

Quality Control Inspector with over 23 years of experience in the oil industry. Committed to improving product quality in manufacturing environments, with total ethics and professionalism. Focused on helping manufacturers eliminate production errors and increase successful manufacturing figures. Providing relevant tests and components for effective quality diagnosis.
Repair, reconstruction and adaptation of drums of the COQUER C train (DCU, MERICHEN, and PG-3).
Major maintenance of the Alkylation Plant
In furnaces, drums, heat exchangers, towers and process lines at the Amuay CRP.
Project for the repair of the DCU COKER plant/Fractional Tower, repair of cracks in Coker drums 42-V-101A/B/C/D.
Construction of slides at the Cardón Refinery of the Paraguaná Refining Complex (CRP).
Project to repair the HMU plant / MTBE plant and Alkylation plant of the Cardón Refinery of the Paraguaná Refining Complex (CRP).
Leak Repair and Partial Repair Project in the different Plants of the Cardón Refinery of the CRP.
Project Work Major Maintenance Zone 2 of units 21 (NHT), 22 (PSA), 31 (ARU), 32 (SWS), 41 (RWS), 42 (CWS), 43 (STM), 44 (AIR), 46 (FGS), 51 (FLR), During the shutdown of the Petromonagas Crude Upgrader. SA
Major maintenance project on boilers, process lines, heat exchangers, pressure vessels at the CRP Cardón Refinery
General maintenance project for the storage tank park at the Amuay Refinery of the CRP.
Gas/Oil Separation Project Phase I and II Installation of Separator 002-V- 10004A and 002-V- 10004B at the Sinovensa Flow Station.
IPC Project Construction of Crude Oil Storage Tanks for the Puerto la Cruz Refinery.
• Dossier preparation
• Basic corrosion and oxidation.
• HF risks and control.
• Confined spaces.
• H2S risks and control.
• Alloy Verification Level 1.
• Ultrasound Level I.
• Penetrating liquids / Magnetic particles Level II.
• Construction of storage tanks in accordance with API-650 / 653 standards.
• Alloy Verification.
• Penetrating Dyes.
• Magnetic Particles.
• Ultrasound.
• Visual Inspection / Hardness Tests.
• Welding Inspection.
• Dossier Preparation.
• Refractory Inspection / Label Points.
• Reading and Interpretation of Plans.
• Isometric Drawings.