Summary
Overview
Work History
Education
Skills
Timeline
Generic

Himani Paradkar (Patel)

Summary

Motivated Petroleum engineer with 7.5 years of oil and gas experience across production, reservoir, completions, and drilling engineering. Known for disciplined execution, deadline adherence, and detail-focused, team-based problem solving.

Overview

10
10
years of professional experience

Work History

Wells Intervention Engineer

BP (BPX)
Houston, TX
07.2023 - Current
  • Manage well intervention programs across Haynesville and Eagleford assets, including refracs, coil and lateral cleanouts, P&As, tubing installs, snubbing, and rigless activities to ensure operational success.
  • Lead refrac preparation and execution workflows, emphasizing equipment logistics and coordination between completions and reservoir teams to enhance operational efficiency.
  • Executed frac-hit mitigation strategies, including continuous pumping, to proactively reduce the risk of frac-hits.
  • Developed Automation Tools to improve operational efficiency such as a digitized handover between teams and a Monthly Rig Line Dashboard which replaces manual processes and enables data driven decision making.

Production Engineer

Ovintiv Inc.
Houston, TX
06.2022 - 06.2023
  • Planned and executed well POPs, workover programs, plunger lift optimization, and gas lift design, enhancing production through real-time surveillance and performance analytics in Anadarko Basin.
  • Led Anadarko Acid Stimulation program achieving 300% ROR, collaborating with reservoir characterization team for candidate selection and field team for implementation.

Drilling and Completions Engineer

Ovintiv Inc.
Houston, TX
06.2021 - 06.2022
  • Implemented field-wide water quality monitoring program by collaborating with chemical vendors to assess water quality impacts on well performance.
  • Managed Spudder Rig program for Anadarko field, coordinating with planning, regulatory, and land teams to ensure timely surface casing installation.

Production Engineer

Ovintiv Inc.
Okarche, OK
07.2020 - 06.2021
  • Reduced gas lift usage by 20% with estimated yearly savings of 1.8 MM by putting wells on an automated gas lift reduction program.
  • Completed field rotation, acquiring operator responsibilities, facilitating setup on location, and implementing plunger strategies.

Reservoir Engineer

Ovintiv Inc.
Houston, TX
07.2019 - 07.2020
  • Developed integrated Spotfire dashboards consolidating drilling, completions, and production datasets, improving asset-level decision-making.
  • Co-led yearly Depletion Plan, scoping asset to develop type curves for geological formations and analyzing ROI and payout for each type curve.

Reservoir Engineering Intern

Newfield Exploration
Houston, TX
05.2018 - 08.2018
  • Analyzed deep gas resource potential in Uinta Basin to address decreasing gas forecast YOY and communicated with Land, Regulatory, Drilling, and Completion teams to assess project feasibility.

Production Field Intern

Newfield Exploration
Okarche, OK
05.2017 - 08.2017
  • Tested catalytic heater in the field, reducing methanol injection usage and saving $0.55 million over one year.

Education

Bachelor of Science - Petroleum Engineering

The University of Texas at Austin
Austin, TX
05-2019

Skills

  • Production optimization
  • Project management
  • Process improvement
  • IT proficiency
  • Analytical thinking
  • Cross-functional communication

Timeline

Wells Intervention Engineer

BP (BPX)
07.2023 - Current

Production Engineer

Ovintiv Inc.
06.2022 - 06.2023

Drilling and Completions Engineer

Ovintiv Inc.
06.2021 - 06.2022

Production Engineer

Ovintiv Inc.
07.2020 - 06.2021

Reservoir Engineer

Ovintiv Inc.
07.2019 - 07.2020

Reservoir Engineering Intern

Newfield Exploration
05.2018 - 08.2018

Production Field Intern

Newfield Exploration
05.2017 - 08.2017

Bachelor of Science - Petroleum Engineering

The University of Texas at Austin
Himani Paradkar (Patel)