Worked throughout the entire changeover of the Kennedy Center from a 4120 Network to 4100ESNET system which lasted from February of 2025 until August of 2026.
Changed over conventional obsolete zone relay panels to modern addressable panels and programmed panels for high rise buildings operating on floor above floor below.
Work History
Fire Controls Technician 3
1 Year 9 Months
Johnson Controls | 12.2024 - 09.2026
Programmed and performed changeovers for 4007ES, 4010ES, and 4100ES panels and implemented minor changes across ESnet panels.
Diagnosed and resolved system troubles in addition to occasionally doing on-call service work.
Installed fire alarm systems in strict accordance with project plans, specifications, and applicable codes.
Performed job site work independently to maintain consistent workflow and completion.
Programmed, tested, and installed annunciators for job sites.
Tested and pre-tested systems for final inspection, load tests, and NAC locations.
Electrical Apprentice
1 Year 5 Months
Bopat Electric | 06.2023 - 11.2024
Installed electrical wiring, conduit, and fixtures according to blueprints and local code requirements.
Assisted journeymen with installing circuits, panels, and devices on commercial job sites.
Inspected work areas for safety compliance, proper lockout procedures, and hazard-free conditions.
Measured, cut, and bent conduit using hand and power tools for precise layout.
Pulled wiring and installed basic low voltage security devices and fire alarm devices.
Worked on secure SCIF sites under minimal supervision.
Supervisor and Technician- Fire Alarm System EST 3 at QUICKSTART TECHNOLOGY PTE LTDSupervisor and Technician- Fire Alarm System EST 3 at QUICKSTART TECHNOLOGY PTE LTD