Mechanical Boilermaker Supervisor with a proven track record at Universal Plant Services, enhancing operational efficiency and quality control. Skilled in blueprint interpretation and leadership, I excel in fostering team excellence and surpassing safety standards, significantly boosting project success rates and equipment reliability.
Overview
8
8
years of professional experience
Work History
Mechanical Boilermaker Supervisor
Universal Plant Services
10.2021 - Current
Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
Maintained compliance with all safety procedures from both client and employer.
Tightened or replaced bolts and gaskets to repair leaks.
Inspected equipment and structures to determine scope of work (SOW).
Built and repaired process tanks, storage tanks and water treatment tanks.
Used hand signals to notify crane operator to lift components to specific positions.
Identified issues and addressed each immediately with job foreman.
Interpreted blueprints, sketches, and specifications for each job.
Dismantled equipment or devices to gain access and remove defective parts or components.
Promoted a culture of continuous improvement within the team, consistently seeking ways to enhance processes and performance standards.
Upheld company reputation for excellence by consistently delivering high-quality workmanship that met or exceeded client expectations.
Inspected equipment, structures and materials to identify cause of errors.
Coordinated movement of materials and equipment to job sites.
Ensured compliance with industry regulations through diligent adherence to codes and guidelines in all tasks performed.
Achieved timely project completion by effectively managing resources, schedules, and deadlines while working on multiple projects simultaneously.
Served as a reliable mentor to new hires, providing guidance and support during their onboarding process.
Boosted team morale and efficiency, providing hands-on training and mentorship to junior boilermakers.
Ensured safety standards were surpassed by conducting detailed inspections and implementing corrective measures.
Mechanical Boilermaker
Turner Industries, Geismar, Louisiana
05.2016 - 10.2019
Utilized specialized tools and machinery to complete repairs and installation.
Enhanced project coordination, liaising effectively with engineers and project managers to clarify requirements.
Facilitated smoother project handovers, meticulously documenting procedures and guidelines.
Contributed to project success, delivering components that met stringent quality standards.
Ensured operational continuity, quickly responding to and resolving emergency repair situations.
Improved longevity and reliability of equipment, executing precision installations and upgrades.
Elevated quality of workmanship, adhering strictly to blueprints and specifications for each project.