INDRANIL DAS

Principal Engineer
Orlando,Florida

Summary

Hardworking Technical Lead proficient in quality assurance, equipment management and resource utilization. Oversees [Type] development utilizing [Type] methodology. Successful at leading both internal and external teams to accomplish challenging objectives.

Overview

1
1
Language
1
1
Certification
9
9
years of post-secondary education
30
30
years of professional experience

Work History

Plant layout Cognizant Engineer/ Technical Lead / Package Lead

Siemens Energy Inc
07.2016 - Current

Cognizant Engineer, Vendor/Supply Chain/Architect Engineer/PM

04.2018 - 12.2018
  • Supporting in modularized pipe rack fabrication by participating/ reviewing fabrication models from fabricator and also Factory Acceptance Test at fabricator’s workshop.
  • Interdisciplinary review and coordinated development tasks/ solutions to cross location Architect Engineering team.
  • Providing response/recommendations for customer open point item for achieving provisional/final acceptance certificate.
  • Pneumatic vs Motor Operated Valve study and subsequent cost optimization.
  • Responsible for creating compelling technical concepts in Technical Feasibility Documents.
  • Accomplishments:.
  • Contributed to successful supply, erection and execution of EOT crane in Lordstown.
  • Contributed to successful completion and erection of modular pipe rack.
  • Contributed to successful Project Acceptance from Lordstown customer within agreed time frame.
  • Package Lead (Plant Layout/Mechanical) for El Campesino Combined Cycle Power Plant (from December 2016 – March 2017 : 100%).
  • Expediting Plant layout/Mechanical scope of commodities as required for the project.
  • Performed field erected tank technical evaluation in coordination with Architect Engineer/ Supply Chain.
  • Led and managed the work-stream for a team of engineers within the identity space.
  • Accomplishments:.
  • Ensured technical interface, planning and design requirements related to all engineering discipline areas are clearly defined.
  • Ensured design requirements are within estimated budgeted cost of the project.
  • Plant Layout Technical Lead for Renaissance Combined Cycle Power Plant (from January 2018 – May 2018: 100%).
  • Responsible for creating compelling technical concepts in Technical Feasibility Documents accepted and approved by customer.
  • Prepared general contractor handover work package for Piping and Mechanical.
  • Coordinated and deployed weekly releases to cross location interdisciplinary team and was responsible for monitoring of team within team’s domain of ownership.

Cognizant Engineer

Power Plant
07.2016 - 11.2016

Coordination with Architect Engineer/ Engineer of Record

Siemens Power Engineering Pvt Ltd
10.1999 - 07.2016
  • Seamless acceptance by customer of technical concepts of combined cycle power plant layout, firefighting.
  • Plant Layout Technical Lead for Combined Cycle Power Plant at Naval Station Guantanamo Bay (from June 2017 – September 2017: 50%, June 2018 – September 2018 : 100%, Feb 2019- till date: 100%).
  • Preparing concept layout, specification complying with Navy standards.
  • Coordinating with Supply Chain/ EOR for respective scope of commodities and providing cost estimate for piping and commodities for Project budgeting.
  • Developing and presenting technical project plans to Project Engineering Management and executed on the plans.
  • Interdisciplinary review and coordinating development tasks/ solutions to cross location Architect Engineering team.
  • Providing solutions and guidance to internal and external interdisciplinary team of engineers.
  • Coordinating and deploying weekly releases to cross location interdisciplinary team and was responsible for monitoring of team within team’s domain of ownership Accomplishments:.
  • Contributed to successful project award for Siemens.
  • Ensuring technical interface, planning and design requirements related to all engineering discipline areas are clearly defined.
  • Ensuring design requirements are within estimated budgeted cost of the project Proposal Layout Lead for San Pedro Combined Cycle Power (from June 2017 – September 2017: 50%).
  • Preparing concept layout during proposal phase, specification complying with customer requirements.
  • Coordination with AE from plant layout and piping scope.
  • Accomplishments:.
  • Contributed to successful project award for Siemens.

Senior Manager

Siemens Ltd, SPEL, Power Engg Pvt. Ltd
Siemens
10.2014 - 06.2016
  • Project Manager – 3D Planning (Jebel Ali M Extension.

Project Manager, Team Leader

05.2012 - 10.2014
  • In plant layout planning, optimization, scheduling, interdisciplinary coordination, coordination with customer and site execution.
  • Lead and managed the work-stream for 10-15-member interdisciplinary engineering personnel providing engineering solutions for the above-mentioned project.
  • Coordinated and deployed weekly releases and was responsible for monitoring of team within team’s domain of ownership.
  • Responsible as an engineering planning interface between customer and Siemens.
  • Responsible for planning workloads and productivity goals for subordinate team members.
  • Accomplishments:.
  • Ensured technical interface, planning and design requirements related to all engineering discipline areas are clearly defined.
  • Group head for Oil & Gas C&S ISS Off-shore Module design at SPEL, for all WP OG water treatment package modules.
  • Actively involved in plant layout planning optimization Complete self-initiated understanding/learning of the water treatment process for the oil exploration part.
  • First time planning/development for complete factory fabricated water treatment skids for Ivar Aasen, Edward Greig Platform.
  • Seamless coordination with fabrication yard and the business partners at Norway.
  • Accomplishments:.
  • Contributed to successful Project Acceptance from customer within agreed time frame and budget.
  • First time planned/developed/executed for complete factory fabricated water treatment skids for Ivar Aasen, Edward Greig Platform.

Team Leader

01.2009 - 01.2012
  • Actively involved in plant layout planning and interdisciplinary team coordination: First time planning/development for complete factory fabricated pipe rack module in power plants for 50/60 Hz region.
  • Performed preliminary planning based on FEED study from Orlando region for EPCOR and Summit IGCC projects.
  • Accomplishments:.
  • Contributed to successful implementation of Pipe rack module La Caridad.(MX1006/ MX1007) Site Coordination engineer for 3 months in the project Az Zour South power plant (8 X 125 MW) – Kuwait.
  • Involved in site interface clarification, Interface detailing.
  • Also performed the outdoor facilities basic planning and executing the planning.
  • Also responsible for civil BOQ estimate and monitoring.
  • Review engineer for civil/ architecture for Civil Plant Layout designs of SPEL Projects (2009 – 2012).

Education

Degree Issued Date of Degree - Building Technology & Construction Management

Jadavpur University
01.1991 - 08.1999

B.Arch - undefined

Post - Architecture

MTech 6th - undefined

IIT Chennai

undefined

Skills

Systems Development Lifecycle Management

undefined

Software

Intergraph PDS, SP3D Civil Modeling, Micro station, Smart sketch, MS Office

Certification

NFPA

Timeline

Cognizant Engineer, Vendor/Supply Chain/Architect Engineer/PM

04.2018 - 12.2018

Plant layout Cognizant Engineer/ Technical Lead / Package Lead

Siemens Energy Inc
07.2016 - Current

Cognizant Engineer

Power Plant
07.2016 - 11.2016

Senior Manager

Siemens Ltd, SPEL, Power Engg Pvt. Ltd
10.2014 - 06.2016

Project Manager, Team Leader

05.2012 - 10.2014

Team Leader

01.2009 - 01.2012

Coordination with Architect Engineer/ Engineer of Record

Siemens Power Engineering Pvt Ltd
10.1999 - 07.2016

Degree Issued Date of Degree - Building Technology & Construction Management

Jadavpur University
01.1991 - 08.1999

undefined

MTech 6th - undefined

IIT Chennai

Post - Architecture

B.Arch - undefined

INDRANIL DASPrincipal Engineer