Summary
Overview
Work History
Education
Skills
References
Languages
Timeline
Generic

Hugo Lomeli

Los Angeles,CA

Summary

Looking for a challenging position in structure ceiling installer, drywall and plaster finisher. Laborer with experience in construction, handy work, repair seeking positions. Fast learner full of positive determination to get the job done and able to work in any type of environment. Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

8
8
years of professional experience

Work History

Construction Framer

Crew Builders inc
Irvine, CA
08.2018 - Current
  • Measured and cut lumber to specified size, using power saws and hand tools.
  • Framed interior wall partitions made of gypsum board or other materials.
  • Secured timbers or lumber with nails or bolts according to blueprint specifications.
  • Cut openings in walls or floors to accommodate pipes and duct work.
  • Filled nail holes, cracks in walls or joints between panels with caulking material.
  • Erected wooden structures such as rafters, studding, joists and trusses.
  • Aligned frames with plumb bobs, levels and laser equipment.
  • Read blueprints or instructions to determine the type of framing required.
  • Assisted carpenters in the installation of cabinets, doors or trim moldings.
  • Repaired damaged framework by replacing broken pieces with new material.
  • Ensured that all building codes were met during the construction process.
  • Installed roofing felt, shingles and siding on exterior of buildings.
  • Assembled and erected forms for pouring concrete foundations, walls, columns and slabs.
  • Installed window frames into walls before covering them with drywall.
  • Inspected ceiling joists, wall studs and floor beams prior to installation.
  • Cleaned up job sites upon completion of work by disposing of any unused materials according to municipal regulations.
  • Repaired damaged sections of framing using appropriate materials such as treated lumber or galvanized nails.
  • Placed protective coverings over finished surfaces while working in order to prevent damage caused by tools or debris.
  • Attached insulation material between wall studs or ceiling joists to provide thermal protection.

Framer, Structure Cabling, and Ceiling Installer

Baker Triangle
Mesquite, TX
06.2016 - 04.2018
  • Measured, cut, and spliced wires and cables using hand tools

  • Frequently evaluated workspaces to maintain organization.
  • Adapted to changing priorities in a fast-paced environment.
  • Implemented quality control measures in all repair work performed.
  • Ceiling, Framer, and Drywall Installer
  • Structured Cabling and Electric Curtains Installer
  • Traveled between two cities due to fast learning and leadership skills.

Education

High school graduate - General Studies

06.2011

Skills

  • Inspect completed work and ensure necessary corrections are made
  • Osha regulation compliance
  • Efficient
  • Work well with other trades
  • Creative problem solver
  • Power Tool Operation
  • Window Installation
  • Drywall Installation
  • Knowledge of raw materials
  • Structure building methods
  • Machine repair
  • Able to lift 100 pounds

References

  • Abraham Ponce, Resume: Owner, (469)348-1650
  • Javier Herrera, Manager, (214)704-5183
  • Bakers Triangle, Dallas office, (972)289-5534

Languages

Spanish
Professional

Timeline

Construction Framer

Crew Builders inc
08.2018 - Current

Framer, Structure Cabling, and Ceiling Installer

Baker Triangle
06.2016 - 04.2018

High school graduate - General Studies

Hugo Lomeli