Summary
Overview
Work History
Education
Skills
Timeline
Generic

Hugo Rodriguez

North Bergen,NJ

Summary

Proven construction professional with extensive experience at ATI Restoration, showcasing expertise in drywall installation and a strong commitment to team collaboration. Excelled in fast-paced environments, consistently meeting project deadlines and exceeding quality standards. Demonstrated proficiency in heavy equipment operation and a keen ability to enhance worksite safety, contributing to successful project completions with lasting results. Skilled Labor Worker with strong track record of success in maintenance, repair and general labor. Multitasks and works well in fast-paced, high-volume environments. Flexible work and shift schedule with expertise operating basic hand and power tools. Excellent work performance in individual and team roles combined with superior attendance record.

Overview

2
2
years of professional experience

Work History

Construction Worker

ATI Restoration
02.2022 - 11.2023
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Operated forklifts and boom lifts to complete various tasks.
  • Helped with door and window installations.
  • Worked on sites, installing roofs and other exterior components.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Ensured long-lasting results by applying tape, spackle, and joint compound to seams between drywall panels.
  • Prepared panels by sawing, drilling or cutting holes for electrical outlets, air-conditioning units and plumbing.
  • Carried out repair and maintenance tasks on damaged drywall to restore it to its original condition.

Education

Master of Science -

Caracciolo Parra Leon
Venezuela

Skills

  • Construction
  • Power Tool Operation
  • Team Collaboration
  • Worksite safety
  • Truck loading
  • Equipment Operation
  • Painting and finishing
  • Flooring Installation
  • Carpentry
  • Demolition experience
  • Site preparation
  • Drywall hanging
  • Demolition
  • Heavy Equipment Operation
  • Drywall Installation
  • OSHA Regulations
  • Punctual and Dependable
  • Physical Strength and Stamina

Timeline

Construction Worker

ATI Restoration
02.2022 - 11.2023

Master of Science -

Caracciolo Parra Leon
Hugo Rodriguez