Summary
Overview
Work History
Education
Skills
Timeline
Awards
Generic

Jacob Blayze Hilley

Bridge City,TX

Summary

Certified Performance Leadership Skillforce with proven track record of leading cleaning crews to maintain high standards of cleanliness and efficiency. Successfully managed teams to ensure timely and thorough completion of tasks, enhancing overall operational performance. Demonstrated expertise in team leadership and operational planning.

Overview

19
19
years of professional experience

Work History

Certified Rigger

TIC industrial
06.2025 - Current
  • Responsibilities are to select and connect rigging depending on weights of load and center of gravity. Signaling cranes from connection to disconnection of load. Assemble and disassemble of cranes. Understanding and using cranes load charts to stay within capacity of the crane.

Industrial Ironworker/Rigger/Bull rigger/pipefitter/ Supervisor

Performance Contractors
06.2015 - 01.2025
  • Responsibilities with performance further go into the placement of pipe per piping isos and pin ids. Selecting welding procedures per pipe material. Hydro testing pipe and restore for completion. The finalizing of work packages. Process walks and system turnover. The startup and commissioning of process unit.
  • Notable project was supervising and completing the APS furnace and four small furnaces on Exxon’s BLADE project, in Beaumont Texas
  • Final project was Exxons BEAUNS project in Beaumont Texas. My role was Iron supervisor over both boiler and naphtha splitter unit. I was granted a reduction of force upon competition of project.

Industrial Ironworker/Rigger/ Iron supervisor

James Construction Group
06.2012 - 06.2015
  • Responsibilities were to order material per elevation. set and connect steel using drawings. Squaring structures before final bolt up and impacting. To also correctly rig steel members, equipment and pipe into proper location.

Industrial Carpenter/Rod buster/concrete finisher

James Construction Group
01.2010 - 06.2012
  • Responsibilities here were building and setting concrete forms. From surveyed coordinates placed per drawing. Used to set grade and elevation of concrete, anchor bolts and imbeds.
  • Rod busting is the placement and tieing of rebar to reenforce concrete per drawing.
  • Concrete finishing was to order the volume of concrete needed for the forms. The pouring and final finish of concrete.

Assembly Technician

Gasoline Pump Components
10.2006 - 01.2010
  • Responsibilities were the disassembly and assemble of gas pump pumps, cores and meters.

Education

High School -

Northwest Whitfield High School
Tunnel Hill, Georgia
05.2009

Skills

  • OSHA regulations
  • Organizational skills
  • Adaptability and flexibility
  • Team collaboration
  • Safety protocols
  • Task prioritization
  • Equipment operation
  • Self motivation
  • Goal setting
  • Blueprint reading
  • Time management abilities
  • Physical stamina

Timeline

Certified Rigger

TIC industrial
06.2025 - Current

Industrial Ironworker/Rigger/Bull rigger/pipefitter/ Supervisor

Performance Contractors
06.2015 - 01.2025

Industrial Ironworker/Rigger/ Iron supervisor

James Construction Group
06.2012 - 06.2015

Industrial Carpenter/Rod buster/concrete finisher

James Construction Group
01.2010 - 06.2012

Assembly Technician

Gasoline Pump Components
10.2006 - 01.2010

High School -

Northwest Whitfield High School

Awards

High School-FFA- First in county, first in state, second in the nation in Agricultural Mechanical Entrepreneurship,