Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Heriberto Avellaneda

Humble,TX

Summary

Accomplished Boilermaker and Tower Foreman with a proven track record at REPCON, adept in structural fabrication and mechanical troubleshooting. Demonstrates exceptional leadership by enhancing safety standards and boosting team productivity. Skilled in blueprint interpretation and rigging techniques, consistently delivering projects that meet stringent quality standards.

Overview

19
19
years of professional experience

Work History

Lead Boilermaker

REPCON
09.2022 - Current
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Interpreted blueprints, sketches, and specifications for each job.
  • Utilized specialized tools and machinery to complete repairs and installation.

Tower Foreman

Sulzer Chemtech
01.2006 - Current
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Ensured timely completion of projects by creating detailed schedules and delegating tasks to appropriate team members.
  • Identified issues with antenna system components and applied troubleshooting techniques.
  • Enhanced safety standards by conducting regular equipment inspections and enforcing strict adherence to safety guidelines.
  • Tracked company trucks, safety kits, test equipment, and supplies.
  • Maintained accurate records of completed work, providing transparency into the progress of ongoing projects.
  • Determined required installation methods and assembled proper tools and equipment to complete projects to specifications.
  • Performed tower construction at heights of Number feet while maintaining focus on safety.
  • Lifted equipment into position using cranes, rigging tools and gin poles.
  • Evaluated final results to determine quality levels and isolate root causes of any identified faults.
  • Enhanced customer satisfaction ratings by motivating team members to strengthen quality and increase productivity.
  • Supervised team of installers and mechanics to complete work on time and to company standards.
  • Managed efficient teams of up to Number employees.
  • Utilized proper tools and materials to adhere to safety guidelines.
  • Assisted in rigging operations for safe hoisting of heavy equipment on towers during installation projects.
  • Contributed to positive team morale by maintaining a professional attitude among challenging weather conditions or difficult job sites.
  • Bolted equipment into place using hand and power tools.
  • Enhanced tower safety by conducting thorough inspections and maintenance tasks regularly.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Passionate about learning and committed to continual improvement.
  • Assisted with day-to-day operations, working efficiently and productively with all team members.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Worked well in a team setting, providing support and guidance.
  • Excellent communication skills, both verbal and written.
  • Proven ability to learn quickly and adapt to new situations.
  • Skilled at working independently and collaboratively in a team environment.
  • Worked effectively in fast-paced environments.
  • Promoted culture of safety first, conducting regular checks on personal protective equipment and ensuring compliance.

Boilermaker

Us I
04.2017 - 12.2017
  • Identified issues and addressed each immediately with job foreman.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.

Boilermaker

Turner
01.2017 - 11.2017
  • Identified issues and addressed each immediately with job foreman.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Increased workplace safety by conducting thorough inspections of boiler systems and components.
  • Utilized specialized tools and machinery to complete repairs and installation.
  • Achieved timely project completion by effectively managing resources, schedules, and deadlines while working on multiple projects simultaneously.
  • Contributed to project success, delivering components that met stringent quality standards.

Tower Foreman

Ohmstede Industrial Services
10.2014 - 11.2015
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Ensured timely completion of projects by creating detailed schedules and delegating tasks to appropriate team members.
  • Conducted thorough site evaluations before each project commencement, identifying potential challenges early on to mitigate risks proactively.

Boilermaker

Performance
12.2013 - 10.2014
  • Identified issues and addressed each immediately with job foreman.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Dismantled equipment or devices to gain access and remove defective parts or components.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.

Education

High School Diploma - Basics

Galena Park High
Galena Park, TX
05.2004

Skills

  • Structural fabrication
  • Plasma cutting
  • Metal forming
  • Pipe fitting
  • Rigging Techniques
  • Blueprint Interpretation
  • Boiler installation
  • Pressure vessel knowledge

Languages

Spanish
Full Professional

Timeline

Lead Boilermaker

REPCON
09.2022 - Current

Boilermaker

Us I
04.2017 - 12.2017

Boilermaker

Turner
01.2017 - 11.2017

Tower Foreman

Ohmstede Industrial Services
10.2014 - 11.2015

Boilermaker

Performance
12.2013 - 10.2014

Tower Foreman

Sulzer Chemtech
01.2006 - Current

High School Diploma - Basics

Galena Park High
Heriberto Avellaneda