Summary
Overview
Work History
Education
Skills
PROFESSIONAL LEARNING
Timeline
Generic

Harika Mandala

Arlington,TX

Summary

Estimate for Silverado Phase 7 project, Jan 2024 - May 2024.

  • Led the estimating of quantities for earthwork, concrete, and masonry in a bidding project.
  • Bluebeam, Primavera P6, and Heavy Bid software were used to generate precise quantity takeoffs and construct the Final Bid, which included a rough order of magnitude (ROM), work breakdown structure (WBS), and milestones.
  • Collaborated in a team, taking the lead in creating detailed reports and construction papers while honing software skills.

Detachable Water Storage Tank, Nov 2022 - Jun 2023

  • Designed and developed detachable water storage tanks, focusing on ease of transport and assembly.
  • Ensured structural strength to support substantial loads, maintained watertightness to prevent leaks, and enhanced reliability.

Spaghetti Construction, Aug 2022 - Oct 2022

  • Conducted analysis and micromechanical modeling of bridges using spaghetti as a low-cost, innovative material to simulate structural behaviors and stress responses.
  • Developed practical insights into bridge dynamics and structural stability through hands-on experimentation and analysis.

Overview

1
1
year of professional experience

Work History

Civil Training Intern

Laxmi construction
Warangal, Telangana
05.2022 - 08.2022
  • Analyzed manpower augmentation strategies and gained practical experience in finishing activities, including flooring works, blockwork, and false ceiling installations.
  • Assisted in project planning and execution, ensuring adherence to quality standards and developing proficiency in construction methodologies and site management.

Planning Engineer

SATYAVANI PROJECTS AND CONSULTANTS PVT. LTD.
Warangal, Telagana
06.2021 - 06.2021
  • Aimed to analyze cost and timeline impacts from site amendments and BOQ changes, achieving precise adjustments to project schedules.
  • Prepared detailed growth reports for the institution and successfully employed various scheduling methodologies to effectively manage and constrain project costs

Education

Master's - Construction Management

The University of Texas At Arlington
Arlington, TX
12-2025

Bachelor of Technology - Civil Engineering

Amrita Vishwa Vidyapeetham
Tamil Nadu
06-2023

Skills

  • (BIM)Building Information Modeling
  • STAAD pro
  • MS Projects
  • Oracle Primavera
  • Design review
  • MS Office
  • Team Management
  • Conflict Resolution

PROFESSIONAL LEARNING

  • BIM workshop for Architecture, Structure , MEP BIM course using Revit (jun2024 -present)
  • American society of Civil engineers (ASCE)-Secretary& Student member(2020- present)
  • Study on Fiber Reinforced Foam Concrete -A Review(ICCMS -2022)

Timeline

Civil Training Intern

Laxmi construction
05.2022 - 08.2022

Planning Engineer

SATYAVANI PROJECTS AND CONSULTANTS PVT. LTD.
06.2021 - 06.2021

Master's - Construction Management

The University of Texas At Arlington

Bachelor of Technology - Civil Engineering

Amrita Vishwa Vidyapeetham
Harika Mandala