Successful planner with strong background in SAP. Working with purchasers, and management for parts being here when needed.
Work History
Planner
6 Years 8 Months
Wabash National Corporation | Lafayette, IN | 03.2020 - Current
Organized supply of materials to meet production demands efficiently. of materials, meeting production schedules and minimum safety stock levels.
Monitored inventory levels for steel, parts, and finished goods.
Reviewed work orders, bills of materials, and routing changes.
Tracked shortages and released materials to maintain workflow continuity.
Maintained steady flow of material without exceeding resources and kept manufacturing lines operational.
Partnered with suppliers, buyers, schedulers, shipping and receiving, quality and production teams to promote timely delivery, availability and production usage of materials for optimal production.
Identified potential problems and created solutions to mitigate risks associated with projects.
Used daily system logs to document production information, discussing issues with management.
Ensured all team members were aware of their roles and responsibilities and had necessary resources available.
Received incoming shipments and reviewed contents against purchase order for accuracy.
Laborer Operator
25 Years 6 Months
Wabash National Corporation | Lafayette, IN | 09.1994 - 03.2020
Operated production equipment on Wabash National Corporation manufacturing lines.
Maintained and operated heavy machinery in a safe and efficient manner.
Conducted pre-operational safety checks on equipment to ensure proper functioning.
Loaded both raw materials and finished components to support manufacturing and production processes.
Assisted team members with heavy lifting and line preparation.
Positioned parts and supplies for assembly operations.
Reported equipment issues to supervisors and maintenance staff.
Repaired and replaced worn or damaged parts on machines as needed.
Inspected materials for damage before production use.
Inspected finished products for quality assurance purposes.
Cleaned work areas to maintain safety standards and prevent accidents.
Maintained clean work areas and followed plant safety procedures.
Ensured all safety regulations were followed throughout the duration of the project.
Identified potential hazards at job sites and took steps to mitigate them.
Promoted continuous improvement of workplace safety and environmental practices.
Oversaw proper PPE use to facilitate working conditions compliant with safety regulations.
Organized materials needed for each job task prior to starting work.
Used hand tools such as hammers, saws, drills, wrenches for various operations.
Communicated effectively with team members about relevant work matters.
Performed demanding physical work over extended periods and modeled positive attitude.
Followed instructions from supervisors regarding specific tasks to be completed.
Understood how to operate and maintain job site equipment safely and for maximum productivity.
Performed demanding physical work over extended periods and modeled positive attitude.
Education
North White High School | Monon, IN
Skills
Material planning
Bill of materials
Production planning
Material requirements
Work order review
Inventory control
Accomplishments
20+ years perfect attendance.
Planner/warehouse helper
Since becoming a planner at the East plant I have worked in the warehouse doing kan ban, delivery parts to the line, having duties of making sure flats were loaded for Cross-roads, North or South plant getting loaded and transferred, calling drop lot to pick-up trailers, make sure fork truck driver is doing task he needs to do. Working with SAP doing BOM’s controlling the amount of material that is needed for what we are building.
Sr. Maintenance Materials Coordinator/ Planner at Sadara Chemical (Chem II TDI Unit)Sr. Maintenance Materials Coordinator/ Planner at Sadara Chemical (Chem II TDI Unit)