Union Carpenter
PCI
Lansing, MI
12.2024 - Current
- Inspected completed works to ensure quality standards were met before handing over the project to clients.
- Repaired or replaced damaged or defective parts using power tools and equipment.
- Installed insulation material into cavities between walls or ceilings.
- Installed windows, flooring, or trim using hand or power tools.
- Measured and marked cut lines on materials using ruler or marking gauge.
- Cleaned up job sites after completion of each task assigned.
- Repaired damaged drywall sections due to water leakage or other causes.
- Prepared walls for paint, texture or wall covering.
- Measured and cut drywall sheets to fit into wall frames.
- Installed drywall panels on walls and ceilings using screws, nails, or adhesives.
