Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

HECTOR SOLIS

Firestone,CO

Summary

Personable and reliable with natural aptitude for team leadership and problem-solving in dynamic environments. Understanding of safety protocols and project management. Mission Critical QA/QC Electrician. Multiple projects for Microsoft Data Base Centers. Committed to driving efficiency and ensuring high-quality results on every project. I have my OSHA10, OSHA 30, NFPA 70E. I speak English and Spanish.

I am seeking a lead role $50+/hr with per diem, PTO, Bonuses, a truck and advancement opportunities.

Overview

12
12
years of professional experience
4
4
Certification

Work History

QAQC Lead Tech

Loenbro
Cheyenne, WY
03.2025 - Current
  • Supervised installation and maintenance of complex electrical systems.
  • Trained and mentored junior technicians on best practices and safety protocols.
  • Streamlined workflow processes, enhancing operational efficiency across teams.
  • Conducted regular equipment inspections, ensuring compliance with safety standards.
  • Specialization in Energization (First Time Energizations)
  • Red Tag, PSI, L1, L2, Energization Scripts in the field and enter into Nexus

Commissioning Foreman

Tradeforce Staffing Solutions (CYS42)
Cheyenne, WY
07.2023 - 02.2025
  • Supervising and assigning tasks to commissioning technicians, ensuring they follow proper procedures and safety protocols
  • Performing functional tests on various building systems like HVAC, electrical, plumbing, and fire safety systems to verify performance against design criteria
  • Diagnose problems that arise during testing, coordinating with project managers, engineers, and contractors to rectify any deficiencies, and ensuring corrective actions are implemented
  • Maintaining accurate records of test results, documenting deviations from specifications, and ensuring compliance with project standards and regulations
  • Ensured timely completion of projects with effective time management and prioritization of tasks
  • Checked equipment to determine if maintenance was required
  • Inspected completed work to verify quality standards and compliance with criteria

Electrician Lead Hand

Tradesmen International (CYS 41)
Cheyenne, WY
02.2023 - 05.2023
  • Install Conduit and electrical components
  • Troubleshoot Lighting systems and circuitry
  • Terminations of High Voltage wiring
  • Installation of MDC units in SRM
  • Communicate with Foreman about material needs
  • Ensuring projects are completed on time with schedule
  • Work closely with upper management to work ahead of schedule
  • Read complex schematics and blueprints to install and repair electrical systems.
  • Trained and mentored subordinates on complex procedures and industry best practices.

Electrician

Adkins Electrical Services
Greeley, CO
06.2022 - 02.2023
  • Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers
  • Installed and wired electrical transformers, service panels, and circuit breakers
  • Troubleshoot any issues on circuitry, lighting, receptacles
  • Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code

Electrician Top Helper

The Premier Group
Denver, CO
04.2022 - 06.2022
  • Reduced installation errors by meticulously following blueprints and schematic diagrams.
  • Wiring up of cabinets and devices
  • Commissioning and troubleshoot issues
  • Improved system efficiency by installing and calibrating advanced control systems
  • Provided exceptional troubleshooting support, resolving issues promptly to minimize downtime for customers
  • Increased project completion rates through effective time management and prioritization of tasks
  • Completed critical repairs and maintenance of electrical systems and program software
  • Conducted testing and diagnostics work on control valves and other equipment at customer locations
  • Installed, inspected and tested electric meters, relays and power sources to detect causes of malfunctions and inaccuracies using hand tools and testing equipment

Electrician Technician

Casey Industrial
Longmont, CO
09.2021 - 01.2022
  • Installed, tested and modified circuit breakers, controls, fuses, lights and motors.
  • Fixed wiring and circuit systems to correct performance issues and safety concerns.
  • Adapted quickly to changing project scopes or requirements while maintaining high-quality work standards under tight deadlines.
  • Performed electrical system installation of wire, power distribution and motor controls.
  • Mentored junior electrician technicians, sharing knowledge on best practices to enhance team performance overall.
  • Collaborated with cross-functional teams to ensure seamless integration of electrical controls in production processes.
  • Preserved the integrity of intellectual property related to company-designed electrical control systems by adhering to strict confidentiality protocols and documentation practices.
  • Wiring up cabinets/plc, and devices
  • Commissioning and troubleshoot issues
  • Performed maintenance on motor control centers, motor-operated valves, programmable logic controllers, excitation equipment, human-machine interface devices and motors.
  • Conducted extensive testing on newly installed or modified equipment, ensuring proper functionality before deployment into production environments.
  • Calibrated, tested, maintained, troubleshot and installed plant instrumentation, control systems and electrical equipment.

