Successfully managed communication among stakeholders, as well as technical, administrative, and consultancy teams, to ensure smooth operations without interruptions. Work was handed over through an IR (Inspection Request) to obtain approval and proceed to the next phase, while ensuring the quality of the executed works prior to handover.
  • I consistently ensured safety and security on site, with zero injuries reported among the teams during execution activities. I emphasized strict adherence to PPE and the safety guidelines provided by the site safety officer to ensure that all teams returned home safely and I succeeded in achieving this.

Construction Manager

ALSarh Holding
Doha, Qatar
07.2017 - 11.2018

Project: Souq Al Haraj New Location in Al Wakrah / Project Duration 2 years / Project Value 60 Million Dollars.

Project Owner and Developer: Barwa Real Estate Company

Consulting : Triple A

Building consists of a B,GF,M,1F,2F.

Responsibility :

  • At the beginning, I supported the project planning process by defining the project scope, objectives, and requirements, as well as contributing to the development of the (WBS). I also assisted in preparing the project schedule, estimating, allocating resources, and analyzing and assessing risks. Additionally, I was familiar with the quality plan and supported the Project Manager in establishing the communication plan.
  • Reviewed structural drawings and compared them with architectural plans to ensure there were no conflicts, in order to prevent issues and resolve them before the start of execution.
  • Led a team of engineers from various disciplines, including civil, architectural, electrical, mechanical, finishing, and safety.
  • Executed several plans that I developed based on the project schedule and budget.
  • Before starting site operations, I assigned tasks to the work teams in weekly packages, each designed to be completed within one week. After verifying the completion of each package, I would assign the next set of tasks to initiate a new phase of work. This approach helped reduce waste, ensured that progress remained aligned with the project schedule, maintained work quality, and kept execution within the allocated budget.
  • Monitoring actual progress against the approved baseline program.
  • Providing support and guidance to the team by resolving issues encountered during task execution, and occasionally training newly joined engineers on work procedures while promoting continuous collaboration and trust within the team.
  • Monitoring daily productivity and addressing any decline through performance indicators such as KPIs and OKRs, while implementing immediate corrective actions.
  • Reviewing daily and weekly reports and taking corrective actions in case of deviations.
  • Identifying and assessing risks during the execution and handover stages.
  • Supervising the implementation of the (QA/QC) system and ensuring the closure of observations.
  • Ensuring the implementation of the highest standards of health and safety on site.
  • Reviewing incident reports and implementing preventive measures, while supporting the HSE department in conducting safety training and reviewing emergency plans.
  • Leading and managing all finishing works, including brickwork, plastering, waterproofing, painting, flooring, ceilings, carpentry, tiling, doors, and glazing.
  • Managing and Coordinating Subcontractors, Holding daily/weekly coordination meetings to maintain a smooth workflow.
  • Reviewing and approving mock-ups and material samples; ensuring executed works match the approved quality.
  • Monitoring and Updating the Project Schedule (Creating detailed micro-schedules for finishing works).
  • Controlling costs and waste, including material waste, time loss, labor inefficiencies, unnecessary movements on site, rework, and knowledge loss, by applying Lean Construction principles.
  • Enforcing HSE protocols tailored for finishing activities (e.g., protection of finished surfaces, enclosed space work, elevated areas).
  • Coordinating final touch-up and closure activities for all areas (retail units, services, public spaces, facades).
  • Snag List Closure Reviewing and closing all consultant/client observations.
  • Preparation of Closeout Documentation Ensuring complete submission of As-built drawings Operation & Maintenance (O&M) manuals Warranty certificates Test and inspection records.
  • Overseeing final testing and commissioning of MEP systems associated with finishing works (lighting, fire alarm, BMS).
  • Verifying subcontractor scope closure and contract finalization.
  • Establishing the post-handover maintenance and (DLP).

Achievement :

  • Successfully delivered the project 20 days ahead of the actual time schedule and at 2.3% below the allocated budget.
  • Successfully planned and divided tasks into weekly work packages, which helped in tracking progress, monitoring performance, and effectively controlling issue resolution.
  • Reduced waste during the finishing phase by 3% in actual performance at each stage of the finishing works.
  • Achieved full client and consultant satisfaction with no major remarks on architectural or civil items.

Project Engineer

Urbacon Trading and Contracting (UCC)
Doha, Qatar
06.2015 - 02.2017

Project : MOQ /Project Duration 5 years/ Project Owner and Developer Urbacon Trading & Contracting Company

Project Value 1.48 Billion Dollars.// Project Consultant KEO/CTM// Project consists of a B1,2- GF PLUS 3F and Al Rayyan Hotel.

