Driven and adaptable Production Technician with a proven track record at Caterpillar, showcasing expertise in SAP/MES systems and exceptional time management skills. Excelled in quality control and demonstrated rapid learning ability, significantly enhancing production efficiency. Receptive to feedback, ensuring continuous improvement and operational excellence.
Upper Frame Main Line -
Zone 9 - Working on the alternator. Connecting the AC hoses. Landing and bolting the fuse panel.
Helping install the boom tube pipes.
Zone 10 - Installing the towers and connecting the hoses from the towers.
Zone 15 - Install and connect the batteries.
Zone 16 - Install and bolt down the left hand door module.
Paint-
Masking - masking, plugging, and seam sealing the parts before they went into the paint booth.
Unload- Taking the parts of the line and hosting them to their areas and/or trailers.
Right hand door sub -
Zone 3- Landing the CEM and bolting it down.