Unlicensed Journeyman

AT Electric
12.2019 - 02.2020
  • Company Overview: Commercial work
  • Install lighting, receps, and EMT Conduit
  • Travel to different jobsites
  • Commercial work

Wanzek Construction Inc.
07.2019 - 12.2019
  • Install Rigid Conduit
  • Install Instrumentation
  • Tubing
  • Install Snap Track
  • Terminate instruments, motors, PLC
  • Install Cable Tray
  • Operate Heavy Machinery

Benchmark Electrical Solutions
09.2018 - 07.2019
  • Install ¾” to 2” conduit both underground and above ground
  • Cut and Bend conduit
  • Install Heat Trace
  • Terminate Heat Trace
  • Troubleshoot Heat Trace
  • Terminate some panels
  • Terminate Transformers
  • Install Cable Tray
  • Site Safety Coordinator
  • Operate Heavy Equipment

Loenbro
08.2017 - 08.2018
  • Safeland training
  • Install Conduit both underground and above ground
  • Install Cable Tray
  • Installed Heat Trace
  • Terminated Heat Trace
  • Installed lights
  • Operate Heavy Equipment
  • Worked in all types of weather from good to bad

MMR
05.2016 - 08.2017
  • Assisted an instrumentation tech install tubing and instruments
  • Installed some tubing and instruments alone
  • Install Conduit both underground and above ground
  • Install Cable Tray
  • Pull wire
  • Grounding

Elkhorn
06.2015 - 05.2016
  • Pull wire
  • Install conduit both underground and above ground
  • Install cable tray
  • Install lights

Wayne’s Electric
04.2014 - 06.2015
  • Install one-line service
  • Install ¾” to 3” EMT Conduit
  • Install Underground conduit
  • Commercial and Industrial
  • Install switches, receptacles, lights
  • Rough in apartment units

Education

4th Year - Electrical

ABCRM
Centennial, CO
01-2024

3rd Year - Electrical

ABCRM
Centennial, CO
12-2023

2nd year - Electrical

ABC Rocky Mountain
Centennial, CO
12-2023

1st year - Electrical

IECRM
Northglenn, CO
02-2022

Skills

  • Colorado and Wyoming Journeyman License
  • Strong leadership
  • Communication
  • Problem solving
  • Technical expertise
  • Attention to detail
  • Safety compliance
  • Schematics interpretation
  • Blueprint reading
  • Codes compliance

Certification

NFPA 70E

OSHA 10-Hour Construction

Languages

English
Spanish

Timeline

QAQC Lead Tech

Loenbro
03.2025 - Current

Commissioning Foreman

Tradeforce Staffing Solutions (CYS42)
07.2023 - 02.2025

Electrician Lead Hand

Tradesmen International (CYS 41)
02.2023 - 05.2023

Electrician

Adkins Electrical Services
06.2022 - 02.2023

Electrician Top Helper

The Premier Group
04.2022 - 06.2022

Electrician Technician

Casey Industrial
09.2021 - 01.2022

Unlicensed Journeyman

AT Electric
12.2019 - 02.2020

Wanzek Construction Inc.
07.2019 - 12.2019

Benchmark Electrical Solutions
09.2018 - 07.2019

Loenbro
08.2017 - 08.2018

MMR
05.2016 - 08.2017

Elkhorn
06.2015 - 05.2016

Wayne’s Electric
04.2014 - 06.2015

3rd Year - Electrical

ABCRM

2nd year - Electrical

ABC Rocky Mountain

1st year - Electrical

IECRM

4th Year - Electrical

ABCRM
HECTOR SOLIS