Maintained a safe work environment by enforcing strict adherence to safety protocols and guidelines.
Coordinated cross-functional teams for example Cleaning, Prework and Valve & Coil departments for efficient workflow and timely valve rebuild completion.
Played an instrumental role in successfully completing POD valve rebuilds on time and within work load constraints.
Enhanced production efficiency by implementing streamlined processes and procedures.
Adhered to customer specifications, valve rebuild instructions, improvement orders and valve interchangeable lists for proper rebuild, installation and operation of service equipment.
Prework Technician
GATX Rail
Colton, CA
02.2017 - 06.2020
Effectively delegated work and maintained accurate work detail required for railcars directed to Prework tracks.
Assigned safe Confined Space Entry to rail cars on a daily basis, following all safety protocols.
Assisted with removal of valves from railcars that required service equipment re-qualification or failed Initial Bench Test.
Followed drawings to effectively identify areas on a railcar that needed repair or testing.
Multi Craft Technician
GATX Rail
Colton, CA
10.2014 - 02.2017
Completed maintenance on equipment, ensuring optimal performance and longevity including but not limited to welding, cutting and mechanical repairs.
Improved system reliability by troubleshooting technical issues working with Air Brake equipment.
Conducted daily inspections to maintain high safety standards.
Optimized operational efficiency, performing timely repairs and adjustments to railcars.
Facilitator (Production Supervision) at GE Aerospace Engine Services SingaporeFacilitator (Production Supervision) at GE Aerospace Engine Services Singapore