Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Community Service
SUPPORTING DOCUMENT
Generic
Horace English

Horace English

BRONX,USA

Summary

To work for a company interested in high quality products, building as necessary and supervising/estimating regularly.

Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level [Job Title] position. Ready to help team achieve company goals.

Dynamic individual with hands-on experience in [Area of expertise] and talent for navigating challenges. Brings strong problem-solving skills and proactive approach to new tasks. Known for adaptability, creativity, and results-oriented mindset. Committed to making meaningful contributions and advancing organizational goals.

Overview

27
27
years of professional experience
1
1
Certification

Work History

OPERATION MAINTENANCE

Jamestown pier 57
01.2025 - Current
  • Monitor climate control systems, daily report, light electrical and plumbing, painting and minor repairs.

CEO

SIR ENGLISH CONSTRUCTION
01.2020 - 01.2024
  • Running my own company in Jamaica design and build turnkey construction specializes in residential drafting and construction from the design stage through to the planning deportment process. To the handing over of the completion of the construction process.

PROJECT SUPERINTENDENT /P.M

C.S.G CONSTRUCTON
01.2009 - 01.2020
  • Ordering the necessary materials and equipment was an essential task.
  • Employment of labor force and pay roll assistance
  • Time management and cost wore kept at a minimum
  • Responsible for up to 20+ company employees
  • Responsible for all building layouts and supervision, daily reports, site safety
  • In charge of all new hires /SUBS and getting they acclimated to their new positions

TEEMS LEADER

CI PREE CAST
01.2003 - 01.2008
  • Ensure optimal work quality and customer service –selected achievements –responsible for all roofs framing interior layouts and framing
  • Responsible for all millwork doors and window installment
  • Gained practical hands-on knowledge of all aspect of home construction

CONSTRUCTION FOREMAN

MALCOM REPAIRS AND CONSTRUCTION
01.1999 - 01.2003
  • Over sight for residential remodeling projects, including. Carpentry, Roofing, Masonry, painting and tile work. Plumbing and HVAC maintenance.
  • Assisted in the completion of home remodeling project
  • Projects ranged from installing simple fixtures to doubling the square footage of a home
  • Earned a reputation as a trusted foreman/ remodeler

Education

Skills

  • Computer
  • AUTO CAD, CHIFE ARTCHITURE
  • MICROSOFT WORD /EXCELL/PROJECTS
  • BUILDER TREND/PLAN SWIFE
  • BLUEBEAM
  • PORCORE
  • CONSTUCTION TOOL USE
  • Various types of hand tools and battery or ac powered
  • Lesser level-transit-theodolite
  • Friendly, positive attitude
  • Teamwork and collaboration
  • Problem-solving
  • Time management
  • Attention to detail

Certification

  • Construction management (associate degree level)
  • AUTO-CAD
  • ARTCHITECTRAL DRAFTING
  • OSHA-62 SAFETY SUPER VISOR CARD
  • OSHA-30
  • SST-CARD
  • FO1-FIRE GUARD
  • SCISSOR LIFT OPERATOR
  • (DOT) FLAGGER
  • CITY & GUILDS- Construction Assessing competence

Languages

English
Professional Working

Timeline

OPERATION MAINTENANCE

Jamestown pier 57
01.2025 - Current

CEO

SIR ENGLISH CONSTRUCTION
01.2020 - 01.2024

PROJECT SUPERINTENDENT /P.M

C.S.G CONSTRUCTON
01.2009 - 01.2020

TEEMS LEADER

CI PREE CAST
01.2003 - 01.2008

CONSTRUCTION FOREMAN

MALCOM REPAIRS AND CONSTRUCTION
01.1999 - 01.2003

Community Service

CAYMAN ISLAND RED CROSS, FIRST AID RESPONDER, 10 YEARS CAYMAN ISLAND RED CROSS, FIRST AID RESPONDER

SUPPORTING DOCUMENT

  • February 11th, 2019
  • Mr. Alan Robinson
  • Public Works Department
  • 370 North Sound Road
  • George Town, Grand Cayman
  • Dear Mr. Robinson
  • TENDER SUBMISSION: Civil Aviation Authority New Headquarters Building PPC-2018-CAA-010-ITT
  • We appreciate the opportunity to participate in this bidding process and are pleased to submit our complete tender. Since receiving the tender documents in early January 2019, we have worked tirelessly on obtaining the best quotes and preparing our most competitive price for the Civil Aviation Authority. Having worked previously with the Civil Aviation Authority on the demolition stage in 2018 we appreciate how important this project is and our intentions are to exceed expectations if we are selected as the preferred bidder.
  • Herein please find the following supporting documents as requested in the tender documents:
  • A) Horace English has been with Cayman Structural Group since the company was founded and he has been the backbone to the company’s success to date. ‘English’ has over 25 years’ experience in construction and his knowledge and understanding of construction methods and techniques is unparalleled. Last year English successfully overseen the construction of over 54,000 sq ft of shell construction at the Periwinkle Development in Phase 1B and an additional 24,000 sq ft completed prior to this in Phase 1A. He has also been at the center of some of our most notable projects including Guy Harvey’s House (SS), Flynn Residence (VDM), Clifton Hunter Site Services & Site Infrastructure (FS), Grey Residence (Yacht Club), Peccarino Residence (SS), Davis Residence (Patrick’s Island), Manistee Residence (Canal Point) Bella Vista Residence (EE), Coral Stone Club House (SMB), Upland Residence (Rum Point), Cox Lumber (BT), Cayman Prep & High (Walkers Road) We are confident that English will ensure a successful outcome on this project.
  • B) Cayman Structural Group Project Team Organization Chart – the project will receive strong oversight from senior management who will monitor the project on a daily basis and also provide contract administration and procurement duties. Please see project org chart attached.
  • C) Construction Schedule –We use a software program called BuilderTrend to manage all of our projects (change orders, product selections, shop drawings/ product sign off along with daily reports). The schedule has been prepared using this software and is best viewed on the software platform. The schedule shows a timeframe of approximately 12 months but we are aiming to deliver the project in a shorter timeframe. Login access to the software can be provided upon request.
  • D) Principal Subcontractors- We have made a preliminary selection of the following subcontractors to assist us in delivering this project to the highest quality of workmanship, within budget and on time. It should be noted that we tested the market with numerous vendors on each scope of work and also ran the first principal costs (for self-performing) in order to ensure we are providing the Authority with the most competitive pricing. The preliminary subcontractor selection is as follows: i. BritHay Electrical.
Horace English