Summary
Overview
Work History
Education
Skills
Timeline
Generic

Hector Jimenez

Lake Worth

Summary

Skilled Lead Maintenance Technician with a robust background in HVAC systems, demonstrated at Thermal Concepts, Inc. Excelled in troubleshooting, maintenance, and repair, enhancing equipment longevity and efficiency. Proven leadership in supervising teams and streamlining operations. Expert in plumbing and electrical solutions, blending technical prowess with strong problem-solving abilities.

Overview

22
22
years of professional experience

Work History

Lead Maintenance Technician

Hanley Center
01.2009 - Current
  • Generated and completed work orders for repairs, maintenance, and component replacement.
  • Supervised technicians and assigned responsibilities.
  • Installed, maintained and repaired Air Conditioning units in the buildings.
  • Repaired and installed electrical wiring for light fixtures and power outlets.
  • Provided functional plumbing by repairing leaks, removing drain clogs and lubricating parts.

HVAC Technician

Thermal Concepts, Inc
01.2007 - 09.2008
  • Performed troubleshooting on HVAC systems to determine root cause of issues.
  • Conducted maintenance service on HVAC systems to increase life expectancy of equipment and prevent costly repair work.
  • Inspected and tested refrigeration systems, safety devices and controls to determine proper functionality.
  • Repaired and replaced motors, bearings and belts.

Maintenance Engineer

Park Place Condominium Association
04.2006 - 01.2007

Repaired and maintained electrical, Air Conditioning, plumbing and small appliances.

Painted and touched up dry wall in the units and throughout the community.

Construction Worker

Shoma Homes
11.2004 - 04.2006
  • Operated power equipment to move materials and promote job efficiency.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.

Construction Worker

GE Drywall
09.2003 - 11.2004

Punched out the framing and drywall

Touched up of drywall and painting as necessary in the buildings.

Education

Associate of Applied Science - Air Conditioning/ Refrigeration/ Major Appliance

ATI Career Training Center
Oakland Park, FL
06-2007

Skills

  • Installation, repair and maintenance of all types of air conditioning systems
  • Repair and troubleshooting of plumbing and electrical problems
  • Small appliance repair
  • Refrigeration repair
  • Installation of drywall

Timeline

Lead Maintenance Technician

Hanley Center
01.2009 - Current

HVAC Technician

Thermal Concepts, Inc
01.2007 - 09.2008

Maintenance Engineer

Park Place Condominium Association
04.2006 - 01.2007

Construction Worker

Shoma Homes
11.2004 - 04.2006

Construction Worker

GE Drywall
09.2003 - 11.2004

Associate of Applied Science - Air Conditioning/ Refrigeration/ Major Appliance

ATI Career Training Center
Hector Jimenez