Project Engineer & Co ordinator

M/s. RAMBØLL, Denmark
12.2011 - Current
  • Design and detailing of 4 overpass and one underpass
  • Project planning and coordination
  • Co ordinating with team in the Detail Design of two span continuous PSC Single spine and three spine girder superstructure, substructure & foundation for spans of 25m to 40m.
  • Preparation and checking of Numeration and Reinforcement drawing for four overpass.
  • Interacting with client for the planning and completion of task.
  • Project Name: Helsingor Motorway Bridges

Senior Engineering Consultant

L&T-RAMBØLL Consulting Engineers Limited
06.2007 - Current
  • Have considerable experience in structural design of Bridges and involved in the co-ordinating & designing of Metro rail project (HMRL). Well versed with design procedures as per IRC, Euro codes and IS. Capable in design of PSC superstructure, simply supported bridges and Continuous Bridges. Hands on experience in software packages like, STAAD Pro, Auto CAD & LUSAS.
  • Had worked in the detailed design of Road Project like VUPs, PUPs, Major Bridges, Minor Bridges and in the preparation of tender document, Estimates and BOQs.

Project Engineer & Co ordinator

Simhapuri Expressway Limited
07.2011 - 11.2011
  • 6 Major bridge, 10 Minor bridges, 6 Flyovers, 2 Over passes, 4 Vehicular underpasses, 13 Pedestrian underpasses & 85 numbers of box/pipe culverts. The bridges are off deck continuous/integrated/simply supported. Foundations are both Shallow/deep(pile).
  • Analysis and design of Twin cell RCC/PSC simply supported Box girder superstructure.
  • Analysis and design of substructure and foundation.
  • Preparation of GADS, Numeration, reinforcement drawings and documentation for flyovers of 25m to 40m length
  • Project Name: Six Laning Of Chilkaluripet-Nellore Section Of NH5

Project Engineer & Co ordinator

M/s. RAMBØLL, Denmark
01.2011 - 06.2011
  • Preliminary design of 15 bridges
  • Preparation of GADs and preliminary drawings for 15 bridges.
  • Project Name: Fredriksund Motorway bridge

Project Engineer & Co ordinator

L&T ECC
10.2010 - 01.2011
  • Standard Design for three corridors strectching 71kms.
  • Co ordinating with team in the design of Substructure and foundation for simply supported PSC segmental Box Girder, Segmental U trough, PSC I girder and Pretensioned U trough.
  • Preparation of drawings and QA check for design and drawings.
  • Project Name: Hyderabad Metro Rail Project

Project Engineer

L&T- Infrastructure OC, Chennai
01.2010 - 01.2010
  • Detailed Design of two lane, four lane, and six lane ramps, Merging ramps and preparation of BOQs.
  • Preparation of GADs
  • Detail Design of post-tensioned PSC and RCC Spine beam superstructure, substructure and foundation.
  • Preparation of drawings.
  • Project Name: CSIA Forecourt Superstructure

Project Engineer

L&T- Infrastructure OC, Chennai
11.2009 - 11.2009
  • Preparation of BOQs and preliminary drawings for the flyovers, culverts, andunderpass on the stretch of Hyderabad and Bangalore.
  • Preparation of BOQ, Rate Analysis & Tender Documents
  • Preparation of GADs
  • Project Name: Tender Engineering of Hyderabad – Bangalore Flyover

Project Engineer

L&T- Transco PVT Ltd, Chennai
08.2009 - 08.2009
  • Preparation of BOQs and preliminary drawings for the flyovers, culverts, andunderpass on the stretch of Pune-Satara.
  • Preparation of BOQ, Rate Analysis & Tender Documents
  • Preparation of GADs
  • Project Name: Tender Engineering of Pune - Satara

Project Engineer

L&T – ECC, Chennai
02.2009 - 02.2009
  • Detailed design of major bridges, Culverts,underpass and flyovers
  • Analysis and design of PSC I girder superstructure.
  • Analysis and design of substructure and foundation.
  • Preparation of GADS, Numeration, reinforcement drawings and documentation for major bridges.
  • Project Name: Six Laning Of Chennai-Tada