Responsibility :

  • Review shop drawings and verify their consistency with architectural, mechanical, and electrical drawings to eliminate on‑site clashes.
  • Manage internal blockwork and masonry partitions throughout the assigned zones.
  • Execute concrete floor slabs and screed works, ensuring final floor levels (FFL) are achieved.
  • Monitored waterproofing and damp-proofing works in restrooms, restaurant kitchens, and technical roof areas.
  • Executed wooden ceilings, secondary concrete slabs, and light steel structures for finishing purposes or to support MEP equipment.
  • Perform quality control and civil inspections and submit Inspection Requests (IRs) for consultant approval.
  • Proactively resolved conflicts with MEP drawings through continuous updates to shop drawings, weekly coordination meetings, and a fast-tracked RFI system.
  • Followed a RACI responsibility matrix to clearly define the execution stages of finishing works indicating who approves, who reviews, and who executes each item.
  • At one stage, productivity declined as indicated by performance metrics, prompting me to take immediate corrective action, which successfully improved overall productivity.
  • Prepare detailed execution plans for finishing works in the various zones (floors, ceilings, walls).
  • Manage and execute internal plastering and drywall finishing.
  • Supervise installation of suspended and decorative ceilings (gypsum, metal, wood panels).
  • Oversee wall and floor tiling (marble, porcelain, HPL, vinyl).
  • Execute architectural joinery and wood finishes such as wall cladding, cornices, and doors.
  • Manage final protection, cleaning, snag‑list rectification, and prepare the area for handover.
  • Daily coordination with subcontractors across all trades.
  • Prepare daily and weekly progress reports, highlighting issues and corrective actions.
  • Verify compliance with the BOQ and approved technical specifications.
  • Ensure adherence to safety standards throughout mall construction activities.
  • Attend technical coordination meetings and weekly Scrum sessions.

Achievement :

  • Reduced execution duration by 10% through effective sequencing and reorganization of finishing activities.
  • Delivered critical zones on or ahead of schedule, such as food courts.
  • Maintained balanced progress across all zones to avoid delays caused by trade interdependencies.
  • Achieved zero rework through detailed drawing reviews and stage-by-stage quality checks.
  • Delivered high-quality finishes fully aligned with approved samples and mock-ups.
  • Addressed productivity drops promptly by monitoring performance indicators (KPI) and (OKR), and implementing immediate corrective actions.
  • Increased daily productivity across all activities by a full 25%, which contributed to reducing the overall project duration from the original schedule.
  • Resolved material waste issues by implementing a recycling process and successfully reduced waste by 35% through proactive early-stage planning.
  • Managed labor control and equipment utilization to ensure operational cost savings.
  • Maintained consistent participation in weekly Scrum meetings, regular coordination meetings, and HSE meetings to manage and resolve on-site challenges effectively.
  • Facing potential risks throughout the course of work and its development some of which can be anticipated in advance, while others require continuous monitoring, thorough drawing review, and focused attention to prevent them from occurring.
  • Achieved full client and consultant satisfaction with no major remarks on architectural or civil items.
  • Closed snag lists 100% before final handover.

Project Engineer

AL Khayyat Trading & Contracting (KCT)
Doha, Qatar
04.2012 - 06.2014

Project : Private Luxury Villas Complex /Project Duration 2 years/ Project Value 45 million Qatari Rials/ OWNER SH-H

AA/Qatar-UMM Quran.

Responsibility :

  • Reviewed and coordinated structural, architectural, and MEP drawings to detect and resolve any design conflicts prior to execution.
  • Managed daily site operations, including workforce distribution, equipment allocation, and material delivery coordination.
  • Led all site execution activities from excavation and foundations to the final roof slab for two villas, ensuring full compliance with approved drawings and specifications.
  • Ensured full compliance with quality, safety, and health standards, implementing corrective actions when needed to maintain site safety and minimize risks.
  • Conducted inspections and submitted completed works for consultant approval at each construction stage with minimal comments or rework.
  • Monitored productivity rates and implemented solutions to improve efficiency, reducing construction time and minimizing delays.
  • Coordinated procurement of materials and resources, ensuring alignment with budget constraints while meeting project quality standards.
  • Maintained strict control over project timeline and budget, reporting any deviations and taking preventive actions to mitigate impacts.
  • Attended and contributed to technical and coordination meetings, including weekly progress meetings and Scrum sessions, ensuring clear communication among all stakeholders.
  • Review architectural and finishing drawings (including flooring, walls, ceilings, and colors) and ensure their coordination with electrical and mechanical plans to avoid conflicts.
  • Developed a finishing execution plan that was one week shorter than the original schedule, covering waterproofing, plastering, tiling, painting, and the installation of doors and windows.
  • Managed the execution of high-end finishing works (such as marble flooring, decorative ceilings, and custom woodwork) with zero rework, achieving full consultant approval.
  • Maintained full compliance with quality control procedures and snag list management, resulting in 100% client acceptance upon project handover with no major remarks.
  • Implemented a methodology to optimize and sequence finishing activities, which helped reduce the overall finishing duration by 15%, through effective coordination and follow-up with teams and subcontractors.
  • Monitored the installation of sanitary fixtures, lighting units, and final accessories, ensuring accurate positioning and proper functionality prior to handover.
  • Followed up on the timely delivery and approval of all finishing materials to avoid delays and ensure uninterrupted site progress.

