Anything with Family
Sports-Skiing, Basketball, Tennis, Swimming
Traveling
Antiquing

Dynamic Senior Project Manager with extensive experience in MEP construction. Known for strong decision-making skills and excellent customer service, consistently delivering projects on time and within budget while fostering team collaboration.
Children's Hospital of Richmond-Flow
Coordinated with equipment supplier and
BAS contractor to provide assembled flow
control valves and accessories for all
mechanical/plumbing equipment. Delivered
to site per contractors schedule.
Heat Trace and Controls Serving Sprinkler
System. New Controls coordinating with BAS
and campus wide system.
Existing System. Engineered Drawings and
calculations for submission per contract
documents. Owner training and startup.
New VA Central Forensic Lab
Provided hydronic flow control valves for all mechanical
equipment. Worked with equipment vendors and contractor
to deliver per the schedule requirements. Also provied
specialties for mechanical equipment such as meter/gauges
flex connectors and heat trace.
,
VCU Gladding Residence-$9 Million Mech.
800 Room Dormitory with Samsung VRF and (2) Annex-Air Outside Air Units w/ heat recovery wheels.
JMU Stuent Center-$22 Million MEP
Renovation and addition of a 7 story building for use as a Student Center complete with offices, food court, and student common areas.
Provided 800 hydronic VRV's, 3 cooling towers, air handlers w/ sound attenuators, steam and chilled water piping and accessories from University provided utilities.
Provided plumbing and fixtures for gang and single bathrooms.
Provided all new switchgear, generator, lighting, and fire alarm system in conjunction with JMU standards.
JMU Recreation Center-4.3 Million Electrical
Renovation and large addition to existing rec center. Provied new lighting, distribution panels to existing switchgear serving new mechanical equipment. Coodinated with mechanical contractor on new natatorium pool unit.
MWU Convocation Center-4.5 Million M,P
New Convocation Center and concession space.
(2) Centrificual air cooled chillers, VAV's and accesories.
New Plumbing and Fixtures.
VCU School of Dentistry-4 Million M,P
New construction for use of training dentist and hygentists.
Utilized steam and chilled water for new AHU's and VAV's.
Installed and certified new medical gas to stations.
Dinwiddie High School-12 Million-M,P
New High School with (2) Outdoor Air Chilllers. (13) Rooftop Units, VAV's, and Boilers for the hydronic and plumbing systems.
New plumbing and gang bathrooms.
Bon Secours Emergency Hospital-3.5 Million
New emergency hospital to serve Goochland County residents.
Geothermal well fields. AHU's, VAV's and accessories.
Provided new pluming and fixtures along with medical gas.
Renovation of (2) Chesterfield Elementary Schools-GC, MEP
Direct to CPS as General Contractor.
New AHU's, lighting, exhaust fans.
New ceiling , and flooring where required.
MWU Remote Campus-M,P-5 Million
New remote campus to serve residents of King William County.
(180) 300' Geothermal wells. Multistack Chiller serving both hot and chilled water to RTU's and VAV's. Heat exchangers and reserve cooling tower.
New plumbing and fixtures.
Completed Project Managers Academy
OSHA 30 Trained
Crane Safety Plan Trained
Lead Base Assement and Removal
Anything with Family
Sports-Skiing, Basketball, Tennis, Swimming
Traveling
Antiquing