Project Engineer

Airport Authority of India, Chennai
08.2008 - 08.2008
  • Detailed Design of RCC/ Prestressed concrete bridge across River Adyar. The bridge consists of runway portion, taxiway portion and half strength portion. The bridge is constructed at the touch down zone of the aircraft.
  • The runway portion and taxiway portion is designed for the maximum aircraft load of A380 airbus. The half strength portion is designed for the 50% of runway live load and for the tanker load. The bridge is of approximately 200m wide and 470m length.
  • Design of Pre-Tensioned I Girder for A380 Airbus Load.
  • Getting approval from IIT.
  • Preparation of documentation and drawings for the superstructure and substructure.
  • Project Name: AAI Runway Bridge

Project Engineer

L&T-ECC, Chennai
02.2008 - 02.2008
  • Detailed design of viaduct
  • Design of superstructure for longitudinal and transverse structure.
  • Design of Substructure and foundation
  • Preparation of drawings and co coordinating with draftsperson.
  • Preparation of plate model and extracted the output for validating the design to the proof consultancy.
  • Project Name: Access Link to CSIA

Project Engineer

Delhi Development Authority
02.2008 - 02.2008
  • 3 clover leaves from existing flyover over NH crossing
  • RCC solid box superstructure with deck continuous over piers
  • Max span 21m, min radius 40m
  • Underpass cum RUB of 1120m length (380m closed portion with box section by cut-& cover, 180m closed portion by box pushing method & 560 m open portion with U-trough
  • Underpass for Cyclist & Pedestrian
  • Detail Design of RCC superstructure & substructure for clover leaves
  • Detail Design of RCC box section & U-trough retaining structure for RUB
  • Proof checking of Bearing & RW Wall drawings
  • Project Name: Clover Leaves& Underpass at Sarita Vihar, New Delhi

Project Engineer

DS Constructions, India
06.2007 - 06.2007
  • Detailed design of 4 ROBs as part of the Development of access controlled 4/6 lane in Kundli-Manesar-Palwal expressway in Haryana
  • Analysis of Decks slab-PSC I-Girder system by Grillage Analysis
  • Transverse Analysis and Design of Deck Slabs
  • Preparation of GADs and Reinforcement drawings for Superstructure and Substructure.
  • Project Name: KMP Expressway ROBS

Education

M.E. - Infrastructure Engineering

PSG College of Tech.
01.2007

B.E. - Civil Engineering

Government College of Engineering
01.2000

Skills

  • Project management
  • Scheduling and planning
  • Quality control
  • Project estimation

Certification

Internal Auditor Training Course based on ISO 9001: 2008 from TQMI.

Languages

English: Speak - Excellent, Read - Excellent, Write - Excellent
Tamil: Speak - Excellent, Read - Excellent, Write - Excellent
Hindi: Speak - -, Read - -, Write -

Affiliations

None

Timeline

Project Engineer & Co ordinator

M/s. RAMBØLL, Denmark
12.2011 - Current

Project Engineer & Co ordinator

Simhapuri Expressway Limited
07.2011 - 11.2011

Project Engineer & Co ordinator

M/s. RAMBØLL, Denmark
01.2011 - 06.2011

Project Engineer & Co ordinator

L&T ECC
10.2010 - 01.2011

Project Engineer

L&T- Infrastructure OC, Chennai
01.2010 - 01.2010

Project Engineer

L&T- Infrastructure OC, Chennai
11.2009 - 11.2009

Project Engineer

L&T- Transco PVT Ltd, Chennai
08.2009 - 08.2009

Project Engineer

L&T – ECC, Chennai
02.2009 - 02.2009

Project Engineer

Airport Authority of India, Chennai
08.2008 - 08.2008

Project Engineer

L&T-ECC, Chennai
02.2008 - 02.2008

Project Engineer

Delhi Development Authority
02.2008 - 02.2008

Senior Engineering Consultant

L&T-RAMBØLL Consulting Engineers Limited
06.2007 - Current

Project Engineer

DS Constructions, India
06.2007 - 06.2007

B.E. - Civil Engineering

Government College of Engineering

M.E. - Infrastructure Engineering

PSG College of Tech.
Indumathi Chinappan