Professional Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline

Isabella Simmons

DoorDash
COLUMBIA,MO
2
years of professional experience

Early-career apprentice with hands-on piping, quality check, and delivery experience. Known for attention to detail, safety awareness, and accurate task completion.

Adaptable and motivated individual with strong aptitude for hands-on tasks and problem-solving. Possesses foundational knowledge of industry standards, coupled with skills in technical tools and safety procedures. Ready to contribute effectively and grow within professional environment, making positive impact through dedication and attention to detail.

Reliable apprentice with experience installing, assembling, and inspecting piping systems in active jobsite settings. Skilled in work site organization, equipment operation, and communication, with a strong record of following plans, supporting crews, and maintaining safe, clean work areas.

Dependable early-career worker with experience in construction support, quality checks, and customer service. Strong problem-solving skills, safe work habits, and a focus on accurate, efficient results help support team goals and project success.

Work History

DoorDash Driver

1 Year 5 Months
DoorDash | 05.2025 - Current
  • Picked up and delivered orders accurately while following route instructions and delivery timelines.
  • Communicated with customers to provide order updates, resolve delivery issues, and confirm drop-off details.
  • Navigated app-based dispatch system to accept orders, track assignments, and manage delivery flow.
  • Inspected order contents and handled food carefully to maintain quality during transport.

Apprentice

1 Year 2 Months
Questec Mechanical | 07.2025 - 09.2026
  • I have installed water supply, water return for cold and heating piping; I have also installed drain and vent piping according to the prints and specs for the jobsite.
  • I inspected piping systems for leaks, defects, and compliance before project turnover.
  • I've measured, cut, and assembled copper, PVC, and underground fuseal pipes, using hand and power tools.
  • I have also measured, cut, grinded, and helped assemble stainless and carbon steel pipes, as a pipefitter for the welder i was working with, using hand and power tools as well.
  • I always clean up during the day when I have down time, before i move to a different area of the jobsite once I've completed a task, and at the end of the day to ensure a safe and clean working environment, for me and other workers on the jobsite.
  • I was in the prefabrication shop for three months being the Quality Check person before all the different assemblies got loaded up onto the trucks and sent to the jobsites.
  • I have also helped load and strap down pipe ranging from 2in stainless and carbon to 14in stainless and carbon pipes. We loaded them up onto goose neck trailers with just a JAC forklift and straps.
  • I follow safety protocols, including PPE requirements, lockout/tagout practices, hazard awareness, I always make sure to be there for the tool box talk, and i always make sure to sign and read the JSA's in the morning everyday.
  • I received constructive feedback from mentors, and other workers on the jobsite, leading to improved performance and increased knowledge of all the different trades.
  • I have collaborated with cross-functional teams to ensure project requirements were met with high standards and to avoid getting in each other's way while hanging up pipe or putting it on the wall.
  • If and when i had extra time at the end of the day and i know i will be starting a different project the next day I start making a material list with what fittings ill need and the different sizes, i also write down what tools, or different equipment as well, just so I'm already somewhat prepared for the next day or even week depending on what task i need to get done.
  • I always complete task efficiently and accurately based off the prints, specs, and the model if available to help contribute to the overall success of the project. i also double check with my superiors to make sure i did do it correctly.

Host

4 Months
Cheddars Stratch Kitchen | 01.2025 - 05.2025
  • Greeted guests warmly and managed seating flow to maintain smooth front-of-house operations.
  • Monitored wait times and updated incoming guests with accurate, timely information.
  • Coordinated reservations, walk-ins, and lobby organization during busy service periods.
  • Communicated seating updates clearly with servers to balance section workload.
  • Answered phone calls and handled guest inquiries with professionalism and accuracy.
  • Maintained clean, organized host stand and dining area presentation.

Education

High School Diploma

Hickman | 1104 N Providence Rd, Columbia, MO 65203 | 05-2025

I did wrestling in highschool.

Skills

Equipment operation
Safety awareness
Safety compliance
Teamwork
Delivery logistics
Job site organization
Attention to detail

Accomplishments

    By myself i was able to finish a job start to finish in under three days doing over 200 feet of PVC up on the roof on roof blocks connecting them to the AC drains and also puncturing through the roof using Drill Driver and a Hole saw to get through the membrane and the sheet metal, to be able to connect the pipes on the roof to the pipes i had already pre installed inside the building.

    Me and one of the people i worked with, us together was able to do more then 450 feet of PVC doing the exact same thing just in a different area on the roof.

    I was pipe fitting for a welder, we were working on 3/4in stainless steal socket weld, while he was welding i would move onto the next piece and get it cut and prepped for the next weld, i don't remember the amount of feet we ended up putting up but together we cranked out over 50 welds in a single day.

    When i was working on a Air Force base a different guy from the same company i worked with put up over 600 feet of longitudinally welded threaded carbon steel pipes ranging from 3in too 3/4in, unfortunately when i had went down there with one other person to replace that guy we had to take down all that pipe and replace it with seamless pipe because they didn't read the specs until after the pipes were put up onto hangers and clamps. Me and person had to tear down all that pipe, put it back up, make the cuts again and rethread the new pieces, between me and that other person we were able to it in under a month while also keeping busy while we were waiting on the truck with the right pipe.

    When i was at the pre fab shop we had finished a whole assembly package of stainless steel all we had to do was clean the pipe outside, i ended up having to clean over 25 different assemblies that were all 8in pipe and they were all over 4 feet long and what i didn't know until after lunch is that they had to be loaded onto the truck the very next day to get sent down to the job site, that day i stayed later then everyone else besides my boss to be able to get it done so the workers at the jobsite werent waiting another day for the pipe that they needed.

    One of the job sites i was working on was a Highland Dairy Expansion down in Tyler, Texas. One day i got sent to Plumb Supply in Texarkana, Texas to go pick up over 80 feet of pipe by myself because if we waited for Plumb Supply to deliver it would've been another week of waiting on material, for a task that needed to be done before the weekend since we had a shut down planned for that coming weekend.

Timeline

Apprentice

Questec Mechanical
07.2025 - 09.2026Read More

DoorDash Driver

DoorDash
05.2025 - CurrentRead More

Host

Cheddars Stratch Kitchen
01.2025 - 05.2025Read More

Hickman

High School Diploma
Read More
Isabella Simmons