Summary
Overview
Work History
Education
Skills
Timeline
Generic

Harrison May

Summary

My goal is to find a career, that I can grow in and find advancement. Such as apprenticing in plumbing or electrician.

Overview

4
4
years of professional experience

Work History

Roofing Laborer

Empire Roofing
07.2023 - Current
  • Removed old roofing material and properly disposed of all debris to maintain clean, organized work sites.
  • Performed job duties at low, medium and advanced heights on regular basis while observing safety protocols to avoid possibility of accidents and falls.
  • Completed residential and commercial projects with tight schedules by working effectively with fellow team members.
  • Repaired and maintained roofing systems by replacing roofing tiles and refastening seams.
  • Maintained good physical fitness in order to maintain proper balance on inclined surfaces and at high levels off ground.
  • Precisely cut felt, shingles and strips of flashing to fit angles formed by walls, vents, and intersecting roof surfaces.
  • Assisted in removal of old roofing materials and debris to prepare for application of new roofing.
  • Followed manufacturer instructions and specifications to perform proper installation.
  • Installed, repaired, and replaced single-ply roofing systems.
  • Installed high-quality roofing systems, paying careful attention to hazards and other safety concerns.
  • Fastened composition shingles and sheets to roof with asphalt, cement and nails.
  • Performed patching and resealing of roofs to provide maintenance, repairs and protection.
  • Cleaned up work areas upon completion of projects.
  • Operated variety of tools and equipment to safely and efficiently perform tasks.
  • Assisted with installation of gutters and downspouts.
  • Applied roof coatings to protect roof and extend lifespan.
  • Coordinated with other craft employees to maximize project efficiency.
  • Corrected improper drainage and ventilation problems.
  • Assisted in installation of skylights, solar panels and other roof accessories.
  • Adjusted roof flashing to maximize drainage.
  • Applied gravel and pebbles over top layer, using rake, and stiff-bristled broom.

Framing Carpenter

DB Construction
04.2023 - 07.2023
  • Accurately and safely installed wall, roof and floor structures according to blueprints, customer requests, and available inventories.
  • Used nail guns, saws and grinders safely and without incident.
  • Installed frames and secured to walls and support structures.
  • Cut and joined wood, using precise measurements and proper techniques to create frames of different sizes
  • Cut, measured and shaped wood after inspecting blueprints, build areas and work orders.
  • Created custom frames to meet needs of individual customers.

Framing

KJ Construction
01.2023 - 04.2023
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Planned and executed work with proper tools and materials to maximize efficiency.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Cut and shaped materials to meet outlined measurements.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
  • Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
  • Safely operated electric cordless and hammer drills and cutting torches.
  • Measured, cut and installed drywall, paneling and other materials.

Siding

Jeremy Smith Construction
01.2021 - 11.2022
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials onto trucks and trailers.
  • Cleaned and maintained tools, equipment and worksites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Managed safe and efficient use of tools and equipment on construction sites.

Painter

M&M Painting
05.2020 - 08.2020
  • Painted surfaces using brushes, spray guns, and paint rollers.
  • Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
  • Painted indoor areas such as hallways, bathrooms, and lobbies.
  • Prepared trim, walls and ceilings for painting by cleaning, smoothing, and priming.
  • Climbed scaffolding, staging, ladders, and planks to reach work area surfaces and observed safety protocols to prevent falls.
  • Applied putty, wood filler, spackling, and caulks to prep uneven surfaces and fill in holes.
  • Operated power sprayers and hand tools to prepare and paint large areas.
  • Protected surfaces from damage and spills by using drop cloths prior to and during painting.
  • Repaired wall holes and scrapes.
  • Applied primer, paints, varnishes and lacquers to walls and surfaces using traditional and sprayer methods.
  • Evaluated completed work for quality and adherence to standards and client requirements.
  • Worked holidays and weekends depending on shifting needs of project.

Education

GED -

Billings Senior HIgh
Billings Mt
11.2020

Skills

Ability to use power tools, drive a skit, measure correctly,

paint, and frame Willingness to work hard and get along with my co-workers

Timeline

Roofing Laborer

Empire Roofing
07.2023 - Current

Framing Carpenter

DB Construction
04.2023 - 07.2023

Framing

KJ Construction
01.2023 - 04.2023

Siding

Jeremy Smith Construction
01.2021 - 11.2022

Painter

M&M Painting
05.2020 - 08.2020

GED -

Billings Senior HIgh
Harrison May