Achievements :

  • Completed full structural works (from excavation to final roof slab) for two luxury villas ahead of schedule by 7 days, through effective planning and on-site coordination.
  • Achieved 100% compliance with safety and quality standards, with zero lost-time incidents and no major non-conformities throughout the structural phase.
  • Optimized material usage and reduced waste, contributing to approximately 8–10% cost savings during the construction phase.
  • Maintained daily productivity tracking, implementing corrective actions that improved subcontractor output and kept execution aligned with the project timeline.
  • Prepared and updated construction schedules using Microsoft Project, enabling effective monitoring of milestones and proactive recovery planning.
  • Successfully delivered the project one month ahead of schedule and 5% under the estimated budget.
  • Executed the sequencing of finishing activities, which led to a 25% reduction in the overall finishing duration, thanks to effective and proactive planning.
  • Ensured full adherence to quality control procedures and snag list management, resulting in 100% client acceptance upon project handover with no major comments.
  • Successfully managed communication with teams, subcontractors, suppliers, technicians, and stakeholders.

Site Engineer

AL Beutat Trading & Contracting
Doha, Qatar
10.2009 - 02.2012

Project : 4 Private Residential Villas Development Qatar-AL Wakrah / Project Duration 2 Years / Project Value 10,657,000 million Qatari Rials//Project Owner's SH H M AL Thani.

Responsibility :

  • Assigned to oversee excavation operations at the start of on-site execution. Responsibilities included identifying and implementing swift solutions to on-site challenges, such as encountering hard rock formations that delayed progress, and addressing underperformance issues related to the excavation contractor whose daily output occasionally fell below required productivity targets.
  • In the next phase, I executed the structural and superstructure works for all villas, ensuring full compliance with quality, health, safety, and security standards, while adhering to engineering specifications, the project schedule, and the allocated budget.
  • Monitored daily productivity and worked on enhancing it. Submitted daily reports on actual work progress and challenges encountered on-site. Also attended regular meetings with managers and the weekly Scrum meeting.
  • Coordinated activities among all engineers from various disciplines to ensure proper on-site work integration. Also liaised with the consultant engineer to submit the required documents for inspection at each project stage.
  • Review architectural and finishing drawings (including flooring, walls, ceilings, and colors) and ensure their coordination with electrical and mechanical plans to avoid conflicts.
  • Monitor daily site progress and ensure adherence to approved specifications and required finishing quality.
  • Inspect and verify the quality of delivered finishing materials (tiles, paints, sanitary ware, etc.) to ensure compliance with specifications and approved samples.
  • Resolve daily on-site issues such as clashes, measurement discrepancies, or supplier delays.
  • Conduct preliminary inspections of completed works before consultant inspection requests, ensuring compliance with drawings and quality standards.
  • Prepare daily and weekly progress reports for finishing works, including documentation of observations, challenges, and before/after photos.
  • Follow up on cleaning and final touch-up works (Snag List & Final Handover) to ensure the project is delivered at high quality and free of defects.

Achievement :

  • Successfully completed the full structural works (foundation to final roof slab) for 4 villas within 8 months, delivering the work 3 weeks ahead of schedule.
  • Reduced structural construction time by 15% through effective planning, manpower optimization, and proactive problem-solving.
  • Maintained 100% compliance with safety and quality standards, with zero lost-time incidents throughout the structural execution phase.
  • Led coordination between civil, MEP, and consultant teams during structural execution to avoid conflicts and achieve seamless progress.
  • Executed the sequencing of finishing activities, which led to a 10% reduction in the overall finishing duration, thanks to effective and proactive planning.
  • Proactively resolved over 75% of finishing-related issues, including material conflicts, supplier delays, low productivity, and technical problems.
  • Maintained full compliance with quality control and snag list procedures, resulting in a 100% client handover acceptance rate without major remarks.
  • Developed and implemented a plan to reduce material waste by 30%, successfully achieving the target while maintaining cost control, quality, and the final aesthetic appearance.

Education

Bachelor of Science - Civil Engineering

Tishreen University
Lattakia-Syria
07-2007

Skills

Project Management

Software

AutoCAD

Revit

Civil 3D

SAFE

Primavera P6

MS Project

Certification

Certificate attended a 35 PDU PMP Training course from STANDRD SOLUTIONS ENGINEERING CONSULTING /ATP INCTRUCTOR Eng. Mohamed Walid Ibrahim

Timeline

Certificate attended a 35 PDU PMP Training course from STANDRD SOLUTIONS ENGINEERING CONSULTING /ATP INCTRUCTOR Eng. Mohamed Walid Ibrahim

07-2025

Senior Construction Manager

TMC Trading & Contracting Company
06.2022 - 11.2024

Senior Project Engineer

UrbaCon Trading and Contracting (UCC)
10.2020 - 04.2022

Senior Project Engineer

Urbacon Trading and Contracting
09.2019 - 10.2020

Construction Manager

ALSarh Holding
07.2017 - 11.2018

Project Engineer

Urbacon Trading and Contracting (UCC)
06.2015 - 02.2017

Project Engineer

AL Khayyat Trading & Contracting (KCT)
04.2012 - 06.2014

Site Engineer

AL Beutat Trading & Contracting
10.2009 - 02.2012

Bachelor of Science - Civil Engineering

Tishreen University
Hani BerkdarSenior Civil Engineer